DOCUMENTATION
System: Customer / Plant: KEU-order no.:
Table of Content
Page
General
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
General-Documents ..................................................................... 4 Plant description.......................................................................... 4 Information fail safe PLC............................................................. 5 BMS / Fail safe system ................................................................ 5 DCS / Visualisation ...................................................................... 5 Signal-exchange BMS DCS ................................................ 5 Plausibility check......................................................................... 6 Emergency shut down switch (190-HS-0526; 190-HS-0527) ..... 6 Oxygen monitoring ...................................................................... 6
Preconditions to be satisfied for initiate burner start sequence7 Start sequence of the plant ......................................................... 7 Interlock system (Main Safety Chain) (All signals Failsafe)...... 8 Burner start Normal Operation ................................................... 9
3 4 5
First start up curing of the refractory lining Temperature control reaction chamber Combustionair
5.1 5.2 5.3
11 12 13
Combustion air blower .............................................................. 13 Combustion air monitoring ....................................................... 14 Combustion air calculation and control ................................... 14
15
6.1 Preconditions to be satisfied before waste gas should be fed into the TO system........................................................................... 15 6.2 Ready for waste disposal .......................................................... 15
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
16
8 9 10 11
Emergency stop buttons Cool down mode Settings of Air Flow and Fuel Gas Furthers:
18 18 18 19
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
General
1.1 General-Documents
Related documents The function representations and explanations to the plant consist of the following documents:
Process Flow diagram = operating and design data P&ID diagram: PJ177-UE114-190-00 Sheet 21/26 Rev. F Instrument list Wiring diagram local panel
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
DCS
The safety functions and states of the plant will be covered and maintained with the BMS or better fail safe system. The none fail safe functionalities will be included in the DCS, e.g. controllers. Which signals belong to either the BMS or the DCS can be found in the signal list. During the plant operation there will be signals, which have to be exchanged between the BMS and the DCS. The most of them will be exchanged during the starting procedure of the burners, and these signals are dependent of the sequence state. E.g., and the next step will be the purge of the plant, the BMS will send a signal to the DCS to drive the combustion air into the purge-condition.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
2 Start of the Plant 2.1 Preconditions to be satisfied for initiate burner start sequence
Preconditions for a safe operation without waste streams
To start the burner start sequence, the following parameters must be fulfilled: Power 380VAC / 220VAC 24VDC available Customers control system (failsafe part and none failsafe part) available Emergency shut down system (failsafe part) available Upstream and downstream equipment from customer to be in safe operation and good condition for burner operation Double block fuel gas valves XV-0523 and XV-0524, ensured to be closed, solenoid valves XY-0523 (fail safe) and XY-0524 (fail safe) de-energized. Close position monitored by limit switches ZSL-0523 and ZSL-0524 Bleed valve fuel gas XV-Tag-No? ensured to be opened. Solenoid valve XY-Tag-No? energized the open position is monitored by limit switches ZSH-Tag-No?. Double block ignition gas XV-0533 and XV-0534, ensured to be closed, solenoid valves XY-0533 (fail safe) and XY-0534 (fail safe) de-energized. Close position monitored by limit switches ZSL-0533 and ZSL-0534 Shut off all waste gas lines, must be ensure by client Instrument air avaible Fuel gas avaible Ignition gas avaible Boiler system ready for operation (e.g. boiler feed water available)
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
If all those conditions are fulfilled, the system indicates ready for reset, and the interlock system can be released, by pushing the button reset interlock system When one of those conditions change, the signal ready for reset disappears or if during operation - the plant will trip and has to be restarted after trouble shooting. A deviation of one of these signals leads to an immediately shutdown, burner trip. The safety chain must be rearmed after coming back to good conditions. The operator gets a message for example main safety chain closed. *) The Pressure Transmitter muss be locatead to follow the European Regulation EN 746-2 upstream the safety shutdown valves and at least SIL 2.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
trip). Natural gas control valve FV-0525 has to move to start position all times starting from its close position. (Here it is to be noted that the natural gas control valve FV-0525 always drives from position 0% into the ignition position ZSL-0525 (fail safe) by ramp the analogue output from0% slowly to correct position and this position is monitored by a position switch. The adjusting of the ignition position must be possible by means of adjusting the end position switch without any change of the software.) Overwrite actual set point combustion air controller FIC-0521 with set point ignition. The combustion air quantity to combustor is to be reduced by ramp to ignition quantity. Burner start sequence waits until combustion air reaches its start amount/ ignition position. The min flow is monitored (fail safe) by FSLL-0522 Energize ignition transformer Waiting time 2 seconds (pre-ignition-time) Energize ignition gas valves XY-0533 (fail safe) and XY-0534 (fail safe). Ignition gas Vales XV-0533 and XV-0534 open. De-energize ignition transformer 2 seconds after ignition valves XY-0533 and XY-0534 went open. Flame has to be detected by BT-0521 or BT-0522 latest 3 seconds after ignition valves XV0533 and XV-0534 went open. Otherwise burner start procedure trips and has to be restarted manually. IGNITION BURNER IN OPERATION is shown on the DCS. Energize XY-0523 (fail safe) and XY-0524 (fail safe) main fuel gas valves XV-0523 and XV0524 went open energize bleed valve XY-Tag-No? bleed valves XV-Tag-No? went open 3 seconds after ignition valves XY-0533 and XY-0534 energized, as long as the flame scanner detects a flame. (Depending on the ignition behavior of the afterburner system it is possible to extend the time between opening of ignition gas valves XV-0533 and XV-0534 and opening of main fuel gas valves XV-0523 and XV-0524. De-energize Ignition valves XY-0533 and XY-0534 Ignition Gas Valve XV-0533 and XV0534 close 3 seconds after main fuel gas valves XV-0523 and XV-0524 went open. Another 10 seconds later, after ignition valves XV-0533 and XV-0534 are closed, the system is on duty and starts running under temperature control. BURNER IN OPERATION is shown on the DCS (and by lamp Burner on duty at the local panel). On that point the burner start is completed. Now the burner system runs with fuel gas and ambient air, and starts heating up to operation temperature by a defined ramp. This ramp is given by the manufacturer of the refractory lining. Sepoint for Combustion air FIC-0521 is ramping up (flexible ramp) to heat up air flow. The heat up behavior will follow the heat up ramps, described in the refractory documentation. Due to the fact that the plant is not meant to be an emergency we will always follow the complete heat up ramp right from the start.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
Now the burner system runs with Fuel gas and ambient air / hot air, and starts heating up to operation temperature as per heat up ramp given by refractory supplier.
When the heat up procedure is done the temperature in the combustion chamber remains at operational temperature. Once the temperature inside the reaction chamber reaches operation temperature for the first time, the release temperature for waste disposal is also fulfilled, (TSL-0521 above low) and the TO system is ready for waste disposal. Release temperature for waste disposal. Now the operator is able to start the waste disposal by pushing the individual push buttons. To avoid high energy peaks due to energy input coming from the wastes streams, the individual can only be started cascaded one after the other. As long as one waste is in start up procedure the other one will be blocked.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
running failure
At the outlet of the fan is a control valves FV-0521, which is controlled by the combustion air controller FIC-0521.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
The minimum operating oxygen level is 2.0 % by volume (wet basis) shall be set as the alarm value. Below this level the unit should be shut down by the operator.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
6.1 Preconditions to be satisfied before waste gas should be fed into the TO system
TO on duty (burner in operation) TO ready for waste gas disposal TSL-0521above low Temperature control fuels FIC-0525 released Temperature control combustion air FIC-0521 released Waste gas shut-off valves closed
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
7.1
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
During cool down mode it is possible to restart the plant by following the above mentioned steps at any time. The disconnection is executed as the following: Controller TY-0521B (combustion air) block Controller TY-0521A (fuel gas) analogue output ramp down to 0% When analogue output is at 0% the control valve FV-0525 is in close position De-energize XY-0523, XY-0524 and XY-Tag-No, natural gas valves XV-0523 & XV-0524 close, bleed valve Tag-No open. Monitored fail safe by position switch ZSL-0523 (fail safe) and ZSL-0524
The plant goes into the cool down mode, in detail described in point 10 of this documentation The ramp must be set during commissioning.
The plant goes into the cool down mode, in detail described in point 10 of this documentation A restart of the plant is possible at any time after solving the problem(s), according to the above described procedures (Chapter 2.4 burner start). The message "cool down mode will disappear then.
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
N:\Projects\VT\TOM\TOM000062_S.C.Rominserv\Emsr\Abwicklungs_Doku\Functionaldescription_110919_1.doc
DOCUMENTATION
System: Customer / Plant: KEU-order no.:
11 Furthers:
If the tail gase and vent gases are not connected the nozzles N4 and N7 need to have cooling air or nitrogen for cooling and purging.