You are on page 1of 3

LEED-NC 2.2 Submittal Template EQ Credit 3.

1: Construction IAQ Management Plan: During Construction (Responsible Individual) I, , from (Company Name)

verify that the information provided below is accurate, to the best of my knowledge.

CREDIT COMPLIANCE
A copy of the project's Construction Indoor Air Quality (IAQ) Management Plan has been uploaded. The plan has been developed following the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guideline for Occupied Buildings under Construction, 1995, Chapter 3. The project's air handling units were operated during construction. Yes No

Photos highlighting the IAQ Management Plan practices have been uploaded. The photos have been labeled to identify the highlighted approach.

Yes

No

If the air handling units were operated during construction, please provide a listing of the installed filters and their locations in the table below.

Filter Manufacturer

Filter Identification (Model #)

Filter MERV Rating

Location of Installed Filter

Filter was Replaced Immediately Prior To Occupancy Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No No

LEED-NC 2.2 Submittal Template | Last Modified: April 2006

LEED-NC 2.2 Submittal Template EQ Credit 3.1: Construction IAQ Management Plan: During Construction

Filter Manufacturer

Filter Identification (Model #)

Filter MERV Rating

Location of Installed Filter

Filter was Replaced Immediately Prior To Occupancy Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No No

NARRATIVE (Optional)
Please provide any additional comments or notes regarding special circumstances or considerations regarding the project's credit approach.

The project is seeking point(s) for this credit using an alternate compliance approach. The compliance approach, including references to any applicable Credit Interpretation Rulings is fully documented in the narrative above. (Indicate the number of points documented in the field below). Alternative Compliance Points Documented

LEED-NC 2.2 Submittal Template | Last Modified: April 2006

LEED-NC 2.2 Submittal Template EQ Credit 3.1: Construction IAQ Management Plan: During Construction Project Name: Credit:
Stavros Niarchos Found'n Cultural Centre EQ Credit 3.1: Construction IAQ Management Plan: During Construction

Points Documented:

READY TO SAVE THIS TEMPLATE TO LEED-ONLINE? Please enter your first name, last name and today's date below, followed by your LEED-Online Username and Password associated with the Project listed above to confirm submission of this template.
Chris Nunn chris.nunn@fgould.com

First Name

Last Name

Date

Username (Email Address)

Password
PRINT TEMPLATE 10000450 Letter Template Version A1 .

SAVE TEMPLATE TO LEED-ONLINE

LEED-NC 2.2 Submittal Template | Last Modified: April 2006

You might also like