Projects

ExistingRailway Project

Adani- NewRailwayProject

ProjectTarget
:increasecapacityupto22.7Mtpa
TE Tarahan
: 416.6Km
TEKertapati :167.6Km
ExpectedCompletion:2014
E
t dC
l ti

TANJUNG API API


Coal Bed Methane
50 MMSCF/day

Capacity
Distance

: 35 Mtpa
: 270 Km

KERTAPATI PORT
PALEMBANG

TANJUNG ENIM MINE

KERTAPATI

NewRailwayProject
Prabumulih

Pendopo
Muara Enim
Lahat

Banjarsari MineMouthPowerPlant
2x110MW

Capacity
:25.0Mtpa
Parties :PTBA;Rajawali AsiaResources,
ChinaRailwayEngineering
Distance :307Km
ExpectedCOD :2015

Baturaja

Tarahan Power Plant

Parties:PTBA;PJB;NII
CoalConsumption:1,4Mtpa
ExpectedCOD:2014

Capacity 2 x 8 MW

Mine Mouth Power Plant

STOCKPILE

Capacity 3 x 10 MW
TARAHAN PORT
PortExpansion
ProjectTarget: Increasecapacityfrom 12.5to25Mtpa
Completion
:2014

NEW PORT

17

Projects

EXISTING RAILWAY PROJECT

(TANJUNG ENIM - TARAHAN PORT & KERTAPATI PIER)

PTBA COAL HANDLING PORT PROJECT

Parties

ExistingSouthSumateraRailwayownedandoperatedby
PTKA,whichis astateownedrailwaycompany.

PTBA

Status

Toacceleratetransportationvolumegrowth,inOctober2009
PTBAandPTKAsignedanew CoalTransportationAgreement
(CTA)for20yearstermcontractinordertoachieve railway
capacityof 22.7
22 7 milliontons perannumin2014.
perannumin2014

Toincreaseexistingloadingcapacitytoaccommodate
uptocapesizevesselsize(150,000DWT),whichisstill
underconstruction;withTotalInvesment of 3,3Trillion
Rupiah
Rupiah.

Capacity

Tobecome22.7 milliontonsperannumin2014

To increasethroughputcapacityfrom12,5millionto25
milliontons perannum

Target

2011
:13.6milliontons
2012
:15.6 milliontons
2013
:18.5 milliontons
2014 2029 :
22.7milliontons

Receivingsystemtobecompleted inDecember2012
Shippingsystemtobecompleted inSeptember2013

CommercialOperation

2013

18

Projects
NEW RAILWAY PROJECT

ADANI NEW RAILWAY PROJECT

(TANJUNG ENIM - A NEW PORT IN LAMPUNG PROVINCE)

Location

Tanjung Enim Srengsem,Lampung

Tanjung Enim NewPort,Tanjung Apiapi

P i
Parties

PTBA10%
PTBA %
RajawaliAsiaResources
80%
ChinaRailwayEngineering10%

Ad
Adanii Global98%
Gl b l 8%
South SumateraLocalGovt. 2%

Status

EPCcontract(USD1.3billion)andO&Mcontract
(USD3.5billion)signedinMarch2010
Alignmentdesign approvalhasbeenobtainedfrom
regencies(July2011)

HOA(Head ofAgreement)underCTA(Coal
TransportationAgreement)hasbeensignedbetween
PTBA,Adani,&SouthSumateraProvincialGovt.
Adani astheofftaker of60%oftherailwaycapacity
Thefeasibilitystudyoftheportand railwayintechnical
and economicalaspectshasbeencompleted.

25.0milliontonsperannum (gradually increased)

35milliontonperannum (gradually increased)

Target
a get

1st y
year:7.5milliontons
75
2nd year:15.0milliontons
3rd year:20.0milliontons
4th year:25.0milliontons

1st y
year :7.5million
75
tons
2nd year :10.0million tons
3rd year:20.0 milliontons
4th year:25.0 milliontons
5th year :35.0million tons

CommercialOperation
p

20155

20155

Capacity