CLAY COUNTY

(as of 11/18/2011) Construction is Underway County Road 209 Replacing the Black Creek Bridge. Superior Construction Company of Jacksonville began November 2, 2009 and should finish in 762 days (Fall of 2011) at a cost of $13,266,870.73. Tom Woods of JEAces is the CEI project manager (904-291-3808). Julie Ostoski/FDOT project manager. (2115602) County Road 315C Resurfacing and paving shoulders from County Road 214/Christian Camp Road to Blanding Boulevard (State Road 21) (5 miles). APAC-Southeast of Jacksonville began July 6, 2011 and should finish in 190 days (early 2012) at a cost of $2,155,533.50. Joaquin Olivella/project manager. (4273661) Construction is Imminent Blanding Boulevard (State Road 21) and College Drive Install Intelligent Transportation System communications from County Road 220 to Sleepy Hollow. Traffic Control Devices Inc., of Altamonte Springs should begin in early 2012 at a cost of $362,550. Pete Vega/project manager. (4300641) Projects in Five-Year Work Program Blanding Boulevard (State Road 21) Resurface from Kingsley Avenue (State Road 224) to Knight Boxx Road (4.6 miles) in 2013/14 at estimated cost of $9 million. (4286981) Branan Field Road (State Road 23) Build frontage roads from Old Jennings Road to Oakleaf Plantation Parkway (4 miles). Bids to open in June 2012 at total estimated cost of $22 million. This is a design/build project. Jeff Daugharty/project designer. (4293041) County Road 218 Add lanes from Cosmos Avenue to Pine Lane (2.4 miles) in 2014/15 at estimated cost of $5.6 million. (4260321) Green Cove Springs Nature Preserve Construct bike path/trail to the Bayard Conservation area in 2012/13 at estimated cost of $870,000. (4274261) State Road 16 Replace or widen bridge culvert at Peters Creek . Bids to open in October 2103 at estimated cost of $2.5 million. Eric Shimer/project designer. (4244511) State Road 16 Rebuild railroad crossing at Ferris Avenue in Green Cove Springs in 2012/13 at estimated cost of $355,000. (4272181) US 17 Build bike path/trail from Green Cove Springs city limits to Black Creek Bridge (3.8

miles). Bids to open in February 2013 at estimated cost of $1.3 million. Fae Ross/project designer. (4243081) US 17 Add turn lane from Wells Road to the Duval County line (.5 mile) to improve access to Interstate 295. Bids to open in May 2013 at estimated cost of $3.5 million. Eric Shimer/project designer. (2082077) US 17 Resurface from Water Oak Lane to County Road 220 (1.7 miles). Bids to open in August 2012 at estimated cost of $2.7 million. Travis Humphries/project designer. (4233991) US 17 Upgrade traffic signal system from County Road 220 to Creighton Road (3 miles. Bids to open in October 2013 at estimated cost of $517,000. Pete Vega/project manager. (4300701) US 17 Landscape and build perimeter wall from Holly Point Road east to Elbow Road. Bids to open in March 2012 at estimated cost of $2.1 million. John Thrasher/project designer. (2082074) US 301 Resurface from the Bradford County line to north of County Road 218 in 2015/16 at estimated cost of $28 million. (430352) Recently Completed Projects (within past year) Blanding Boulevard (State Road 21) Traffic signal improvements from the Old Jennings Road to the Duval County line. Miller Electric Company of Jacksonville began in May 2010 and finished Feb. 12, 2011 (combined with Duval County project). (425985, 425988) Blanding Boulevard (State Road 21) Added left turn lane at Hall-Boree/Santa Clara roads. R.B. Baker Construction Inc., began May 9, 2011 and finished August 9, 2011 at a cost of $581,734.04. (2081302) Blanding Boulevard (State Road 21) Added lanes from Old Jennings Road to Knight Boxx Road (1.2 miles). Russell Engineering, Inc., of Fort Lauderdale began Sept. 18, 2009 and finished October 18, 2011 at a cost of $5,508,046.50. (2082112) County Road 215 Resurfaced from North Chicory Avenue/North Juniper Lane to Blanding Boulevard (State Road 21) and added left turn lanes at North Chicory/North Juniper avenues, North and South Deer avenues; and at Santa Clara Avenue/North Camel Avenue. Hubbard Construction Company of Winter Park began September 9, 2010 and finished April 26, 2011 at a cost of $1,411,978. (4136122) Kingsley Avenue (State Road 224) Resurfaced and restriped to provide three eastbound lanes from Plainfield Avenue to Smith Street in Orange Park. Hubbard Construction Company finished April 7, 2011 at a cost of $118,800. This is a federal economic stimulus project and design/build contract. (4283141)

Branan Field Chaffee Expressway (State Road 23) Built overpass at Plantation Oaks Boulevard. Superior Construction Company of Jacksonville began August 27, 2009 and finished November 17, 2010 at a cost of $7,250,000. This is a design/build project and is funded using federal economic stimulus funding. (2081662) Doctors Inlet Road (County Road 220) Resurfaced and added paved shoulders from Russell Road (County Road 209) to Blanding Boulevard (State Road 21) (3 miles). APAC-Southeast, Inc., of Jacksonville began July 28, 2010 and finished March 17, 2011 at a cost of $1,458,960.32. (4283111) Doctors Lake Drive (County Road 224A) Added sidewalk from Birdwood Drive to Kingsley Avenue (State Road 224). Hubbard Construction Company of Winter Park began April 11, 2011 and finished September 9, 2011 at a cost of $203,943.00. This is a federal economic stimulus project and design/build contract. Design began Jan. 13, 2011. (4283071) Moody Avenue Resurfaced from just north of Peoria Road (County Road 224A) to Doctors Lake Road (2 miles). Duval Asphalt Products began July 28, 2010 with the design and construction finished Jan. 12, 2011 at a cost of $858,000. (4283081) State Road 16 Resurfaced from U.S. 17 to the Shands Bridge (3 miles). APAC-Southeast Inc., of Jacksonville began July 19, 2010 and finished November 17, 2010 at a cost of $1,590,496.77. (2081833) State Road 100 Resurfaced from the Bradford County line to the Putnam County line (5.3 miles). APAC-Southeast, Inc. of Jacksonville began January 4, 2011 and finished June 29, 2011 at a cost of $2,771,667.17 (2081872) Projects Under Consideration Blanding Boulevard (State Road 21) Design to add lanes between County Roads 218 and 220 (6.4 miles) is underway. Public hearing held Sept. 24, 2002. John Thrasher/project designer. (2082115) Blanding Boulevard (State Road 21) Purchase right of way to add lanes between County Road 220 and Old Jennings Road (4 miles) in 2012/13. Construction is unfunded. (208211-3) College Avenue Extension (formerly known as the Cleveland Connector) Design to construct new roadway between Blanding Boulevard (State Road 21) and Branan Field Chaffee Road (State Road 23) to begin in 2014/15. (2082291) Kingsley Avenue (State Road 224) Design to update traffic signals at Smith Street is underway. (4298281) River Crossing Project development and environmental study to connect Branan Field Chaffee Road (State Road 23) to the proposed I-95/State Road 9B interchange crossing the St.

Johns River at the Shands Bridge (17 miles) is underway. See web page for more details: www.sjrbridge.com. Public meetings held March 30 and April 1, 2004 and November 1 and 3, 2005. Public hearings held February 22, 2010 in St. Augustine, February 25, 2010 in Orange Park, March 2, 2010 in Green Cove Springs and March 4, 2010 in Jacksonville. Brandi Vittur/project manager. (2082253)

You might also like