TREX-07183 EXHIBIT

GoM DW Management of Change (MOC) Report

Prod/Ops Management of Change (MoC) Report


Dev? MOC Number Title Priority Facility Nakika B (Med) B (Med) B (Med) Nakika Atlantis Nakika Thunder Horse B (Med) B (Med) A (High) B (Med) A (High) B (Med) A (High) A (High) C (Low) A (High) C (Low) B (Med) Atlantis Atlantis Thunder Horse Mad Dog Pompano Atlantis Thunder Horse Thunder Horse Pompano Thunder Horse Holstein Nakika Mad Dog Type Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Technical Duration Temporary Temporary Permanent Temporary Permanent Permanent Permanent Permanent Permanent Permanent Permanent Permanent Permanent Permanent Permanent Permanent Temporary Permanent Stage Temp Assurance Temp Assurance Close Out Temp Assurance Close Out Close Out Pre-Startup PSSR Post-Startup Actions Close Out Pre-Startup Post-Startup Actions Close Out Close Out Close Out Pre-Startup PSSR PSSR Status Implemented Closed Closed Closed Closed Closed Approved Approved Implemented Closed Approved Implemented Closed Closed Closed Approved Approved Approved Verifier/Coordinator Nakika Verifiers Nakika Verifiers Atlantis Verifiers Nakika Verifiers Thunder Horse Ops Verifiers DeJohn, Kenneth P Atlantis Verifiers Thunder Horse Ops Verifiers Mad Dog Ops Engineer Carroll, Alvaro DeJohn, Kenneth P Thunder Horse Ops Verifiers Thunder Horse Ops Verifiers Pompano Verifiers Thunder Horse Ops Verifiers Neill, David H Nakika Verifiers Mad Dog Ops Engineer Initiator Tonthat, Aichau McIntosh, Waldo Young, Brian Mathur, Kush Azhdarinia, Diana Hernandez, Oris Heraly, Kevin Quiring, Brian Morgan, Clayton W Carroll, Alvaro Snook, John George, Keith Aguilar, Luis Taylor, Donald George, Keith Neill, David H Graves, Mallory T Osterhaus, Jennifer Date Initiated 1/16/2009 1/20/2009 2/5/2009 2/12/2009 2/27/2009 3/3/2009 3/5/2009 3/29/2009 5/6/2009 5/11/2009 6/1/2009 6/3/2009 6/9/2009 7/2/2009 10/9/2009 10/26/2009 11/4/2009 11/5/2009 8/15/2009 6/11/2009 6/12/2009 11/19/2009 6/18/2009 7/7/2009 Startup Authorizatio Date Closed n Date 4/30/2009 6/2/2009 3/26/2009 3/10/2009 3/12/2009 7/21/2009 6/8/2009 6/22/2009 4/7/2009 10/26/2009 3/13/2009 10/15/2009

Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

MOC-MC474-09-0006 Continue Operating Topside Window Mount Units MOC-MC474-09-0012 Replace 12" flange bolts on FA tank vents via Hot Bolt MOC-GC787-09-0031 FAM Removal while well remains in production

MOC-MC474-09-0025 Increase FWKO and BOT Temperature to 135 F MOC-MC778-09-0043 Use of Teflon Coated bolts for the Glycol Contactor and Rebo MOC-GC787-09-0084 MOC-GC787-09-0058 Mixture Velocity Concern during Partial Gas Displacement Comp MCC Deck Drain Issues

MOC-MC778-09-0063 Warm Separator aluminum bronze stud replacement MOC-GC782-09-0095 MOC-VK989-09-0038 MOC-GC787-09-0152 Modify Butterfly Valve Specification for Seawater Service MC-72 Diving Operations: Change to DWGOM GP 78-00001 Oxygen Scavenger Facilities for Waterflood

MOC-MC778-09-0126 Addition of a Pad Skimmer to the Glycol Contactor MOC-MC778-09-0135 Reduction in hydrotest times for June TAR Workpacks MOC-VK989-09-0050 Install new Diaphragm Pumps on Float Cell and Water Skimmer

10/25/2009 10/30/2009 11/3/2009 11/12/2009

MOC-MC778-09-0244 Use of Cetco Equipment for Well Flowbacks MOC-GC645-09-0133 Upgrade Holstein PHA and Utility Servers (Part of RFA GC-06)

MOC-MC474-09-0135 Increase Export temp during BOT repairs MOC-GC782-09-0179 Deviation from N and NM Spec Gaskets on BCM Coolers

10/4/2011 1 of 2

GoM Projects (MOC) Report

PMOC Number PMOC-GC787-ATL-09-0030 PMOC-GC787-ATL-09-0031 PMOC-GC782-MDR-09-0002 PMOC-GC782-MDR-09-0003 PMOC-GC787-ATL-09-0032 PMOC-VK915-KGS-08-0005 PMOC-SPS01-SPS-09-0038 PMOC-GC782-MDR-09-0006 PMOC-SPS01-SPS-09-0035 PMOC-VK989-MSC-09-0003 PMOC-VK915-KGS-09-0008 PMOC-SPS01-SPS-09-0039 PMOC-SPS01-SPS-09-0051 PMOC-GC787-ATL-09-0004 PMOC-SPS01-SPS-09-0042 PMOC-GC787-ATL-09-0005 PMOC-SPS01-SPS-09-0043 PMOC-SPS01-SPS-09-0044 PMOC-MC562-ISA-09-0003 PMOC-VK915-KGS-09-0023 PMOC-SSST1-SST-09-0001 PMOC-VK915-DOR-09-0015 PMOC-SPS01-SPS-09-0046 PMOC-VK915-DOR-09-0019 PMOC-MC250-NH2-09-0002 PMOC-SPS01-SPS-09-0012 PMOC-SPS01-SPS-09-0014 PMOC-SPS01-SPS-09-0016 PMOC-SPS01-SPS-09-0017 PMOC-GC787-ATL-09-0022 PMOC-MC562-ISA-09-0005 PMOC-MC562-ISA-09-0006 PMOC-MC562-ISA-09-0007 PMOC-SPS01-SPS-09-0019 PMOC-SPS01-SPS-09-0055 PMOC-MC562-ISA-09-0011 PMOC-MC562-ISA-09-0012 PMOC-MC562-ISA-09-0014

Title RTI Phase I and II Weld Consumable Acceptance Criteria Specification Exception for 5 1/2 inch Gate Valve Atlantis Mad Dog Repair - Increase in Derrick Height Elimination of the Stripping Tank [ABJ-D6451] on the MDRR DES. Vickers Harness requirements for 8630 Mod 3 material vs. HRC reading Non-conformance with GP 43-00 and 78-08 on Pigging Requirements SPS-CP-079 - GIS Deviation for Sandvik Superduplex Tubing for Galapagos Controls HSE Improvements [Electrical] SPS-CP-052 - Change of Well and Flowline Jumper Design MC72 Fixed Riser Final Tie-in Spool Coating change Concession to use Bake Out procedure CDR DQ 0003 - Deviation for using high strength A707 per DQM-0195 Rev. B SPS-CDR-025 Spool Body landing Shoulder out of tolerance SS2 Manifold-North #3 rebuild clad thickness SPS-CP-064 - Use of SS 718 Seal instead of GP36-20 Approved Gasket Material SS2 Manifold-Rebuilt Component Parts SPS-CP-089 - ETP Deviation for Super Duplex Tubes for Isabela Project SPS-CP-088 - ETP Deviation for Super Duplex Tubes Procured from Sumitomo Addendum to Forging STP (DWGOM GIS 36-0001) No holiday detection on internal 6 FBE FJC Re-size wireline equipment OD's to allow use of a landing string with a 5.375'' Incorrect ILS Oreintation SPS-CP-060 - Design a new TH Wireline Plug and a new Internal Tree Cap WL Plug Dorado Tubing strength/integrity testing Nakika H-2 Well Jumper Material Selection Options -Dispensation against GP 36-20 SPS-CP-049 - Remove PMT Debris Caps & Debris Cap Running Tool from Scope SPS-CP-018 - - 825 Gasket Changed to 625 on Jumper Connectors SPS-CP-043 - Add requirements for ECA Analysis & Fatigue Testing Jumper Welds SPS-CP-056 - Revise SPS Standard Pile Soil Design Conditions Phase 2A deviation from assurance requirements - HAZID vs. EDR/PHSSER Length of pipe nipples for Technip WPQT Technip Weld Reinforcement Technip temperature across field joint during coating application SPS-CP-058 - Change in Bulkhead Scope SPS-CP-130 Flexible Hoses for Testing of Subsea Equipment Deviation from DWGOM GIS 06-402-1 Coating Thickness Deviation from DWGOM GIS 06-402-1 and GIS 06-403 Chromate Treatment Technip: Combination of different forging wall thickness qualifications

Priority A (High) A (High) A (High) A (High) C (Low) A (High) B (Med) A (High) B (Med) B (Med) A (High) B (Med) A (High) B (Med) B (Med) A (High) A (High) A (High) A (High) A (High) B (Med) A (High) A (High) A (High) A (High) A (High) B (Med) B (Med) B (Med) A (High) A (High) C (Low) C (Low) A (High)

Project Atlantis Subsea Atlantis Subsea Mad Dog Rig Repair Mad Dog Rig Repair Atlantis Subsea King South SPS Mad Dog Rig Repair SPS MC-72 King South SPS SPS Atlantis Subsea SPS Atlantis Subsea SPS SPS Galapagos King South SPS Dorado SPS Dorado Herschel H-2 SPS SPS SPS SPS Atlantis Subsea Galapagos Galapagos Galapagos SPS SPS Galapagos Galapagos Galapagos

Status Closed Closed Approved Approved Approved Closed Closed Approved Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Approved Approved Approved Closed Closed Approved Approved Closed

Responsible Person Peloubet, Bob Peloubet, Bob Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin J Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Peloubet, Bob Kennelley, Kevin Peloubet, Bob Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin Kennelley, Kevin J J J J J J J J J J J J J J J J J J J J J

10/4/2011 2 of 2