BATTERY SWAP Survey Report TP-HUAWEI

Site ID: Location:

Site ID/Location Site Address: Scene: (Urban/ rural/mountain) BTS Type: (Indoor/Outdoor) Site type:(Sharing or independent if sharing, with which operator) RT(Building storeys ) Site Area (L*W*H):

Site Height (from GL):


Nearest Landmark: Date : Telenor Representative: Huawei Representative:

-1TP Confidential BTS Site Battery Swap Survey Report

Site Access
Item (Y/N) Remarks

Owner issue Access Issue at Night Society Issues Keys Required Guard Available (if yes mention Contact No.) Existing Site is below road level(M) Existing Site within 25 feet radius of road Level(Distance) Level of Pad from Gravel top(mm) Access Issue For Equipment Delivery (Any obstacle) (i) Narrow Street (ii) (iii) (iv) (v) (vi) (vii) Crane usage (RT) Stairs usage (RT) Narrow Stairs Case or Wide(RT) Equipment Can Easily pass through(RT) High Power Transmission Lines (RT) Any additional Tools Required for access and equipment entrance (e.g. -2TP Confidential BTS Site Battery Swap Survey Report

ladder/emergency lights)

Equipment Detail
Items
DG Capacity (Rating) DG Brand DG Condition (working/faulty) Transformer Capacity (Complete Detail) Number of Power Cabinets on Site (Rectifier) Brand & Rating Power System (Rectifier) Model of Power system (Rectifier) Numbers of Rectifier modules Over All Site Load (Distribution Current) Number of Working Rectifier Modules Number of Faulty Rectifier Modules Space Available for Extra Rectifier Modules Existing Battery Capacity (Ah) Number of Battery Banks Battery Banks Model Number of cells in each battery bank -3TP Confidential BTS Site Battery Swap Survey Report

Detail

Remarks

Availability of battery temperature sensor GEM Installed

Battery circuit breakers/ fuses information on Rectifier


Fuse1 Make of breaker/fuse Model Breaker/fuse Capacity in Amp(A) In use/Not in use Total Battery MCB Installed in Cabinet (Brand & Rating) MCB Installed in Rectifier or With Battery Shelve in Cabinet Fuse 2 Fuse 3 Fuse 4

AC breakers information in ACDB


No of spare single phase AC breaker in ACDB Make of single phase AC breaker in ACDB single phase AC breaker Capacity in Amp(A)

Wapda three phase Voltage


R-Y (Phase-Phase) Y-B (Phase-Phase) B-R (Phase-Phase) R (Phase-Neutral) -4TP Confidential BTS Site Battery Swap Survey Report

Y (Phase-Neutral) B (Phase-Neutral)

Required Material Detail


Items
Power Cable Length From Meter To MCCB(Wapda) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet Requirement of New Duct(DC & PGND) New Cable Duct for Dc Cables(RT & GF OPTION-1 & 6) New Cable Ladder for DC Cable for GF site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length (As Per Requirement) -5TP Confidential BTS Site Battery Swap Survey Report

Detail

Remarks(Details)

Vertical

Horizontal

Earthing Cable from Pit to Busbar (If Required) Earthing Cable from Busbar to new Equipment bar (If Required) Requirement of New Bus Bar

Earthing Value()

Important Observations Critical Issues Impact On Swap Proposed Solution

-6TP Confidential BTS Site Battery Swap Survey Report

-7TP Confidential BTS Site Battery Swap Survey Report

Civil Work Part


Space for new Battery Cabinet: Battery rack size (W*D*H) 905mm*1125mm*2155mm On existing On DG Need to New PAD Acquisition Under On equipment PAD extend required required for the Existing Pad existing (L*W) new PAD Tower Empty pad 2mx 1.5m Pad Option-1 Option-2 Option-3 Option-4 Option-5 Option-6 Option-7 In case of any options selected above, please fill accordingly below:

Option-1
Mention the position of new Battery Cabinet in Layout(mark the dimensions of available space) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes If spare holes available, then mention Earthing cable length from existing bus bar to new cabinet If spare holes not available, then mention earthing cable from new bus bar to pit and form new bus bar to new cabinet. And form new bus bar to new cabinet. Vertical (M)

YES

NO

(M)

(M) (M) Horizontal (M) (M) (Nos) (Nos) (M) (M) (M)

-8TP Confidential BTS Site Battery Swap Survey Report

Special Remark

Option-2
Mention the position of new Battery Cabinet in Layout Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length Vertical (M)

YES

NO

(M)

(M) (M) Horizontal (M) (M) (Nos) (Nos)

Special Remark

-9TP Confidential BTS Site Battery Swap Survey Report

Option-3
Mention the position of new Battery Cabinet in Layout How much area need to be extend( On Existing Pad) Extended PAD size Sun shed is needed to extend or not Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length from existing bar to new bar Earthing cable from new bar to sun shed Earthing cable from new bar to New Equipment Mark the North Direction Vertical (M) M x

YES

NO

(M^2) M

YES

NO

(M)

(M) (M) Horizontal (M) (M) (Nos) (Nos)

Special Remark

- 10 TP Confidential BTS Site Battery Swap Survey Report

Option-4
Space available for new PAD (1.5mx2m) Mention the position of new Battery Cabinet in Layout New sun shed is required for new PAD Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length from existing bar to new bar Earthing cable from new bar to sun shed Earthing cable from new bar to New Equipment North direction Vertical (M)

YES YES
YES

NO NO
NO
(M) (M) (M) Horizontal (M) (M) (Nos) (Nos)

Special Remark

- 11 TP Confidential BTS Site Battery Swap Survey Report

Option-5
Not Available
Check the possibilities of space for acquiring Mention the position of new Battery Cabinet in Layout New sun shed is required for new PAD Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet Vertical New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes Earthing cable length from existing bar to new bar Earthing cable from new bar to sun shed Earthing cable from new bar to New Equipment (M)

Available

YES YES

NO NO
(M) (M) (M) Horizontal (M) (M) (Nos) (Nos)

Special Remark

- 12 TP Confidential BTS Site Battery Swap Survey Report

Option-6
Mention the position of new Battery Cabinet in Layout(mark the dimensions of available space) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet Vertical New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes If spare holes available, then mention Earthing cable length from existing bus bar to new cabinet If spare holes not available, then mention earthing cable from new bus bar to pit and form new bus bar to new cabinet. And form new bus bar to new cabinet. (M)

YES

NO

(M)

(M) (M) Horizontal (M) (M) (Nos) (Nos) (M) (M) (M)

Special Remark

- 13 TP Confidential BTS Site Battery Swap Survey Report

Option-7
Mention the position of new Battery Cabinet in Layout(mark the dimensions of available space) Mark and measure the AC cable route length from existing ACDB to new Battery Cabinet 1 Dia PVC for AC cable (Make cable routing in layout) Mark and measure the DC cable route length from Rectifier to new Battery Cabinet New Cable Ladder for DC Cable for GF site (Make cable routing in layout) 4GI Duct for DC Cable for RT site (Make cable routing in layout) Check the existing Earthing bus bar on equipment Pad Quantity of spare holes Check the existing Earthing bus bar on DG Pad Quantity of spare holes If spare holes available, then mention Earthing cable length from existing bus bar to new cabinet If spare holes not available, then mention earthing cable from new bus bar to pit and form new bus bar to new cabinet. And form new bus bar to new cabinet. Vertical (M)

YES

NO

(M)

(M) (M) Horizontal (M) (M) (Nos) (Nos) (M) (M) (M)

Special Remark

- 14 TP Confidential BTS Site Battery Swap Survey Report

Site Snaps(obligatory)
1. Complete site view from main entrance (2 to 3 snaps) from different
angles.

2. Complete site view from tower 6 m height. 3. Site level from road level
4. Narrow Street (For Crain usage) 5. Stairs usage (RT)

6. Proposed Equipment space covering the surroundings (marked all four


directions). 7. Existing DG PAD. 8. Existing Battery Bank. 9. Battery Bank Brand/Rating

10. Existing BTS & PAD snaps from appropriate distance (cover whole
scenario of pad). 11.Transformer Snap 12.ACDB/ATS. 13.Rectifier with open door from front.

- 15 TP Confidential BTS Site Battery Swap Survey Report

14.1 Rectifier modules rating snaps.

15. Equipment & DG pad earthing bus bar snaps. 16. . Earthing Value Snaps. 17. . Earhting pit snap. 18. Wapda Voltage (P/P-01) & (P/N-03)

- 16 TP Confidential BTS Site Battery Swap Survey Report