Harold Majors 5944 Westchester Drive Newburgh, IN 47630 812-490-6892 Project Management Experience: Sterling Boiler & Mechanical

February 2010 to present Project: Bechtel Prairie State Power Plant WESP Position: Project Manager Scope of work: Supervise all phases of project. Responsibilities: Supervise crew of 80 plus personnel to cover ongoing project a reas, review Prints and formulate erection sequence with construction management Personnel, Interface with other contractors performing concurrent work, On site Administer QA/QC and Safety programs for all areas of responsibility. CDI Business Solutions November 2008 to February 2010 Project: Siemens - Tremble County AQCS Project Position: Technical Advisor Responsibilities: Advise work on Absorber, DESP, Structural Steel, WESP and Pipi ng. Project: Havana IL- AQCS Position: Technical Advisor Responsibilities: Advise work on AQSC Project: Prairie State Power Station Position: Technical Advisor Responsibilities: Advise work over AQCS Project: Reliant-URS Washington Division/ Siemens FGD Project Cheswick Station, Total Contract $ 16 Million Position: Site Manager Scope of work: Supervise all phases of project. Responsibilities: Supervise crew of 70 plus personnel (all crafts) to cover ongo ing project areas Review prints and formulate erection sequences with construction management per sonnel, track all additional work; coordinate time-sharing of heavy Equipment between all crafts on site: interface with other contractors Performing concurrent work on site: and administer QA/QC and safety Programs for all areas of responsibility. Project: PP&L/ Wheelabrator FGD project Absorber Montour Station Total Contract $23 Million Position: Site Manager Scope of work: Supervise all phases of project. Responsibilities: Supervise crew of 100 plus personnel (all crafts) to cover ong oing project areas Review prints and formulate erection sequences with construction management Per sonnel: track all additional work: coordinate time- sharing of heavy Equipment between all crafts on site: interface with other contractors,

Performing concurrent work on project site. Administer QA/QC and safety Programs for all areas of responsibility. Project: Hamon/PP&L SCR Project Brunner Island Total Contract $23 Million Position: Site Manager Scope of work: Supervise all phases of project. Responsibilities: Supervise crew of 180 plus personnel (all crafts) to cover ong oing project areas. Review prints and formulate erection sequences with construction management Personnel track all additional work; coordinate time-sharing of heavy Equipment between all crafts on site; interface with other contractors Performing concurrent work on site, Administer QA/QC and safety programs for areas of responsibility. Project: A.B Brown SCRS(2) Precip Rebuild and Fabric Filter Position: Project Superintendent Scope of work: Supervise all phases of project Responsibilities: Supervise crew of 100 plus personnel (all crafts) to cover ong oing project areas Review prints and formulate erection sequences with construction management Personnel track all additional work: coordinate time-sharing of heavy equipment Between all crafts on site; interface with other contractors preforming Concurrent work on site, administer QA/QC and safety programs for all areas Of responsibility. Project: Black & Veatch/ Vectren SCR Project Warrick AGC Total Contract $13 Million Position: Project Superintendent Scope of work: Supervise all phases of project Responsibilities: Supervise crew of 100 plus personnel (all crafts) to cover ong oing project areas Review prints ad formulate erection sequences with management personnel Track all additional work: coordinate time-sharing of heavy equipment Between all crafts on site: interface with other contractors performing Concurrent work on site; administer QA/QC and safety programs for all areas of Responsibility. Project: Black & Veatch/ Vectren SCR Project Culley Station Total Contract $13 Million Position: Project Superintendent Scope of work: Supervise all phases of project Responsibilities: Supervise crew of 100 plus personnel (all crafts) to cover ong oing project areas Review prints ad formulate erection sequences with management personnel Track all additional work: coordinate time-sharing of heavy equipment Between all crafts on site: interface with other contractors performing Concurrent work on site; administer QA/QC and safety programs for all areas of Responsibility. Project Alcan Ingot Sebree KY Total Contract $2.5 Million Position: Project Supervisor Scope of work: Supervise project

Responsibilities: Erection of 750 tons of building expansion steel and retrofit in existing facility. Interface with the client, supervision of erection crew, QA/QC, safety and Equipment. Project: Alcoa-Tennessee (South Plant) Alcoa TN Total contract $150,000. Position: Construction Advisor for Fluor Global Services Scope of work: Involved with steel erection and installation of equipment by Alc oa plant Maintenance personnel Installing Environmental control system. Project: Alcoa-Tennessee (South Plant) Alcoa TN Total contract amount $250,000. Position: Superintendent Scope of work: Crane rail tieback replacement in pot room. Responsibilities: Supervise Ironworker crews on tieback change out. Coordinate w ith owner Personnel on sequence. Administer QA/QC and Safety programs . Project: AK Steel Works Rockport, IN Total Contract $2.5 Million Position: Project Superintendent Scope of work: Erection of 1000 tons of fabricated structural steel for 200 foot after pot cooling Tower structure. Responsibilities: Supervise crew of 50 plus personnel (all crafts) to cover ongo ing project areas; Review prints and formulate erection sequences with construction management Personnel; track all additional work; coordinate time-sharing of heavy Equipment between all crafts on site; interface with other contractors Performing concurrent work on project site. Administer QA/QC and safety Programs for areas of responsibility. Project: Public Service Colorado Bag house and associated ductwork Install Pawnee, Colorado Total Contract $5.5 Million Position: Project Superintendent Scope of work: Onsite fabrication and erection of 200' x 200' bag house includin g all structural support and associated ductwork Responsibilities: Supervise crew of 50 plus personnel (all crafts) to cover ongo ing project areas; Review prints and formulate erection sequences with construction management per sonnel; Track all additional work; coordinate time-sharing of heavy Equipment between all crafts on site interface with other contractors Performing concurrent work on project site; Administer QA/QC and safety Programs for areas of responsibility. Project: Hoosier Energy(Merom) Absorber Module Demolition and Reconstruction Resulting from Fire Damage Total Contract $2.1 Million Position: Ironworker General Foreman Scope of work: Demolition of existing absorber module in its entirety, onsite mo dular Fabrication and installation of the replacement module.

Responsibilities: Supervise entire Ironworker crew to perform work associated wi th demolition And erection of absorber module; review prints and formulate structural Steel erection sequences with construction management personnel Document all cost plus work; coordinate time sharing of heavy equipment With all crafts on site; interface with other contractors performing concurrent Work on project site; administer QA/QC and safety programs for all areas Of responsibility. Project: Illinois Power (Baldwin) Precipitator Renovation Total Contract $4.5 Million Position: Ironworker General Foreman Scope of work: Demolition of existing ESP in its entirety with onsite modular fa brication and Installation of the replacement unit(Phase 1). Responsibilities: Supervise entire Ironworker crew to perform work associated wi th demolition And erection of Phase 1 precipitator; Review prints and formulate structural Steel and control room erection sequences with construction management Personnel; document all cost plus work; coordinate time- sharing of heavy Equipment with all crafts on site; Interface with other contractors performing Concurrent work on project site; administer QA/QC and safety programs for all Areas of responsibility. Project: OMU, Clean Air Project Total Contract$16.9 Million Position: Ironworker General Foreman Scope of work: Fabrication and erection of two alloy absorber vessels with assoc iated Support equipment including reagent prep, primary dewatering, secondary Dewatering, and all associated system piping. Demolition of two replacement Units. Installation of complete ash handling system for the replacement Units. Fabrication and erection of 600 tons of system ductwork and 250 tons Of ductwork support and access steel. Responsibilities: Supervise entire Ironworker crew to perform work associated wi th demolition And erection of Phase 1 precipitator; Review prints and formulate structural Steel and control room erection sequences with construction management Personnel; document all cost plus work; coordinate time- sharing of heavy Equipment with all crafts on site; Interface with other contractors performing Concurrent work on project site; administer QA/QC and safety programs for all Areas of responsibility. Tri state Steel Erection January 1978 to December 1986 Positions: Ironworker Journeyman and Foreman Ironworkers Local #103 Evansville, In January 1974 to April 2007 Position: Apprentice, Journeyman, and Foreman