You are on page 1of 3

Personal Data

Name Place/date of birth Nationality Marital Status Passport No. Address Mobile Email Address Position Education Backround : : : : : : : : : : Johan Budhiman Sumuweng Palembang , October 14th, 1968 Indonesian Married T 865042 Exp : Aug th 2014 Perum.Buana Bukit Permata Blok MutiaraNo 118 Tembesi Batam Indonesia 29424 +62 (0) 813-72751936 johanbudhiman@ymail.com Welding Inspector Senior High School / Technical

Training and Course Attended :

Welding Inspector Course ( 263 Hrs )February 11, 2008 - June17, 2008 Balai Latihan Kerja Karya Bangsa - Batam Certificate No: WI 08008

Radiographic Interpretation Level II - Sept 22, 2008 No ASNT SNT TC- 1A 2006 Balai Latihan Kerja Karya Bangsa PT QIS Batam Certificate No: RI 08030

Piping Drafter Conducted by PT PUSRI - Palembang Certificate No: 1048/DIKLAT/10/1992

Compute literate ( Microsoft Window,Excel ) Lembaga Pendidikan Komputer RQ COM Batam NIS : 422/LPK-RQC/IX/2008

Professional Project Experiences


October 1st 2011 upto January 31 st 2012 PT NIPPON STEEL BATAM , INDONESIA Position Project : WELDING INSPECTOR/QC PIPING : TOTAL SOUTH MAHAKAM

Duties and Responsibilities :


Check the material used are complying with AFC drawings Witness the hydrotest activity and ensure all requirements stated in procedure shall be complied Monitor the preheating and interpass temperature Monitor the weld parameters Monitor the pursing gas used for duplex / SS welding Weld visual inspection as per ASME B 31.3,ASME IX, API 1104 & AWS D1.1 Ensure project specification requirements related to welding are been followed Monitor the welder performance and check their qualifications Witnessing of welder qualification test / PQRs Coordinating NDT activities RT, MT, UT, PTNDT Coordinator Leasing with documentation supervisor to ensure that inspection report by using proper form and met the client requerements Ensure that non-comforming product or corrective action request are identified and solved Monitoring and evaluating the Corrective Actions. Ensuring all material and fabrication are certified in accordance with specified requirements. Ensuring visual inspected and NDT procedures are produced in accordance with contract specifications and NDT is carried out and reported when required. Review Radiographic Film as per specifications and code Review test package and NDT Preparing the piping punch list prior to hydrotest

April 20, 2011 upto September 19, 2011 PT MEGA PETRO SYNERGI, INDONESIA Position Location Project : STRUCTURE FITTER
: PT HANJUNG INDONESIA YARD BANDAR LAMPUNG

: GORGON LNG JETTY PROJETC SAIPEM LEIGHTUN CONSORTIUM

Duties and Responsibilities : Fit and fabrication / erection

December 26 , 2010 upto January 15, 2011 PT GLOBAL PROCESS SYSTEM

Position Project

: PIPE FITTER : TEG

Duties and Responsibilities: Fit and fabrication / erection piping Assist Hydrotest

April 01 , 2010 up to August 31, 2010 PT TENG PO HUAT Location Position : PT DRYDOCK WORD INDONESIA - BATAM : WELDING INSPECTOR/Ass.QC PIPING

Duties and Responsibilities: Visually check all gaps of members to be welded to ensure they are in accordance to the welding configuration details as stipulated in the applicable WPS and AFC Drawing. At the same time check all parent metal surfaces to bee wlded to avoid misalignment, bad workmanship. During fabrication check all weld profiles to ensure all undefiled and undercut remedied. Check applications of preheat on each parent metal as stipulated by the PQR and WPS or AFC Drawing to ensure the correct temperatures are properly adhered to. Prepare punchlist on outstanding work distributed them to each concerned area to ensure the remaining outstanding work are complete in time lye manner. Control all records prepared by QC documentation clerk get them approved by each concerned client for proper reference. Prepared drawing isometric , pipe support and NDT weld map for structural drawing Request Applicable NDT after welding completed as per ITP and specification NDT requirement April 08 , 2002 up to February 19, 2003 PT Mc DERMOTT INDONESIA Position : STRUCTURE FITTER

Qctober 01 ,1997 up to February 29, 2008 PT NIPPON STEEL BATAM , INDONESIA Position : STRUCTURE FITTER

Duties and Responsibilities:

Fit Up Fabrication / Erection

Marking / Cutting