You are on page 1of 16

Uncontrolled Copy

RBS 2202 TRU INSTALLATION GUIDE

RADIO ACCESS ENGINEERING

Confidential

Document Information
Version: Document Owner: Author : Release Date: Maturity: Status: Approved by: Reviewed by: Distribution List: Storage: Restriction: Type of document: Document No: Draft Version 1 <Document Owner name and position title> Alusio Vosailagi <Date of document's approval/authorisation> Initial Draft Release Michael Keaney Jochen Merz Radio Access Engineering Group Document1 Restricted to Distribution List Technical Installation Guide <dddtttxxxxx>

Disclaimer
This publication is confidential and has been prepared and written by Vodafone Pacific Limited or one of its related bodies corporate ("Vodafone Australia"). It is subject to copyright. No part of this document may be disclosed, copied, reproduced, stored in a retrieval system or transmitted without prior written permission from Vodafone Australia.

Vodafone

Uncontrolled Copy Status: Draft

Table of Contents

1 PURPOSE .............................................................................................................................. 3 2 SCOPE ................................................................................................................................... 3 3 ADDITION OF TRUS .......................................................................................................... 3 3.1 3.2 3.3 3.4 3.5 INSTALLATION OF TRUS ............................................................................................... 4 TRU CABLING FOR 2+2+2 - CDU_A .......................................................................... 6 TRU CABLING FOR 2+2+2 - CDU_C+ ........................................................................ 7 TRU CABLING FOR 4+4+4 - CDU_C+ ........................................................................ 8 READING AND MODIFYING THE CELL IDB ................................................................. 10

4 REMOVAL OF TRUS........................................................................................................ 13 5 DEFINITIONS / GLOSSARY ........................................................................................... 15 6 REFERENCES.................................................................................................................... 15 7 DOCUMENT CONTROL LOG........................................................................................ 15 8 DOCUMENT APPROVAL................................................................................................ 15

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 2 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Purpose

This document is to be used for the installation and de-installation of any CDU_A and CDU_C+ RBS 2202 TRUs. Other relevant Ericsson RBS 2202 Installation manuals maybe used together with this document should the need arise for other installation works not covered here.

Scope

This document is to be used within the RAE & NPG departments for the purpose of installing and de-installing RBS2202 TRUs.

Addition of TRUs

When installing additional TRUs to existing live sites in the network, ensure that a close liaison is kept with the relative NPG group to facilitate a smooth work progress. Ensure that all necessary tools and equipment are delivered to site safely. For the purpose of this document, it shall be assumed throughout this document that we are only dealing with RBS2202 CDU-A and RBS2202 CDU-C+ and only these two types will be covered here. The cell will not normally need to be halted to add or remove TRUs.

Fig 1 : RBS2202 Cabinet Overview

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 3 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

In this document we will only concern ourselves with some of the more common configurations for the CDU_A and the CDU_C+ and which I have listed below here. CDU_A , One cabinet with a maximum TRU config of 2+2+2 CDU_C+, One cabinet with a maximum TRU config of 2+2+2 CDU_C+, Two cabinets with a maximum TRU config of 4+4+4

Preconditions All required CDUs are pre-installed on site Existing PCM link to site is suffice to cater for the additional TRUs to be installed on site

3.1

Installation of TRUs

Call the FMT before entering the equipment room to notify them of your attendance and which will explain the site door alarm. Sign site log book, indicating reason for visit. Remove TRU blank plate from the position, the new TRU is to be installed and remove the spare TRU connection cables inside the TRU blank panel. There should be one TX connection cable and two RX connection cables present. Remove TRU unit from packing and give it a good visual check before inserting it into its allocated slot. Care needs to be exercised here to ensure that the back plane connections for the new TRU is made properly when inserting the new TRU unit into its place. Do not at any stage force the TRU in if it is not fitting/sliding in smoothly as it may result in the back plane connectors getting damaged. You may adjust the TRU back plane connectors if it is not fitting into place properly when inserting the TRU unit. Once the TRU is properly slotted in, secure it with the fastening screws provided. Follow the cabling provided in the following tables provided for their respective configurations. Switch on the power for this newly installed TRU by switching on its relevant fuse unit at the top of the cabinet where the IDM is located.

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 4 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Fig 2

Standard TRU, front panel and backplane

Fig 3

New TRU, front panel and backplane

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 5 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

3.2

TRU Cabling for 2+2+2 - CDU_A


CABLE No. ORIGIN TRU 0 Tx out TRU 1 Tx out TRU 2 Tx out TRU 3 Tx out TRU 4 Tx out TRU 5 Tx out CDU 0 Rx A out 1 CDU 0 Rx A out 2 CDU 0 Rx B out 1 CDU 0 Rx B out 2 CDU 1 Rx A out 1 CDU 1 Rx A out 2 CDU 1 Rx B out 1 CDU 1 Rx B out 2 CDU 2 Rx A out 1 CDU 2 Rx A out 2 CDU 2 Rx B out 1 CDU 2 Rx B out 2 DESTINATION CDU 0 Tx in 1 CDU 0 Tx in 2 CDU 1 Tx in 1 CDU 1 Tx in 2 CDU 2 Tx in 1 CDU 2 Tx in 2 TRU 0 Rx A in TRU 1 Rx A in TRU 0 Rx B in TRU 1 Rx B in TRU 2 Rx A in TRU 3 Rx A in TRU 2 Rx B in TRU 3 Rx B in TRU 4 Rx A in TRU 5 Rx A in TRU 4 Rx B in TRU 5 Rx B in

RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 699/00380 RPM 513 699/00380 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00380 RPM 513 699/00380 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00380 RPM 513 699/00380 RPM 513 699/00490 RPM 513 699/00490

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 6 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

3.3

TRU Cabling for 2+2+2 - CDU_C+


CABLE No. ORIGIN TRU 0 Tx out TRU 1 Tx out TRU 2 Tx out TRU 3 Tx out TRU 4 Tx out TRU 5 Tx out CDU 0 Rx out 3 CDU 0 Rx out 4 CDU 0 Rx out 1 CDU 0 Rx out 2 CDU 1 Rx out 3 CDU 1 Rx out 4 CDU 1 Rx out 1 CDU 1 Rx out 2 CDU 2 Rx out 3 CDU 2 Rx out 4 CDU 2 Rx out 1 CDU 2 Rx out 2 DESTINATION CDU 0 Tx in 1 CDU 0 Tx in 2 CDU 1 Tx in 1 CDU 1 Tx in 2 CDU 2 Tx in 1 CDU 2 Tx in 2 TRU 0 Rx A in TRU 1 Rx A in TRU 0 Rx B in TRU 1 Rx B in TRU 2 Rx A in TRU 3 Rx A in TRU 2 Rx B in TRU 3 Rx B in TRU 4 Rx A in TRU 5 Rx A in TRU 4 Rx B in TRU 5 Rx B in

RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490 RPM 513 699/00490

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 7 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

3.4

TRU Cabling for 4+4+4 - CDU_C+

MASTER CABINET TRU CABLING : 4+4+4 - CDU_C+ CABLE No. RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 ORIGIN TRU 0 Tx out TRU 1 Tx out TRU 2 Tx out TRU 3 Tx out TRU 4 Tx out TRU 5 Tx out CDU 0 Rx out 3 CDU 0 Rx out 4 CDU 1 Rx out 3 CDU 1 Rx out 4 CDU 2 Rx out 3 CDU 2 Rx out 4 CDU 0 Rx out 1 CDU 0 Rx out 2 CDU 1 Rx out 1 CDU 1 Rx out 2 CDU 2 Rx out 1 CDU 2 Rx out 2 DESTINATION CDU 0 Tx in 1 CDU 0 Tx in 2 CDU 1 Tx in 1 CDU 1 Tx in 2 CDU 2 Tx in 1 CDU 2 Tx in 2 TRU 0 Rx A in TRU 1 Rx A in TRU 2 Rx A in TRU 3 Rx A in TRU 4 Rx A in TRU 5 Rx A in TRU 0 Rx B in TRU 1 Rx B in TRU 2 Rx B in TRU 3 Rx B in TRU 4 Rx B in TRU 5 Rx B in

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 8 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

EXTENSION CABINET TRU CABLING : 4+4+4 - CDU_C+ CABLE No. RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 705/00440 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 RPM 513 699/00700 ORIGIN TRU 6 Tx out TRU 7 Tx out TRU 8 Tx out TRU 9 Tx out TRU 10 Tx out TRU 11Tx out CDU 3 Rx out 1 CDU 3 Rx out 2 CDU 4 Rx out 3 CDU 4 Rx out 4 CDU 5 Rx out 1 CDU 5 Rx out 2 CDU 3 Rx out 3 CDU 3 Rx out 4 CDU 4 Rx out 1 CDU 4 Rx out 2 CDU 5 Rx out 3 CDU 5 Rx out 4 DESTINATION CDU 3 Tx in 1 CDU 3 Tx in 2 CDU 4 Tx in 1 CDU 4 Tx in 2 CDU 5 Tx in 1 CDU 5 Tx in 2 TRU 6 Rx A in TRU 7 Rx A in TRU 8 Rx A in TRU 9 Rx A in TRU 10 Rx A in TRU 11 Rx A in TRU 6 Rx B in TRU 7 Rx B in TRU 8 Rx B in TRU 9 Rx B in TRU 10 Rx B in TRU 11 Rx B in

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 9 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

3.5

Reading and Modifying the Cell IDB

Fig 4

DXU - Laptop Connection

Switch ON your laptop and connect it to the DXU card as shown in fig 4 above. Once connected, RUN your OMT software. Your start -up screen will be like as shown below.

Fig 5

OMT Initial start up screen

Follow the following steps in their order as listed here; Click on Connection from the top menu bar and select the Connect option. You should now see pictorially on your screen that the OMT box is now connected to the RBS2000 box. (See fig below)

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 10 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Modify IDB button

Fig 6

OMT Connection screen

From the top menu bar, click on File then select Read IDB option. This will fetch you the current IDB file for this particular site. Save a copy of this current IDB file in your hard drive before you may do any modifications to it. Your IDB would should have been updated automatically by the system once you have installed and powered up the new TRU. Check that the new TRU is in the current IDB file in the RBS unit. If and only if you do not see the new TRU unit in the IDB file resident in the RBS unit then you may do the following; From the top menu bar, click on Connection then select Disconnect Once disconnected, again from the top menu bar, click on Connection then select Connect to reconnect to the RBS unit. From the top menu bar, click on File then select Read IDB option to get the current IDB resident in the RBS unit to see if this has now been updated automatically. If the IDB still has not been updated to reflect the changes and show the new TRU installed then, Click on the Modify IDB button as pointed out in fig. 6 above and the following window will appear :

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 11 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Fig 7

Modify IDB Window

To make an RU (Replaceable Unit) "Active" highlight the RU in the Inactive window and click on the left arrow button. Alternatively, double-click on the RU. Click on the OK button when the active and inactive RUs are correct. The Modify IDB window will now close. From the top menu bar, click on File then select the Install IDB option.

Once the IDB in the RBS unit reflects the changes done and showing that the new TRU is now in place then, Call the relevant MTX for this site and advise them that the new TRU is ready to be loaded and brought into service. Once the new TRU is in service, check with MTX staff to ensure the new TRU is taking traffic and all is well with the site before leaving site. Close and exit OMT software then disconnect laptop connection to the DXU card. Tidy up equipment hut and enter work carried out in site log book before leaving site.

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 12 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Removal of TRUs

Call relevant MTX to advise of work that needs to be carried out before leaving for the site. Ensure that you take appropriate empty packing for the TRU unit to be removed to avoid potential equipment damage due to transportation. Once at the site, call MTX to advise that you are ready to remove unit. Follow the steps below in their order given here once you have received MTX staff approval to start removing unit. Switch ON laptop, connect it to DXU unit and execute OMT software Click on Connection from the top menu bar and select the Connect option. You should now be connected to the Base Station equipment. From the top menu bar, click on File then select Read IDB option. This will fetch you the current IDB file for this particular site. Save a copy of this current IDB file in your hard drive before you may do any modifications to it. Switch off the power for the TRU unit to be removed and remove all cable connections to it. Unscrew the unit and pull it out from its slot. Click on the Modify IDB button and the following window will appear :

Fig 8

Modify IDB Window

To make an RU (Replaceable Unit) "Inactive" highlight the RU in the Active window and click on the right arrow button. Alternatively, double-click on the RU. Click on the OK button when the active and inactive RUs are correct. The Modify IDB window will now close. From the top menu bar, click on File then select the Install IDB option. This will now install back into the RBS unit the new (modified) IDB. This is necessary as the system will not update its IDB automatically as is the case when installing new TRUs. Close and exit OMT software then disconnect laptop connection to the DXU card. Call relevant MTX and advise your work is complete and ensure all is well on site before leaving site.

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 13 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Pack the de-installed unit properly together with all associated cables and take to agreed location. Tidy up site and enter work details in site log book.

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 14 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

Definitions / Glossary
Term CDU Definition Combining Distribution Unit - is the interface between transceivers (TRU) & the antenna system. It allows several TRUs to share antennas. Distribution Switch Unit - is the central control unit of the RBS. DXU handles the Managed Object Central Functions (CF). Energy Control Unit - controls and supervises the power equipment (PSU, BFU, battery, AC Connection Unit) and climate equipment (fans etc). Internal DataBase Internal Distribution Module Mobile Telephone Exchange Operation & Maintenance Terminal Power Supply Unit - is available in two versions: PSU 230 and PSU -48. Replaceable Unit. Transceiver Unit - is a transmitter/receiver and signal processing unit which transmits and receives the radio frequency signals that are passed to and fro from the mobile station.

DXU

ECU

IDB IDM MTX OMT PSU RU TRU

References
Location RAE Department Doc. No LZN 302 76 R7A

Associated document Ericsson's RBS2102, RBS2102, RBS2103, RBS2202 Reference Manual

7
Version

Document Control Log


Date 2nd November, 2001 Authors Alusio Vosailagi Summary of Changes N/A Draft

Document Approval
Signature Date

Name and Position

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 15 of 16 Release Date:

Vodafone

Uncontrolled Copy Status: Draft

<dddtttxxxxx> <Document Title> Version: <version> Confidential

Page 16 of 16 Release Date:

You might also like