DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION

CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)

(September 2011)

Circle

Sub-station

L/T

Cause

Fault Type

Tripping Date

Restoration Date

Duration Analysis (Hrs:Mins) Date of Comm: 21/08/1976. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 113.9Km from Pusad end due to snapping of Bphase conductor at loc.no.15. After attending the fault, line charged & stood ok. Load affected: Nil. Area affected:

AMRAVATI

220 kV Pusad.

220 kV PusadBhugaon line

Conductor snapped at loc. No. 15 from Breakdown on bhugaon end of B Line Ph.Weather - Heavy rainy.

Transco

Yes / Nagpur Circle.

nil / LBT = 147 MW

[W]=DISTN PROTN OPTD, A/R L/O ,A/R OPTD, [R]=DISTN RELAY - B Ph E/F , ZONE-I, DISTANCE-113.9 km, 3 Ph TRIPRELAY VAJ AT BHUGAON END [W]=DISTN PROTN OPTD, A/R L/O [R]=DISTN RELAY - B Ph E/F , ZONE-I, 186A&B

03.08.2011 15.55

04.08.2011 11.22

19.27

AMRAVATI

133 kV Paras

132/33 kV 25 MVA T/F-II

Simaltaniously 132 kV Paras- Patur line T/F related fault tripped.

MSETCL

NIL

33 kV Patur & Sasti fdr. For 52 mns. / 1.5 MW

[W]= NIL [R]= GENERAL TRIP, HARMONIC BLOCK , OSR TRIP , 86LV & 86A

02.09.2011 13.24

02.09.2011 16.54

3.30

Date of Comm: 26/03/2010. Date of Last maint: 27/01/2011. The T/F tripped on OSR protection due to ingress of water in OSR relay. Heavy rains and lightning reported from the site. T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 26/01/2005. The line tripped on distance protection, zone-I, Y-phase-E/F due to flashover of Y-phase insulator string. After attending the fault, line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 26/01/2005. The line tripped on distance protection, zone-I, B-phase-E/F due to decapping of B-phase string at loc.no.13. After attending the fault, line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 25/04/1996. The line tripped on distance protection, zone-II, R-phase-E/F due to decapping of R-phase insulator string at loc.no.134. After attending the fault, line charged & stood ok. Load affected: 38MW for 27mins. Area affected:

AMRAVATI

132 kV Paras

132 kV Paras Warwatbakal

Line Fault

Insulator string flashover due to decapping.

MSETCL

NIL

NIL

[W] = IMPD PROTN W/O CARRIER [R] = DISTN RELAY - PD, PAS,PE, PTaW, PSW , AT OTHER END- [W] =DISTN PROTN, [R] = DISTN RELAY - Y Ph E/F , ZONE-I, 86

03.09.2011 17.01

04.09.2011 11.23

18.22

AMRAVATI

132 kV Paras

132 kV Paras Warwatbakal line

Line fault B Ph Line fault B Ph string string decapped/failed at decapped/faile loc no. 13 on this d at loc no. 13 line. on this line.

MSETCL

NIL

NIL

[W] = IMPEDANCE PROTN W/O CARRIER , [R] = DISTN RELAY- PD, PAT,PE, PTaW, PSW , AT OTHER END [W] = DISTN PRTON OPTD
[R] = DISTN RELAY - B Ph E/F, ZONE- I , VAJ, ERPNOTIFICATION No. - 20001086

14.09.2011 05.31

14.09.2011 16.25

10.54

AMRAVATI

220 kV Pusad

220 kV Pusad Umerkhed line

Line Fault

Transient Fault

MSETCL

NIL

132 kV Umerkhed, Tamsa ,Himayatnaagr & kinwat S.S / 38 MW for 0.30 hrs.Then 132 kV Umerkhed Bus Charged through 220 kV Namded S/S via 132 kV Tamsa line & supply extended upto Himayatnagar & Kinwat S.S.

[W] = DISTN PROTN OPTD [R] = DISTN RELAY- R Ph E/F , ZONE- II, TRIPRELAY INRK223067KN , AT OTHER END [W] / [R] =
NOT TRIPPED.

17.09.2011 21.58

18.09.2011 08.06

10.08

AURANGABAD

132 kV Mahakala

132 kV Georai Mahakala Line

Transient Fault

Transco

33 kV Shahgad 2.1 MW

02.09.2011 15.10

02.09.2011 16.40

1.30

AURANGABAD

132 kV Mahakala

132/33 kV 25 MVA T/F- 1 EMCO Make

Heavy spark on HV Side LA due to Lighting T/F-1

Transco

------

-------

02.09.2011 16.53

03.09.2011 15.05

22.12

The line tripped on distance protection, zone-I, Y-phase-E/F at distance of 22.1Km from Georai end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. The load of about 2.1MW was affected for 1hr & 30mins. The T/F tripped on differential protection due to heavy sparking on HV side Y-phase LA. Heavy lightning was reported from the site. After replacing the faulty LA, T/F charged & stood ok. No load was affected. Date of Comm: 05/05/2011. Date of Last maint: New T/F. The T/F tripped on PRV protection due to burning of LV side R-phase PRV switch. After replacing the damaged switch, T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 10/02/2011. Date of Last maint: New T/F. The T/F tripped on O/C-E/F protection. Simultaneously 132KV HingoliKurunda line tripped on distance protection due to Monkey fault. T/F charged & stood ok.

AURANGABAD

220/132kV,200 220kV Parbhani MVA ICT - II BBL Make

PRV burnt.

Transco

Nil

PRV replaced.

04.09.2011 18.40

05.09.2011 12.17

17.37

AURANGABAD

220 kv Hingoli

220/132kV,100 MVA ICT - I IMP Make

Crossing of 132 kV & 220 kV line at loc.no 42 of Monkey Climed on tower & Came in Induction zone Due to heavy spark 220 kV PBN Hingoli ,220kV Hingoli-Pusad & 132 kV Kurunda along with 220/132 kV 100MVA ICT-I

Transco

Hingoli Dist.

14 MW

--------

15.09.2011 11.33

15.09.2011 15.55

4.22

Load affected: 14MW. Area affected:

DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)

(September 2011)

Circle

Sub-station

L/T

Cause

Fault Type

Tripping Date

Restoration Date

Duration Analysis (Hrs:Mins) Date of Comm: 23/06/2011. Date of Last maint: 23/06/2011. The line tripped on distance protection, zone-I due to monkey fault at loc.no.42. After attending the fault, line charged & stood ok.

10

AURANGABAD

220 kv Hingoli

132 Kv Kurunda

Crossing of 132 kV & 220 kV line at loc.no 42 of Monkey Climed on tower & Came in Induction zone Due to heavy spark 220 kV PBN Hingoli ,220kV Hingoli-Pusad & 132 kV Kurunda along with 220/132 kV 100MVA ICT-I

Transco

Kurunda s/s

23.3 MW

--------

15.09.2011 11.33

15.09.2011 15.56

4.23

Load affected: 23.3MW. Area affected:

12

AURANGABAD

220kV Chitegaon

132 Kv Chitegaon Paithan line

Transient Fault

Transco

Nil

--------

19.09.2011 00.05

19.09.2011 01.25

1.20

Date of Comm: 19/06/2004. The line tripped on distance protection, zone-II, R-phase-E/F at a distance of 31.22Km from Chitegaon end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 01/01/2011. Date of Last maint: 08/04/2011. The T/F tripped on differential protection. In the inspection, a squirrel found dead in LV side B-phase LA. After attending the fault, T/F charged & stood ok. Load affected: Nil. Area affected: The line tripped on distance protection, zone-I, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: 14MW for 1hr & 25mins. Area affected: Date of Comm: 23/06/2011. Date of Last maint: 23/06/2011. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 8.7Km from Hingoli due to monkey fault at loc.nos.9, 10, 15, 16. After attending the fault, line charged & stood ok. Load affected: 28.8MW. Area affected:

13

AURANGABAD

132/11kv,10MV 132 kV Paithan A kirloskar make T/F No.II

LV Side B- Ph L.A. burst.

Transco

NIL

--------

21.09.2011 13.02

21.09.2011 14.25

1.23

14

AURANGABAD

132 kv Gangapur

132 kv Canpack Gangapur line

Transient Fault

Transco

Gangapur Tq.

14 MW

-----------

23.09.2011 02.10

23.09.2011 03.35

1.25

15

AURANGABAD

220 kv Hingoli

132 Kv Kurunda

Monkey climbed on multi ckt. tower at loc. No.09,10,15,16

Transco

Kurunda, Basmat

28.8 MW

--------

23.09.2011 06.16

23.09.2011 08.00

1.44

17

AURANGABAD

132 kv Vaijapur

132/33 Kv ,50 MVA Conver Make T/F - 3

Cause not given.

Transco

6.28 MW

--------

27.09.2011 12.30

27.09.2011 17.30

5.00

The T/F tripped on OLTC Buchholz protection. Complete testing by testing staff was carried out, but nothing abnormal. T/F charged & stood ok. No load was affected. Date of Comm: 08/09/2011. Date of Last maint: New ICT. The ICT tripped on REF protection. Complete inspection by testing staff was carried out, REF relay circuit wiring found loose. After attending the fault, ICT charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 20/01/1965. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 1.83Km from GCR end. Patrolling was carried out, it is observed that between loc.nos.64 to 65 cut tree branches came in conductor vicinity. Line charged & stood ok. Load affected: Nil. Area affected:

43

NASHIK

400 KV BBLR

400/220KV 500MVA ICT-3

REF Tripping

Transient Fault

Transco

NIL

NIL

Delay due to rain.

14.09.2011 22.17

14.09.2011 23.47

1.30

44

NASHIK

220 KV GCR EKL.

132 Kv Jindal

Transient Tripping

Transient Fault

Transco

NIL

NIL

Ground petrolling done & observed that L.N0-65 &66 cutting of tree by farmer &it cames in vicinity of conductor.

14.09.2011 09.55

14.09.2011 11.37

1.42

45

NASHIK

220KV A*Nagar

220 KV BBLR-II

Transient Tripping

Transient Fault

Transco

NIL

NIL

Delay due to rain.

14.09.2011 22.17

14.09.2011 23.28

1.11

Date of Comm: 1993. The line tripped on distance protection, zone-I, R-N fault at a distance of 9.1Km from Babhleshwar end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected:

DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)

(September 2011)

Circle

Sub-station

L/T

Cause

Fault Type

Tripping Date

Restoration Date

Duration Analysis (Hrs:Mins) Date of Comm: 20/03/1990. The line tripped on distance protection, zone-I, R-N fault at a distance of 12.83Km from Satana end due to decapping of R-phase conductor at loc.no.33. After attending the fault, line charged & stood ok. Load affected: 34.22MW for 14mins. Area affected: Date of Comm: 12/03/2010. Date of Last maint: May-2011. The T/F tripped on Buchholz protection. Inspection by testing staff carried out, but nothing found abnormal. Simultaneously, 33KV Upnagar feeder tripped. T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 29/01/1989. The line tripped on distance protection, zone-II, B-phase-E/F at a distance of 29.7Km from Navsari end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 30/11/1990. Date of Last maint: 13/07/2011. The T/F tripped on PRV protection due to ingress of water in PRV cable box. After attending the problem, T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 26/11/1985. Date of Last maint: 31/08/2011. The T/F tripped on differential protection due to bursting of LV cable of T/F. After replacing the burst cable, T/F charged & stood ok.

46

NASHIK

220 KV Satana

132 KV Kalwan

B/D.

Cond. Flashover

Transco

NIL

Kalwan TQ./34.22 MW. For 0:14 Hrs.(from Dindori)

L.N.33- R Ph. Flashover Attd.

25.09.2011 16.16

25.09.2011 22.40

6.24

47

NASHIK

132 KV Takali

132/33 KV 50 Mva T/F-1

T/F Internal Fault

Transient Fault

Discom

NIL

NIL

33 KV Upnagar Fdr Tripped on O/C. & T/F Testing done.

28.09.2011 11.55

28.09.2011 14.46

2.51

49

NASHIK

220 KV OCR EKL.

220 KV Navasari1

Transient

Transient fault

Transco

NIL

NIL

Fault At Navasari End &Ground Petrolling Done By them,No Fault obsed.

30.09.2011 13.40

30.09.2011 18.25

4.45

50

NAGPUR

220 KV KALMESHWAR S/S

132/11 KV 16 MVA T/F NO 2

TRIPPING

LBT:3.0MW A.A: NIL LOAD SHIFTED ON T/F NO1 ,

T/F TRIPPED WITH HV/LV BREAKER. 25MVA.

01.09.2011 03.20

01.09.2011 10.40

7.20

51

NAGPUR

132KV HINGNA2 S/S

132/11 KV 25MVA T/F NO.1 (EMCO)

TRIPPING

REMARK : IR VALUE OF T/F AFTER LV CABLE DISCONNECTED ARE AS FOLLOW. LV TO E LBT - 10.04MW , AA - 7NOS. 11KV FEEDERS HV TO E - 20GOHMS , 30MOHMS , HV TO LV - 0. 1NO. LV FOR 7MINS. AS LOAD SHIFTED ON T/F NO.2 CABLE OBSERVED BURST. DATE OF AT 03:06HRS. COMM. - 26.11.1985 DATE OF LAST MAINT.- 31.08.2011

02.09.2011 02.59

02.09.2011 21.54

18.55

Load affected: 10.04MW for 7mins. Area affected:

52

NAGPUR

132KV TEKEPAR 132KV TEKEPAR S/S KARDHA CKT.

TRIPPING

LBT - 10MW , AA - 132KV TEKEPAR S/S

REMARK : CKT. TRIPPED AT BOTH END S/S. SIMULTANEOUSLY 132KV TEKEPAR BHANDARA CKT. TRIPPED AT BHANDARA END ONLY. NO TRIPPING AT TEKEPAR END. INDICATIONS AT BHANDARA END IS AS FOLLOW. W/I :- BACK-UP O/C & E/F PROTN. OPTD. , A/R LOCKOUT. R/I :-TRIP RELAY A/R 186, TRIP RELAY BACK-UP PROTN. 67X , DIR. IDMTL E/F RELAY 69N. 132KV TEKEPAR S/S IS UN-MANED S/S . HENCE DELAY IN CHARGING DUE TO REMARK: BREAKER DID NOT TRIPPED AT 132 KV TEKEPAR S/ST.HENCE DELAY IN CHARGING DUE TO LATE CLEARANCE OBTAINED FROM 132KV KARDHA S/S INCHARGE REGARDING RELAY & BREAKER POSITION AT TEKEPAR S/S. SIMULTANEOULY 132KV KARDHATEKEPAR CKT TRIPPED ON WI:-A/R LOCK OUT TRIP CKT 1/2 FAULTY. & RI:- DIST PROT RELAY R ph ZONE II, TRIP RELAY OPERATED 67 AST 132KV KARDHA S/S.

Date of Comm: 23/05/1997. The line tripped on distance protection, zone-II, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. 05.09.2011 04.04 05.09.2011 07.00 Load affected: 10MW. Area affected:

2.56

53

NAGPUR

220KV BHANDARA S/ST

132 KV BHANDARA TEKEPAR CKT-I

Date of Comm: 16/05/1997. The line tripped on B/U O/C-E/F protection. Patrolling was carried out, it is found that there was the fault on 132KV Kardha-Tekepar line but the breaker at Tekepar end did not trip. After attending the fault, line charged & stood ok. 06.09.2011 01.06 06.09.2011 03.46 2.40 Load affected: Nil. Area affected:

TRIPPING

LBT - 3 MW , AA - 132 KV TEKEPAR S/ST

54

NAGPUR

132KV TEKEPAR 132KV TEKEPAR S/S KARDHA CKT

TRIPPING

REMARK:- A/R RLY COIL BURNT WHICH WAS THEN BYPASSED & MASTER LBT:10MW A.A: NIL ,AS 132KV BHANDARATRIP RLY FOUND FAULYY HENCE SAME IS TEKEPAR CKT WAS IN SERVICE. REPLACED AT TEKEPAR END ,NO TRIPPING AT KARDHA END.

08.09.2011 13.35

08.09.2011 16.45

3.10

Date of Comm: 23/05/1997. The line tripped due to problem in Master trip relay at Tekepar end. After bypassing the relay, line charged & stood ok. Load affected: Nil. Area affected:

DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)

(September 2011)

Circle

Sub-station

L/T

Cause

Fault Type

Tripping Date

Restoration Date

Duration Analysis (Hrs:Mins) Date of Comm: 23/05/1997. The line tripped on distance protection, zone-II, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok.

55

NAGPUR

132KV KARDHA 132KV KARDHAS/S TEKEPAR CKT

TRIPPING

REMARK:- SIMULTANEOUSLY 132KV ASGAON -KARDHA CKT TRIPPED AT ASGAON END ONLY ON WI:-DIST PROT OPTD+ VT SUPPLY FAIL & RI:- MASTER LBT:3MW A.A: NIL AS OTHER CKT WAS IN TRIP RLY 86(ER),AUXI DIRTL O/C EF -67X SERVICE. FROM 4:55HR TO 5:00HR. 132KV TEKEPAR S/S IN UNMAN S/S HENCE DELAY IN CHARGING AS STAFF AT 132KV KARDHA S/S RESTORING NORMALCY.

09.09.2011 04.55

09.09.2011 07.20

2.25

Load affected: Nil. Area affected:

56

NAGPUR

132KV MADGI S/S

66KV MADGIA'MORGAON CKT

TRIPPING & B/DN

LBT -2 MW , AA - 66KV A'MORGAON S/S BACKFEEDING AT18:25HR BY 33KV DONGARGAON FDR

CKT CHARGED AT 15:18 HRS & STOOD OK BUT AGAIN TRIPPED AT 15:19HR AT MADGI END ON SAME WI &RI & DIST 12.76KM FROM MADGI END. HENCE DECLARED B/DN.LINE CHARGED AFTER PATROLLING BUT NOTHING FOUND ABNORMAL DURING PATROLLING.CKT CHARGED ON NO LOAD AT MADGI END

16.09.2011 15.12

16.09.2011 19.10

Date of Comm: 1978. The line tripped on distance protection, zone-I, R-Y-B-phase fault at a distance of 12.76Km from Madgi end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. 3.58 Load affected: 2MW for 3hrs & 58mins. Area affected:

58

KALWA

220KV Kalwa S/S.

220KV KalwaApta line ( both end )

--

Transcom

No

220KV Kalwa-Apta line tripped at both end

29.09.2011 12.38

29.09.2011 14.07

1.38

Date of Comm: 03/10/2010. The line tripped on distance protection, zone-I, R-phase-E/F at a distance of 16.9Km from Kalwa end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 1994. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 4Km from Boisar end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 15/09/2010. The line tripped on distance protection, zone-I, R-phase-E/F at a distance of 12.75Km from Nagothane end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected:

59

KALWA

220KV Boisar S/S.

220KV BoisarTarapur line ( both end )

Transient fault

--

Transcom

No

Nil

Patroiling done nothing found abnormal. ( IB = 12.87 KA)

30.09.2011 16.43

30.09.2011 18.06

1.23

71

PANVEL

400KV 400KV NagothaneNagothane S/S. Dabhol - II line ( both end )

Transient Fault

--

Transco

No

Nil

400KV Nagothane-Dabhol - II line tripped at both end.

15.09.2011 12.18

15.09.2011 13.49

1.31

72

PANVEL

220KV Taloja S/S.

220KV AptaTaloja Line ( Apta end )

--

Transcom

No

Nil

220KV Apta-Taloja Line tripped at only Apta end.

29.09.2011 12.38

29.09.2011 14.08

1.26

Date of Comm: 1968. The line tripped on distance protection, zone-I, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: October-1978. The line tripped on distance protection, zone-II, B-phase-E/F at a distance of about 28Km from Telgaon end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok.

73

PARLI

132KV Telgaon

132kv TelgaonParli

Transient fault

Transco

Partly Ambad Taluka

LBT:2.1MW

02.09.2011 15.15

02.09.2011 16.40

1.25 Load affected: Nil. Area affected:

74

PARLI

220kv Girwali

132kv Gangakhed Feeder

Transient fault

LBT:19MW

Flash Over on String LOC no.59

14.09.2011 16.17

14.09.2011 22.53

6.36

The line tripped on distance protection, zone-I, B-N fault at a distance of 36.90Km from Girwali end due to flashover on string at loc.no.59. After attending the fault, line charged & stood ok. No load was affected. The line tripped on distance protection, zone-I, Y-phase-E/F at a distance of 29.49Km from Elichpur end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected:

75

PARLI

132kv Elichpur

132kv Elichpur Hingoli line

Transient fault

Transco

NIL

Delay in Charging due to Breaker Problem ( Stand by Line)

19.09.2011 22.56

20.09.2011 01.15

2.19

DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)

(September 2011)

Circle

Sub-station

L/T

Cause

Fault Type

Tripping Date

Restoration Date

Duration Analysis (Hrs:Mins) The line tripped on distance protection, zone-I, R-N fault at a distance of 29.6Km from Nanded end due to R-phase disc flashover. After attending the fault, line charged & stood ok. 2.45 Load affected: 4MW for 2hrs & 45mins Area affected:

77

PARLI

132kv Nanded

132kv NandedKandhar line

Conductor Snap, Rphase Disc flash over removed

Transco

Partly Makhed, Kandhar Taluka LBT:4MW

29.09.2011 15.00

29.09.2011 17.45

78

PARLI

132/11kv, 132KV Ujani S/S 10MVA T/F .no3 make:-HHE

L.V Side B-phase L.A Burst

Transco

Rular Ujani

LBT:4.6MW

29.09.2011 13.50

29.09.2011 14.55

Date of Comm: March-2011. The T/F tripped on differential protection due to bursting of LV side (11KV) B-phase LA. After replacing the burst LA, T/F charged & stood ok. 1.05 Load affected: Nil. Area affected: