Site ID/Location Site Address: Scene: (Urban/ rural/mountain) BTS Type: (Indoor/Outdoor) Site type:(Sharing or independent if sharing, with which operator) RT(Building storeys ) Site Area (L*W*H):
Site Access
Item (Y/N) Remarks
Owner issue Access Issue at Night Society Issues Keys Required Guard Available (if yes mention Contact No.) Existing Site is below road level(M) Existing Site within 25 feet radius of road Level(Distance) Level of Pad from Gravel top(mm) Access Issue For Equipment Delivery (Any obstacle) (i) Narrow Street (ii) (iii) (iv) (v) (vi) (vii) Crane usage (RT) Stairs usage (RT) Narrow Stairs Case or Wide(RT) Equipment Can Easily pass through(RT) High Power Transmission Lines (RT) Any additional Tools Required for access and equipment entrance (e.g. -2TP Confidential BTS Site Battery Swap Survey Report
ladder/emergency lights)
Equipment Detail
Items
DG Capacity (Rating) DG Brand DG Condition (working/faulty) Transformer Capacity (Complete Detail) Number of Power Cabinets on Site (Rectifier) Brand & Rating Power System (Rectifier) Model of Power system (Rectifier) Numbers of Rectifier modules Over All Site Load (Distribution Current) Number of Working Rectifier Modules Number of Faulty Rectifier Modules Space Available for Extra Rectifier Modules Existing Battery Capacity (Ah) Number of Battery Banks Battery Banks Model Number of cells in each battery bank -3TP Confidential BTS Site Battery Swap Survey Report
Detail
Remarks
Y (Phase-Neutral) B (Phase-Neutral)
Detail
Remarks(Details)
Vertical
Horizontal
Earthing Cable from Pit to Busbar (If Required) Earthing Cable from Busbar to new Equipment bar (If Required) Requirement of New Bus Bar
Earthing Value()
Option-1
Mention the position of new Battery Cabinet in Layout(mark the dimensions of available space) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes If spare holes available, then mention Earthing cable length from existing bus bar to new cabinet If spare holes not available, then mention earthing cable from new bus bar to pit and form new bus bar to new cabinet. And form new bus bar to new cabinet. Vertical (M)
YES
NO
(M)
(M) (M) Horizontal (M) (M) (Nos) (Nos) (M) (M) (M)
Special Remark
Option-2
Mention the position of new Battery Cabinet in Layout Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length Vertical (M)
YES
NO
(M)
Special Remark
Option-3
Mention the position of new Battery Cabinet in Layout How much area need to be extend( On Existing Pad) Extended PAD size Sun shed is needed to extend or not Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length from existing bar to new bar Earthing cable from new bar to sun shed Earthing cable from new bar to New Equipment Mark the North Direction Vertical (M) M x
YES
NO
(M^2) M
YES
NO
(M)
Special Remark
Option-4
Space available for new PAD (1.5mx2m) Mention the position of new Battery Cabinet in Layout New sun shed is required for new PAD Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length from existing bar to new bar Earthing cable from new bar to sun shed Earthing cable from new bar to New Equipment North direction Vertical (M)
YES YES
YES
NO NO
NO
(M) (M) (M) Horizontal (M) (M) (Nos) (Nos)
Special Remark
Option-5
Not Available
Check the possibilities of space for acquiring Mention the position of new Battery Cabinet in Layout New sun shed is required for new PAD Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet Vertical New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length from existing bar to new bar Earthing cable from new bar to sun shed Earthing cable from new bar to New Equipment (M)
Available
YES YES
NO NO
(M) (M) (M) Horizontal (M) (M) (Nos) (Nos)
Special Remark
Option-6
Mention the position of new Battery Cabinet in Layout(mark the dimensions of available space) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet Vertical New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes If spare holes available, then mention Earthing cable length from existing bus bar to new cabinet If spare holes not available, then mention earthing cable from new bus bar to pit and form new bus bar to new cabinet. And form new bus bar to new cabinet. (M)
YES
NO
(M)
(M) (M) Horizontal (M) (M) (Nos) (Nos) (M) (M) (M)
Special Remark
Option-7
Mention the position of new Battery Cabinet in Layout(mark the dimensions of available space) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes If spare holes available, then mention Earthing cable length from existing bus bar to new cabinet If spare holes not available, then mention earthing cable from new bus bar to pit and form new bus bar to new cabinet. And form new bus bar to new cabinet. Vertical (M)
YES
NO
(M)
(M) (M) Horizontal (M) (M) (Nos) (Nos) (M) (M) (M)
Special Remark
Site Snaps(obligatory)
1. Complete site view from main entrance (2 to 3 snaps) from different
angles.
2. Complete site view from tower 6 m height. 3. Site level from road level
4. Narrow Street (For Crain usage) 5. Stairs usage (RT)
10. Existing BTS & PAD snaps from appropriate distance (cover whole
scenario of pad). 11.Transformer Snap 12.ACDB/ATS. 13.Rectifier with open door from front.
15. Equipment & DG pad earthing bus bar snaps. 16. . Earthing Value Snaps. 17. . Earhting pit snap. 18. Wapda Voltage (P/P-01) & (P/N-03)