You are on page 1of 1

Generated by Foxit PDF Creator Foxit Software http://www.foxitsoftware.com For evaluation only.

Operational Energy Group India (P) Ltd.


O-M of Arasmeta Captive Power Company Pvt. Ltd.
Page 1 of 1

Site : ARASMETA Report Date: 03/12/2011

Daily Report
Rev ## #Error 0

Report Period: From: 03/12/2011 0:00 to 04/12/2011 0:00

Generation Details:

Actual
MW

Planned
MW On Date MTD YTD 2451000 323379000 43.00 1032000 1317000 125772000 20.75 498000 889000 158911000 813800 93735950 9.13 219000 75200 65175050 8.40 201480 645000 0 242000 3000 81579730 199000 38561000 334000 MTD 3096000 1334500 823000 597940 YTD 412180000 133283700 94666500 98925350

On Date Power (KWHr) 1. GROSS 34.38 825000 2. ACP-LIPL EXPORT 21.04 505000 3. TOT.GRID EXPORT 10.00 240000 SCP-LIPL EXPORT 9.13 219000 0.88 21000 CSEB EXPORT
4. DEEMED GEN. 5. CSEB IMPORT 6. AUX. + TR. LOSS 7. ACP LINE LOSS 8.63

0.00
3.29

207000 0 79000 1000

0.04

Equipment Run Hours:


BOILER #1 BOILER #2 STG

18:05:00 24:00:00 24:00:00

Ash Details: Ash Generated Ash Sent Out


DG Generation in KWHr:

MT MT
ACP SCP

226 286 0 0

639.00 858.00 0 300

98242.00 94405.00 5288900 3236689

Stock Details: Consumables Coal (MT) LDO (KL) Bed Material (MT) Raw Water (KL) Outages: Equipment
STG Boiler #2 Boiler #1 CHP

Stock
22457.89 6.272 3.93

Rcpts Consmp
0 0 0 2915 0 682

Balance
21775.89

MTD Remarks
1966 0
13 nos. of Ash bulkers unloaded

3.93

0 Bunker lvl @ 0000 8146


hrs Blr-1 : 400: Blr 2-400

AFB GCV: 3748.13 ADB GCV : 3971.63

AFB Ash %: 39.08

ADB Ash %: 41.41

Nature Duration Equipment Status / Remarks


TG-1 Normal running with 39.5 MW,TG -2 Stopped condition Normal Running with all compartments Normal Running with all compartments Normal Running
Road Coal Receipt Details: Qty in MT

Other Information:

1. Belt weigher #1 totaliser closing reading as of 12/3/2011 @2400 hrs is 68243 (793 MT) 2. Belt weigher #2 totaliser closing reading as of 12/3/2011 @2400 hrs is 98065 (780 MT) 3. On 4 @0600 hrs Ash Silo #1 (11 M) & Silo #2 (15 M) level empty 4.Total power consumption by LIPL-ACP "505 MW 7 MW Excess load drawn as per schedule (Rev-1) 5.Total power export for LIPL-SCP " 219 Mw"from CPP. LIPL-SCP drawal Wagon Coal Rcpt Details: Qty in MT plan is "219 Mw as per schedule (Rev-2) " & Actual power consumption is 292 Mw. 6.Phase#1 Gen., Coal Con. & Aux.con.# 825 Mwhr 682 MT & 75.42 Mw. 7.Phase#2 Gen., Coal Con. & Aux.con.# 0 Mwhr , 0 MT & 3.58 MW. 8.ADB & AFB of the Coal consumed on 02/12/11 is 4141.2 & 3869.06 Kcal/Kg respectively ( i.e.after 24hrs drying). 9. Boiler#1 Hot box-up at 10:10 hrs due to ( Low load demand ) 132KV Grid line maintenance work. After completion of maintenance work Boiler-1 restarted at 15:05hrs & Parellel with Boiler # 2 @ 16:05 Hrs. 10.Grid breaker open manually at 10:25hrs for 132KV Sonadih line BAY#1 through Akaltara sub-station maintenance work and again TG sync with Grid at 14:43 hrs.

Plant Manager OEGI