Professional Documents
Culture Documents
STEP(1) MAINGEARINSTALLATION.
Usingclamps,testfitthegearinplace.Installonescrewtopivoton.Thiswillbeforgearleveling. DONOTinstalltheother5mountingscrewsyetasyouwillneedtopivotthejetsidetosidetolevelit onthegear.
EXAMPLE#2 Sandareasifneeded.
EXAMPLE#3 Trimorsandforproper
fit. EXAMPLE#4
Testfitgearandbondbulkheadintoplace.DONOTmounttheforwardgearsupportyetasyouwill needtobeabletopivotthegearforadjustment.
STEP(2) NOSEGEARINSTALLATION
Whenmountingandsettinguptheservolinkage,makesuretheservoarmdoesnotextendpastthe uppermostpointofthegearplate.Thisisforclearancereasons
10
Whenmountingthenosegear,makesurethereisjustenoughclearanceforthebellcranktoclearthe bulkhead.Usethe4largewoodscrewsprovidedtomountgear
Ifyouneedmoreclearanceforthenosegearstrut,youcangrindouttheareathatthestrutsitsinto.
11
STEP(3) LEVELINGMAINGEAR.
Placethejetonaflatsurfacewiththewingsonit.Take2matchingmeasuringtapesorrulersandset themontheflatsurfaceunderthewingtips. Tiltthejetuntilyouhavethesamemeasurements@bothwingtips.Whenthejetislevelyoucan takeapencilandmarktheholesoroutlinethegearmountsoyoudontloseyouposition.
12
Lineupyourmarksandinstalltherestofthemaingearscrewsintothebulkheads. (NOTE)Youwillneedtoremovethemaingearlaterforgeardoorinstallation.
13
STEP(4) Wingservo&controlhorninstallation(usingJR8611servo)
Centeryourservoarmontheservoandinstallthescrew,putapieceoftapeonthebackof theservoanddrawaline@centeroftheservoarm.Mounttheservointothewing.
14
Youwillneedtotakemeasurementstocutouttheslotinthewingfortheservoarmtogo through.
Aftertheslotiscutrotatetheservoarmcentertothelineonthetape.Thiswillhelpwith setupofthelinkage.
15
Usingarulerasaguide,marktheareayouwillbecuttingforthecontrolhorn.
The L/Eofthehornshouldbeaprox.inchfromthepaintline
16
Bondthecontrolhorninplace.Makesureitbondstotheothersideoftheinneraileron surfaceaswell
Usingtheprovided440rodandGoldNClevisesadjustthelinkagetothelengththatyou need.Usethecenterlocatinglineontheservotohelpwiththesetup
Repeatstepsfortheleftwing. 17
STEP(5) STAB&CONTROLHORNSETUP.
Makesurethestabbearingsareinstalled.Slidethenylonwasherontothestabrod.Slidestab intoplace,lineuptheT/EofthestabwiththeT/Eofthefuselage.Slideanothernylonwasher onbetweenthebearingandthenthealuminumcontrolhorn.Makesurethestabispushed allthewayinandthecontrolhornispressedfirmlyagainstthenylonwashersothatthereis noslopsidetosideonthestab.Thereisaflatspotonthestabrodthatwilllineupwithflat surfaceofthecontrolhorn.Useloctiteonthecontrolhornclampscrews,installsafety pin.
18
19
STEP(6) FINANDRUDDERINSTALLATION
20
Securerudderhorntotherudderbelcrankrod.Againmakesuretoputaflatspotontherod wherethehorntightensatandmakesuretherodisnot180out.
Installservotomountusingtheservomountingscrewsthatcomewithyourservo.Makesure servogearsaretothetail.
21
22
23
STEP(7) NOSECONEANDVENTRALFININSTALLATION
24
25
STEP(8) GEARDOORASSEMBLYANDINSTALLATION
Makesuretoscuffallhingesandbondingsurfacesonthegeardoors
YoucanuseCAtobondtheinnerskinstothedoors. Closepinsandorsmallclampsworkwellforthispresses.
26
Scuffbondingsidesofhingeswithwheelorsandpaper.
Scuffhingepointsonthedoors.
27
28
Tapethenosegeardoorinplacewithsafetyreleasetape
29
Makesuretoscuffthegluesurfacesonthehingesandthegluesurfacesonthegeardoors. Notehingeplacement.
30
Whensettinguptheaircylindersmakesureyouhavethemaximumextensionyoucanget andstillbeabletoclosethegeardoorsalltheway.
Hysoltheplywoodcylindermounttothefrontofthemaingeardoor.
31
32
STEP(9) AIRSYSTEM&SERVOWIREINSTALLATION.
NOTE.Everyonehastheirownwayofinstallingservowires,airlines,Turbineelectronicsand RXequipment.Thepicturesyouwillseearejustoneexampleofaninstallation. AIRTANKS.Use1largeand1smalltankforthegear.Usetheothersmalltankforthebrakes. Drillasmallholethroughtherearbulkheadfortheairlinestorunthrough.Mounttanks usingEpoxy.
Usetiewrapstoholdairlinesinplace.
33
Drillaholeintheforwardbulkheadfortheairlinestogothrough.Youcanrunyourservo extensionsthroughtheouterholesinthebulkheads.
Lookingintowardthenose.Makesureallyourwiresandairlinesaretiewrappedandsecure.
34 Lookingintowardthetail
35
STEP(10)
FUELSYSTEMINSTALLATION
36 MAKESUREYOURINSETANKSWITHHOTSOAPYWATER.REPEAT23TIMES.
37 BesuretomakethefuellinesthesamelengthuptotheTFittings.
Besuretosafetywireallconnections.
Setfueltanksintoplace.Youmayneedtoclearancethecressbeamforthefuellinestoclear.
38
39
Fityourintaketubeintoplaceandsetittotheheightthatyouneedforyourturbine.
40
Slidethetoptankintoplace.Youwillneedtomakeawoodstopatthefrontoftheplatethat thetanksitson.
Youwillneedtomakeawoodsupporttoholdthebackofthetankinplace.
41
STEP(11) TURBINE,TAILPIPEANDTAILCONEINSTALLATION.
Usethetailpipesupport(H10)tohelpsetheightofthetriangletabsyouwillgluein. Youcanalsousea2rolloftapetohelpholdthetabsforthegluingpresses
Makesureallthetabsarethesameheight.Use4smallscrewstoholdsupportinplace.
42
Setproperpipetotailconedistancebymovingyourturbineforwardorback. Seeyourturbinemanualfordistance.
Werecommendinstallingaheatshieldundertheturbinetohelpprotectthewiresand airlines.Usethinaluminumflashing,youcanbuythis@yourlocalhardwarestore. 43
Onceyourdistanceisset,screwtheturbineintoplaceandpluginallthelinesandwires.
Afterturbineismountedandallwiresandlinesaresecureyoucaninstallthecrossbrace.
44
Installthetailconeintoplaceusingsmallservotypescrews.
45
STEP(13) CGSETUPANDCONTROLTHROWS
CGislocated200mmfromtheL/Eofthewing.Makesureyourbatteriesareinstalledand yourUATisfull.
EXAMPLEPICTURESOFOURINSTALLATIONINTHESKYMASTERUSADEMOF16
47
Itsalwaysgoodtokeepyourwiresandlinestidyandclean.
48
49
Remember,Regularmaintenanceandcarewillkeepyourjet ingreatflyingconditionforyearsofenjoyment.
ThankyouforflyingSkymasterjets.Westrivetoprovidequalityjetkits,Accessoriesand service.Ifyouhaveanyquestionsregardingtheassemblyofyourkitpleasecontactus. Sincerely JeffTolomeo Director www.Skymasterusa PH8189944598 FX8189944599 Info@skymasterusa.com 50