MikeMiller,PE
ManufacturingPlantLocations
BeloHorizonte, Brazil
ThePurposeofFullScaleTowerTesting
Thearethreetypesoffullscaletesting.
DesignTests Cost:$
ToVerify: Design Detailing ToVerify: Design,Detailing NewDesignConcepts LoadFlow Load Flow FailureInvestigations ToVerify: To Verify: Fabrication
Goal: Production
ResearchTests Cost:$$$
Whyistestingneeded?
LatticeTowersarecomplexsystems
Indeterminate3DStructures
TrussDeflectedShape Compression/Tension
In3D
Whyistestingneeded?
LatticeTowersarecomplexsystems
Modeledas2force(tension/compression)systems
Whyistestingneeded?
Whyistestingneeded?
LatticeTowersarecomplexsystems
Connectioneccentricity
Whyistestingneeded?
LatticeTowersarecomplexsystems
Connectioneccentricity
TopView
Whyistestingneeded?
Inaddition:
T Toverifythedesignmethodsothatitispossibletohave if h d i h d h i i ibl h
confidenceinthedesignofthebodyandlegextensions thatarenottested.
Whyistestingneeded?
Testingvideos
ClickherefortheTowerTestingVideo
FullscaleTestingisalongstandingpractice
1948
1948
1965
Verticalloadapplication
Deflectionmeasurements
1965
196080
TowerTesting: HowtoSpecify
TowerTesting:HowtoSpecify
Specification:ASCE10 Specification:IEC60652
TowerTesting:HowtoSpecify Familyof4to8towertypes:
TowerTypeSelection T T S l ti Typically:50100%offamilyistested. Selectionoftowertypeisbasedon: MostUsedTower(TangentSuspension) MostCriticalTower(DeadEnd) Same Tower Detailer (If two companies are used SameTowerDetailer(Iftwocompaniesareused, treatdetailingindependently) Note:Ifanytwotowersareverycloseinstrength, anditisexpectedthedetailingwillbeverysimilar, d d h d l ll b l thenadecisiontotestonlyoneofthetwotowersis reasonable.
WhyareTubularSteelPolesTypically NotTested?
StructurallyDeterminant (LoadPathswellbehavedandpredictable) Analysismatchespoleperformance (Testinginthe70s) Fabricationdependentonweldquality,e.g.AWS D1.1(processesandprocedureswelldefined) Largerdeflections applicationloadvectorsmay change.
PoleTesting 1979
TowerTesting:HowtoSpecify 8to12LoadCasesaretypical:
LoadCaseSelection L dC S l ti SelectLoadcasesthatcontrolthedesignof: S l tL d th t t l th d i f MainLegs BodyCrossBracing TowerArms Shieldwirepeaks Typically: C t lli Controllingweathercases th Construction/Stringing BrokenWire/Torsional
TowerTesting:HowtoSpecify
WindLoadApplication
AnapproximationonLoading A i ti L di
TowerTesting:HowtoSpecify TowerHeight
Selectioncanbebasedon: BodyExt./LegExt.withhighestreaction Body Ext./Leg Ext. with maximum member stress BodyExt./LegExt.withmaximummemberstress Tallesttowerconfiguration M Mostcommonlyusedtowerheight l d h i h
TowerTesting:HowtoSpecify
GeneralTestingCriteria G lT i C i i
Themanufacturingprocessesusedinthefabricationofthe prototypefortestingshallbetothesamespecificationsasthose t t f t ti h ll b t th ifi ti th usedduringthefabricationoftheproduction.
TowerTesting:HowtoSpecify
Material
Itisimportanttousethesamematerialforthetestthatwillbe p producedduringthesupply. Toughness Ifspecificationscallfornonstandardsteel,e.g.A572Gr.50with If specifications call for non standard steel e g A572 Gr 50 with ductility,A709,etc.,thenitmaynotbepossibletoobtainthismaterialin smallquantitiesforthetest. A572Gr.50withCharpy notchtoughnessisasupplementalrequirement andthisexactsteelwillmostlikelynotbeavailableforthetest. Yieldstrength Limitationsonthemaximumyieldstrength Limitations on the maximum yield strength maylimittestmaterialavailability.
TowerTesting:HowtoSpecify
IdenticalMaterialforTestingmaynotbeavailable.
ProcessforProduction towersupply: 1.TowerSuppliercontractaward 1 Tower Supplier contract award 2.Supplierpurchasesrawmaterial 2a.Mills:Productionquantities rollingschedules(materialisnotstockedinsufficient productionquantities) 2b.Distributionwarehouses(ifstandardmaterialandinstock) 3.Fabrication ProcessforTest towersupply: 1.TowerSupplier/TestingStationcontractaward 2.Supplierpurchasesrawmaterial 2 Supplier purchases raw material 2b.Distributionwarehouses(ifstandardmaterialandinstock) 3.Fabrication Note:Nonstandardmaterialistypicallynotavailablefortesting. Materialsubstitutionsmustbemadeutilizingthesameyieldstrength andshallberepresentativeofthematerialsusedintheproduction.
TowerTesting:HowtoSpecify
Finishing Fi i hi Blackvs.Galvanized
Structurallyperformthesame. Blacksteeltendstobemoreaudiblethangalvanizedunderloading. If t t d t Iftestedtoweristobedeliveredtotheclient,thentestinga i t b d li d t th li t th t ti galvanizedtowermakespackagingandshippingsimpler.
TowerTesting:Scheduling
Howmuchtime doesittake?
TowerDesign,DetailingandTestingProcess Definition
48weeks 2weeks 68weeks
6to12 months
Note:6to12monthsforcompletionofdesign/detail/testingincludingalldetaildrawings.
EquipmentusedinFullScaleTesting
L d C ll LoadCells Temperaturecompensating,calibratedbeforeeverytowertest MechanicalWinches(AutomaticorManual) WireRopes p Sheaves Theodolites Formeasuringdeflections Cranes
EquipmentusedinFullScaleTesting
LoadCells: Calibratedbeforeeverytowertest
EquipmentusedinFullScaleTesting
ControlRoomMonitoring
EquipmentusedinFullScaleTesting
TestBed
EquipmentusedinFullScaleTesting
VerticalCables(holddowns)for Horizontalloadapplication
ControlRoom
EquipmentusedinFullScaleTesting
WhatdoesTestingInclude?
D i DesignofPadfixture f P d fi t Verificationofassemblyanderection VerificationofRiggingthatsimulatesthedesignloading DesignFitnessofPurposeunderloading. g p g DetailingFitnessofPurposeunderloading. RecordingDeflectionsinLongitudinalandTransverse directions. Video and Photo documentation VideoandPhotodocumentation Witnessingbyclient(orclientsrepresentative) TestReport Attimes,testingalso At ti t ti l includes: Failurerootcause analysis y Structuralcorrection Retesting
AsInstalledinfield
Testingprocess Whattoexpectduringtesting
Loadingtowerto50%of1st loadcasetocheckrigging,etc. LoadCaseloadingwith1min.holdsat50%,75%,90%,95%and5min.holdat100%. Atholds,deflectionsarerecorded. At holds deflections are recorded Videodocumentation. LoadBalancingcanbe problematic bl ti
Testingprocess Whattoexpectduringtesting
ForRigidlatticetowers: Deflectionscanbe1.5to2timesthatpredictedbyanalysisduetoboltslippage. Thereisadistinctionbetweendesignload deflectionsandserviceloaddeflections.
Testingprocess Whattoexpectduringtesting
Ovalizationofholes: Generally,someovalization ofholesandpermanentdeformationofboltsare acceptable. acceptable Ifthetesttoweristobeusedforproduction,thesedeformationsmustbe replacedtoconformtheproductionspecification.Boltsusedintowertestsshould notbereused.
TestingCosts
Cost of prototype tower (economies of scale are not achieved) Costofproto typetower(economiesofscalearenotachieved) ~1.5 2.0xcostofproductionruntowers. Test Basic:~$150,000to$250,000 Failurecost:dependingonextentoffailureandavailabilityofmaterial, downtimeofstation. StrainGauges(ifused)~3,000pergauge. Additionalloadcasesbeyondthestandard812. Destruction Test: ~$20,000to$50,000 DestructionTest: $20,000 to $50,000
CostforFailureafterenergization $$$$$
DestructionTests
TheLoadCaseselectedshouldbeaweathercase The Load Case selected should be a weather case increasingthetransverseandverticalloadsinorder togaininformationonactualvs.predicted behavior.Thefailureloadcouldthenberelatedto aincreaseinspanutilization.
~115%
~114%
FailureCaseStudy1
500kVSingleCircuit TangentSuspension
Failureat95%
FailureCaseStudy2
500kVSingleCircuit DeadEnd
Loadingevaluation
Solution
WhatsnewintheIndustryregardingTowerTesting?
TowerTesting:Newinformation(Cigre Report399)
LoadCaseSelection L dC S l ti Deterministicvs.Probabilisticdesignloads e%exclusionlimits,wheree=5%,10% % l i li i h % 0% Howtocorrelateittothestrengthfactor? Returnperiod p DestructionTestsRecommended forcalibrationoftowerstrength curves. c r es
FrictionLossesduetopulleysystems p y y
Methodofdeterminationbytest
Acceptabletolerancesonappliedloads
Whiletestingyoucan Makenewfriends
TheEnd