SCHEMATIC DIAGRAM
ARRANGEMENT OF LAND & MARINE WINCH AND EQUIPMENT ON THE FLOATING BARGE
6) CONTROL PANEL
To operate this control panel we require 10 kva power supply. We can do auto and also manual operation. We can monitor the load pulled by the land marine winch in the digital display. Total operation of land marine winch, MHDC, Bobbin is control by the control panel.
6) CONTROL PANEL
From the control panel the control socket is connected to Land Marine Pulling winch , to MHDC unit and small Bobbin power pack.
METHODOLOGY FOR OFFSHORE PIPE LAYING Set up of land marine winch over the barge Winch is to be placed over barge. It must be secured welded & positioned on barge. Ensure for necessary strengthening of barge. Rollers placed at the deck level of barge on the front face
The vertical riser will be clamped to the anchor handling barge. Once the pulling of pipe string 250 meters is completed ,next pipe string of 250 meters lying on the pedestal will be pushed on to the rollers with the help of cranes & excavators.
METHODOLOGY FOR OFFSHORE PIPE LAYING The next string is then joined with the first string & necessary tests for joint is completed. Heat shrink sleeve & puff filling to be continued and further pulling continues in line with the above steps till the riser reaches required location.
METHODOLOGY FOR OFFSHORE PIPE LAYING Then the laid pipe shall be observed for any further settlement & shall be arrested with the clamp mounted on the pile. Simultaneously, the same procedure shall be continued for other set of pipe.
ANY QUESTION ?