CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)
(September 2011)
Circle
Sub-station
L/T
Cause
Fault Type
Tripping Date
Restoration Date
Duration Analysis (Hrs:Mins) Date of Comm: 21/08/1976. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 113.9Km from Pusad end due to snapping of Bphase conductor at loc.no.15. After attending the fault, line charged & stood ok. Load affected: Nil. Area affected:
AMRAVATI
220 kV Pusad.
Conductor snapped at loc. No. 15 from Breakdown on bhugaon end of B Line Ph.Weather - Heavy rainy.
Transco
[W]=DISTN PROTN OPTD, A/R L/O ,A/R OPTD, [R]=DISTN RELAY - B Ph E/F , ZONE-I, DISTANCE-113.9 km, 3 Ph TRIPRELAY VAJ AT BHUGAON END [W]=DISTN PROTN OPTD, A/R L/O [R]=DISTN RELAY - B Ph E/F , ZONE-I, 186A&B
03.08.2011 15.55
04.08.2011 11.22
19.27
AMRAVATI
133 kV Paras
MSETCL
NIL
[W]= NIL [R]= GENERAL TRIP, HARMONIC BLOCK , OSR TRIP , 86LV & 86A
02.09.2011 13.24
02.09.2011 16.54
3.30
Date of Comm: 26/03/2010. Date of Last maint: 27/01/2011. The T/F tripped on OSR protection due to ingress of water in OSR relay. Heavy rains and lightning reported from the site. T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 26/01/2005. The line tripped on distance protection, zone-I, Y-phase-E/F due to flashover of Y-phase insulator string. After attending the fault, line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 26/01/2005. The line tripped on distance protection, zone-I, B-phase-E/F due to decapping of B-phase string at loc.no.13. After attending the fault, line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 25/04/1996. The line tripped on distance protection, zone-II, R-phase-E/F due to decapping of R-phase insulator string at loc.no.134. After attending the fault, line charged & stood ok. Load affected: 38MW for 27mins. Area affected:
AMRAVATI
132 kV Paras
Line Fault
MSETCL
NIL
NIL
[W] = IMPD PROTN W/O CARRIER [R] = DISTN RELAY - PD, PAS,PE, PTaW, PSW , AT OTHER END- [W] =DISTN PROTN, [R] = DISTN RELAY - Y Ph E/F , ZONE-I, 86
03.09.2011 17.01
04.09.2011 11.23
18.22
AMRAVATI
132 kV Paras
Line fault B Ph Line fault B Ph string string decapped/failed at decapped/faile loc no. 13 on this d at loc no. 13 line. on this line.
MSETCL
NIL
NIL
[W] = IMPEDANCE PROTN W/O CARRIER , [R] = DISTN RELAY- PD, PAT,PE, PTaW, PSW , AT OTHER END [W] = DISTN PRTON OPTD
[R] = DISTN RELAY - B Ph E/F, ZONE- I , VAJ, ERPNOTIFICATION No. - 20001086
14.09.2011 05.31
14.09.2011 16.25
10.54
AMRAVATI
220 kV Pusad
Line Fault
Transient Fault
MSETCL
NIL
132 kV Umerkhed, Tamsa ,Himayatnaagr & kinwat S.S / 38 MW for 0.30 hrs.Then 132 kV Umerkhed Bus Charged through 220 kV Namded S/S via 132 kV Tamsa line & supply extended upto Himayatnagar & Kinwat S.S.
[W] = DISTN PROTN OPTD [R] = DISTN RELAY- R Ph E/F , ZONE- II, TRIPRELAY INRK223067KN , AT OTHER END [W] / [R] =
NOT TRIPPED.
17.09.2011 21.58
18.09.2011 08.06
10.08
AURANGABAD
132 kV Mahakala
Transient Fault
Transco
33 kV Shahgad 2.1 MW
02.09.2011 15.10
02.09.2011 16.40
1.30
AURANGABAD
132 kV Mahakala
Transco
------
-------
02.09.2011 16.53
03.09.2011 15.05
22.12
The line tripped on distance protection, zone-I, Y-phase-E/F at distance of 22.1Km from Georai end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. The load of about 2.1MW was affected for 1hr & 30mins. The T/F tripped on differential protection due to heavy sparking on HV side Y-phase LA. Heavy lightning was reported from the site. After replacing the faulty LA, T/F charged & stood ok. No load was affected. Date of Comm: 05/05/2011. Date of Last maint: New T/F. The T/F tripped on PRV protection due to burning of LV side R-phase PRV switch. After replacing the damaged switch, T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 10/02/2011. Date of Last maint: New T/F. The T/F tripped on O/C-E/F protection. Simultaneously 132KV HingoliKurunda line tripped on distance protection due to Monkey fault. T/F charged & stood ok.
AURANGABAD
PRV burnt.
Transco
Nil
PRV replaced.
04.09.2011 18.40
05.09.2011 12.17
17.37
AURANGABAD
220 kv Hingoli
Crossing of 132 kV & 220 kV line at loc.no 42 of Monkey Climed on tower & Came in Induction zone Due to heavy spark 220 kV PBN Hingoli ,220kV Hingoli-Pusad & 132 kV Kurunda along with 220/132 kV 100MVA ICT-I
Transco
Hingoli Dist.
14 MW
--------
15.09.2011 11.33
15.09.2011 15.55
4.22
DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)
(September 2011)
Circle
Sub-station
L/T
Cause
Fault Type
Tripping Date
Restoration Date
Duration Analysis (Hrs:Mins) Date of Comm: 23/06/2011. Date of Last maint: 23/06/2011. The line tripped on distance protection, zone-I due to monkey fault at loc.no.42. After attending the fault, line charged & stood ok.
10
AURANGABAD
220 kv Hingoli
132 Kv Kurunda
Crossing of 132 kV & 220 kV line at loc.no 42 of Monkey Climed on tower & Came in Induction zone Due to heavy spark 220 kV PBN Hingoli ,220kV Hingoli-Pusad & 132 kV Kurunda along with 220/132 kV 100MVA ICT-I
Transco
Kurunda s/s
23.3 MW
--------
15.09.2011 11.33
15.09.2011 15.56
4.23
12
AURANGABAD
220kV Chitegaon
Transient Fault
Transco
Nil
--------
19.09.2011 00.05
19.09.2011 01.25
1.20
Date of Comm: 19/06/2004. The line tripped on distance protection, zone-II, R-phase-E/F at a distance of 31.22Km from Chitegaon end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 01/01/2011. Date of Last maint: 08/04/2011. The T/F tripped on differential protection. In the inspection, a squirrel found dead in LV side B-phase LA. After attending the fault, T/F charged & stood ok. Load affected: Nil. Area affected: The line tripped on distance protection, zone-I, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: 14MW for 1hr & 25mins. Area affected: Date of Comm: 23/06/2011. Date of Last maint: 23/06/2011. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 8.7Km from Hingoli due to monkey fault at loc.nos.9, 10, 15, 16. After attending the fault, line charged & stood ok. Load affected: 28.8MW. Area affected:
13
AURANGABAD
Transco
NIL
--------
21.09.2011 13.02
21.09.2011 14.25
1.23
14
AURANGABAD
132 kv Gangapur
Transient Fault
Transco
Gangapur Tq.
14 MW
-----------
23.09.2011 02.10
23.09.2011 03.35
1.25
15
AURANGABAD
220 kv Hingoli
132 Kv Kurunda
Transco
Kurunda, Basmat
28.8 MW
--------
23.09.2011 06.16
23.09.2011 08.00
1.44
17
AURANGABAD
132 kv Vaijapur
Transco
6.28 MW
--------
27.09.2011 12.30
27.09.2011 17.30
5.00
The T/F tripped on OLTC Buchholz protection. Complete testing by testing staff was carried out, but nothing abnormal. T/F charged & stood ok. No load was affected. Date of Comm: 08/09/2011. Date of Last maint: New ICT. The ICT tripped on REF protection. Complete inspection by testing staff was carried out, REF relay circuit wiring found loose. After attending the fault, ICT charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 20/01/1965. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 1.83Km from GCR end. Patrolling was carried out, it is observed that between loc.nos.64 to 65 cut tree branches came in conductor vicinity. Line charged & stood ok. Load affected: Nil. Area affected:
43
NASHIK
400 KV BBLR
REF Tripping
Transient Fault
Transco
NIL
NIL
14.09.2011 22.17
14.09.2011 23.47
1.30
44
NASHIK
132 Kv Jindal
Transient Tripping
Transient Fault
Transco
NIL
NIL
Ground petrolling done & observed that L.N0-65 &66 cutting of tree by farmer &it cames in vicinity of conductor.
14.09.2011 09.55
14.09.2011 11.37
1.42
45
NASHIK
220KV A*Nagar
220 KV BBLR-II
Transient Tripping
Transient Fault
Transco
NIL
NIL
14.09.2011 22.17
14.09.2011 23.28
1.11
Date of Comm: 1993. The line tripped on distance protection, zone-I, R-N fault at a distance of 9.1Km from Babhleshwar end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected:
DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)
(September 2011)
Circle
Sub-station
L/T
Cause
Fault Type
Tripping Date
Restoration Date
Duration Analysis (Hrs:Mins) Date of Comm: 20/03/1990. The line tripped on distance protection, zone-I, R-N fault at a distance of 12.83Km from Satana end due to decapping of R-phase conductor at loc.no.33. After attending the fault, line charged & stood ok. Load affected: 34.22MW for 14mins. Area affected: Date of Comm: 12/03/2010. Date of Last maint: May-2011. The T/F tripped on Buchholz protection. Inspection by testing staff carried out, but nothing found abnormal. Simultaneously, 33KV Upnagar feeder tripped. T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 29/01/1989. The line tripped on distance protection, zone-II, B-phase-E/F at a distance of 29.7Km from Navsari end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 30/11/1990. Date of Last maint: 13/07/2011. The T/F tripped on PRV protection due to ingress of water in PRV cable box. After attending the problem, T/F charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 26/11/1985. Date of Last maint: 31/08/2011. The T/F tripped on differential protection due to bursting of LV cable of T/F. After replacing the burst cable, T/F charged & stood ok.
46
NASHIK
220 KV Satana
132 KV Kalwan
B/D.
Cond. Flashover
Transco
NIL
25.09.2011 16.16
25.09.2011 22.40
6.24
47
NASHIK
132 KV Takali
Transient Fault
Discom
NIL
NIL
28.09.2011 11.55
28.09.2011 14.46
2.51
49
NASHIK
220 KV Navasari1
Transient
Transient fault
Transco
NIL
NIL
30.09.2011 13.40
30.09.2011 18.25
4.45
50
NAGPUR
TRIPPING
01.09.2011 03.20
01.09.2011 10.40
7.20
51
NAGPUR
TRIPPING
REMARK : IR VALUE OF T/F AFTER LV CABLE DISCONNECTED ARE AS FOLLOW. LV TO E LBT - 10.04MW , AA - 7NOS. 11KV FEEDERS HV TO E - 20GOHMS , 30MOHMS , HV TO LV - 0. 1NO. LV FOR 7MINS. AS LOAD SHIFTED ON T/F NO.2 CABLE OBSERVED BURST. DATE OF AT 03:06HRS. COMM. - 26.11.1985 DATE OF LAST MAINT.- 31.08.2011
02.09.2011 02.59
02.09.2011 21.54
18.55
52
NAGPUR
TRIPPING
REMARK : CKT. TRIPPED AT BOTH END S/S. SIMULTANEOUSLY 132KV TEKEPAR BHANDARA CKT. TRIPPED AT BHANDARA END ONLY. NO TRIPPING AT TEKEPAR END. INDICATIONS AT BHANDARA END IS AS FOLLOW. W/I :- BACK-UP O/C & E/F PROTN. OPTD. , A/R LOCKOUT. R/I :-TRIP RELAY A/R 186, TRIP RELAY BACK-UP PROTN. 67X , DIR. IDMTL E/F RELAY 69N. 132KV TEKEPAR S/S IS UN-MANED S/S . HENCE DELAY IN CHARGING DUE TO REMARK: BREAKER DID NOT TRIPPED AT 132 KV TEKEPAR S/ST.HENCE DELAY IN CHARGING DUE TO LATE CLEARANCE OBTAINED FROM 132KV KARDHA S/S INCHARGE REGARDING RELAY & BREAKER POSITION AT TEKEPAR S/S. SIMULTANEOULY 132KV KARDHATEKEPAR CKT TRIPPED ON WI:-A/R LOCK OUT TRIP CKT 1/2 FAULTY. & RI:- DIST PROT RELAY R ph ZONE II, TRIP RELAY OPERATED 67 AST 132KV KARDHA S/S.
Date of Comm: 23/05/1997. The line tripped on distance protection, zone-II, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. 05.09.2011 04.04 05.09.2011 07.00 Load affected: 10MW. Area affected:
2.56
53
NAGPUR
Date of Comm: 16/05/1997. The line tripped on B/U O/C-E/F protection. Patrolling was carried out, it is found that there was the fault on 132KV Kardha-Tekepar line but the breaker at Tekepar end did not trip. After attending the fault, line charged & stood ok. 06.09.2011 01.06 06.09.2011 03.46 2.40 Load affected: Nil. Area affected:
TRIPPING
54
NAGPUR
TRIPPING
REMARK:- A/R RLY COIL BURNT WHICH WAS THEN BYPASSED & MASTER LBT:10MW A.A: NIL ,AS 132KV BHANDARATRIP RLY FOUND FAULYY HENCE SAME IS TEKEPAR CKT WAS IN SERVICE. REPLACED AT TEKEPAR END ,NO TRIPPING AT KARDHA END.
08.09.2011 13.35
08.09.2011 16.45
3.10
Date of Comm: 23/05/1997. The line tripped due to problem in Master trip relay at Tekepar end. After bypassing the relay, line charged & stood ok. Load affected: Nil. Area affected:
DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)
(September 2011)
Circle
Sub-station
L/T
Cause
Fault Type
Tripping Date
Restoration Date
Duration Analysis (Hrs:Mins) Date of Comm: 23/05/1997. The line tripped on distance protection, zone-II, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok.
55
NAGPUR
TRIPPING
REMARK:- SIMULTANEOUSLY 132KV ASGAON -KARDHA CKT TRIPPED AT ASGAON END ONLY ON WI:-DIST PROT OPTD+ VT SUPPLY FAIL & RI:- MASTER LBT:3MW A.A: NIL AS OTHER CKT WAS IN TRIP RLY 86(ER),AUXI DIRTL O/C EF -67X SERVICE. FROM 4:55HR TO 5:00HR. 132KV TEKEPAR S/S IN UNMAN S/S HENCE DELAY IN CHARGING AS STAFF AT 132KV KARDHA S/S RESTORING NORMALCY.
09.09.2011 04.55
09.09.2011 07.20
2.25
56
NAGPUR
CKT CHARGED AT 15:18 HRS & STOOD OK BUT AGAIN TRIPPED AT 15:19HR AT MADGI END ON SAME WI &RI & DIST 12.76KM FROM MADGI END. HENCE DECLARED B/DN.LINE CHARGED AFTER PATROLLING BUT NOTHING FOUND ABNORMAL DURING PATROLLING.CKT CHARGED ON NO LOAD AT MADGI END
16.09.2011 15.12
16.09.2011 19.10
Date of Comm: 1978. The line tripped on distance protection, zone-I, R-Y-B-phase fault at a distance of 12.76Km from Madgi end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. 3.58 Load affected: 2MW for 3hrs & 58mins. Area affected:
58
KALWA
--
Transcom
No
29.09.2011 12.38
29.09.2011 14.07
1.38
Date of Comm: 03/10/2010. The line tripped on distance protection, zone-I, R-phase-E/F at a distance of 16.9Km from Kalwa end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 1994. The line tripped on distance protection, zone-I, B-phase-E/F at a distance of 4Km from Boisar end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: 15/09/2010. The line tripped on distance protection, zone-I, R-phase-E/F at a distance of 12.75Km from Nagothane end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected:
59
KALWA
Transient fault
--
Transcom
No
Nil
30.09.2011 16.43
30.09.2011 18.06
1.23
71
PANVEL
Transient Fault
--
Transco
No
Nil
15.09.2011 12.18
15.09.2011 13.49
1.31
72
PANVEL
--
Transcom
No
Nil
29.09.2011 12.38
29.09.2011 14.08
1.26
Date of Comm: 1968. The line tripped on distance protection, zone-I, R-phase-E/F. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected: Date of Comm: October-1978. The line tripped on distance protection, zone-II, B-phase-E/F at a distance of about 28Km from Telgaon end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok.
73
PARLI
132KV Telgaon
132kv TelgaonParli
Transient fault
Transco
LBT:2.1MW
02.09.2011 15.15
02.09.2011 16.40
74
PARLI
220kv Girwali
Transient fault
LBT:19MW
14.09.2011 16.17
14.09.2011 22.53
6.36
The line tripped on distance protection, zone-I, B-N fault at a distance of 36.90Km from Girwali end due to flashover on string at loc.no.59. After attending the fault, line charged & stood ok. No load was affected. The line tripped on distance protection, zone-I, Y-phase-E/F at a distance of 29.49Km from Elichpur end. Patrolling was carried out, but nothing found abnormal. Line charged & stood ok. Load affected: Nil. Area affected:
75
PARLI
132kv Elichpur
Transient fault
Transco
NIL
19.09.2011 22.56
20.09.2011 01.15
2.19
DAILY INTERRUPTION REPORT (SUPPLY AFFECTED FOR MORE THAN ONE HOUR ONLY) MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. Sl. No. Name of Eqp./Feeder Occura Occurren nce Due ce to other Due to Circle Area Affected(AA) Remarks Load Affected(LA)
(September 2011)
Circle
Sub-station
L/T
Cause
Fault Type
Tripping Date
Restoration Date
Duration Analysis (Hrs:Mins) The line tripped on distance protection, zone-I, R-N fault at a distance of 29.6Km from Nanded end due to R-phase disc flashover. After attending the fault, line charged & stood ok. 2.45 Load affected: 4MW for 2hrs & 45mins Area affected:
77
PARLI
132kv Nanded
Transco
29.09.2011 15.00
29.09.2011 17.45
78
PARLI
Transco
Rular Ujani
LBT:4.6MW
29.09.2011 13.50
29.09.2011 14.55
Date of Comm: March-2011. The T/F tripped on differential protection due to bursting of LV side (11KV) B-phase LA. After replacing the burst LA, T/F charged & stood ok. 1.05 Load affected: Nil. Area affected: