SYSTEM INFORMATION System Conditions

The networks are mainly of outdoor type. The basic parameters are set out below: Nominal system voltage between phases Earthing of neutral at transformers System earthing System Frequency System highest voltage Symmetrical short circuit current at rated voltage RMS (ultimate) Impulse withstand voltage Main Transformer Impulse withstand voltage Other Equipment Power frequency voltage (1 min.)- Main Transformer Power frequency voltage (1 min.)- Other Equipment Hz kV kA kV kV kV kV kV 132 Solid Effectively earthed 50 145 25/40 550 650 230 275

A-2

Minimum Substation Clearances connections shall have

Air insulated outdoor and indoor busbars and electrical clearances as listed in the following table: Highest system voltages between phases Minimum clearance between live metal and earth

kV mm mm mm mm

145 1350 1350 2300 3650

Minimum clearance between live metal of different phases Minimum safety clearance between the nearest point not at earth potential of an insulator to ground (Pedestrian Access) Minimum safety clearance between live metal and positions to which access is permissible with other conductive equipment

_____________________________________________________________________________ 132kV L.A. Page 1 of 8

A-3

Pollution levels of Insulators and Bushings 25 mm/kV (Pollution Class III)

A-4

Service Conditions

The following service conditions shall be taken into account in designing of material and equipment. (a) (b) (c ) (d) (e) (f) (g) (h) (i) (j)
(k) (l)

Altitude above sea level Max. ambient air temperature Max average daily temperature Lowest Ambient temperature Max. Solar radiation Mean monthly solar radiation Max. Relative humidity ( 24 hrs) Isokeraunic level Mean wind velocity (24 hours) Annual rainfall up to
System Highest voltage System Earthing , 132kV

< 1000 m 40 C 30 C +5 C 1000 W/m2 425 W/m2 90 % 60 -80 days/an 65 km/hours 5250 mm
145 kV {as applicable} Direct

B.

MINIMUM REQUIREMENTS FOR MANUFACTURERS

The bidder shall ensure, that each equipment offered , is manufactured by a manufacturer with a minimum of ten (10) years successful experience in manufacturing comparable equipment, in rated voltage and capacity, to the equipment offered under the contract. If the offered equipment is manufactured under license, the service experience of equipment manufactured by the parent company shall not be counted as service experience of the licensee equipment. Bidder shall provide adequate evidence of compliance to above requirements to the satisfaction of the C E B . Bids non-complying with above requirements or with incomplete evidence of compliance would be rejected.
_____________________________________________________________________________ 132kV L.A. Page 2 of 8

C.

TECHNICAL SPECIFICATIONS

C-1

The 132 kV station class Gapless Surge Arrestors (for outdoor use) shall be of the metal oxide type using Zinc oxide resistor blocks of non linear characteristic without air gap. They shall comply IEC 99-4 and shall be entirely suitable for operation under the system conditions specified; including system voltage rises on unloading long transmission lines and shall have sufficient capacity to discharge system charging currents without damage. It is expected to use these surge arrestors at the line end and near the HV power transformers. The present surge arrestors have a center to center distance of 3m in the switch yard and transformer bay. The surge arrestor shall be capable or resealing against the maximum transient over voltage (TOV). The surge arrestors shall be connected between each phase and earth in a threephase system. The active element shall be housed in a gas tight insulator of polymer compound. The creepage distance shall be minimum 25 mm/kV phase to phase based on the rated voltage of the system. The surge arrestors shall be equipped with a grading ring. If necessary, an internal grading system may control the voltage distribution along the metal oxide resistor stack. A pressure relief device shall prevent damage by overpressure and discharge counters shall be provided to indicate number of operations for each arrestor. Surge arrestor shall be of heavy duty type. Connection to ground shall be by copper cable via a surge counter. A suitable surge counter shall be provided with the arrestor. Surge arrestor shall withstand maximum local wind force and conductor forces. The arrestors will be mounted vertical upright. The quality of design and manufacturing process shall be assured in accordance with the ISO 9000 series standards. Relevant ISO certificates shall be furnished with the offer.

C-2

C-3

C-4

C-5

C-6

C-7

C-8

C-9

_____________________________________________________________________________ 132kV L.A. Page 3 of 8

D.

APPLICABLE STANDARDS

The equipment and the components supplied shall generally be in accordance with the standards specified below or later editions and/or amendments thereof: D-1 D-2 D-3 IEC 99-4 Metal oxide surge arrestors without gaps for ac system. ISO 9000 series for design, manufacture and quality control. IEC 61166/IEE693 - Seismic acceleration withstand

E. E-1

TERMINAL & NAME PLATE Suitable terminals shall be provided to connect to the existing line. Existing system has two wires of 30mm at each terminal end. Standard type of terminal shall be offered. All the rated data of the complete surge arrestor shall be given on the main rating plate. The individual unit shall have individual rating plate with rated data of that unit. The rating plate shall be attached to the surge arrestor base. If the supplier is granted the offer, the General Arrangement Drawings including nameplate drawing shall be produced for review, before starting the manufacturing process.

E-2

E-3

F. F-1

TESTS. Type tests. Following Type test reports of similar surge arrestors according to the requirements set out by the latest edition of IEC recommendations 99-4 shall be forwarded with the offer. 1. 2. 3. 4. 5. 6. 7. 8. Insulation withstand test Residual voltage test Long duration current impulse withstand test Operating duty test Pressure relief test Tests of arrestor disconnections Artificial pollution test Partial discharge test

_____________________________________________________________________________ 132kV L.A. Page 4 of 8

9. Seal leakage test 10. Current distribution test for multi column arrestor The type tests shall be carried out for a sample manufactured at the same workplace where the offered equipments are manufactured. The type tests shall be carried out by an independent and internationally recognized testing institute for HV equipments. F-2 Routine Tests In addition the manufactured arrestors shall be routine tested according to the IEC standard 99-4 and shall be forwarded with the delivery. All the test reports shall be in English.

G. G-1

PACKING AND DELIVERY Packing.

G-1-1 Precautions shall be taken to ensure that the equipment is safe for transportation by sea. G-1-2 Packing in cases shall be so carried out that there will be no movements of the contents. G-1-3 Each crate or package shall contain a packing list in a waterproof envelope and copies in triplicate shall be forwarded to CEB prior to dispatch. G-2 Delivery Delivery period shall be approximately 16 weeks after opening the LC. Clearing and transport to the site will be done by CEB.

H. H-1 H-2

ERECTION AND MAINTENANCE. Erection and Commissioning of the surge arrestors will be done by CEB staff. A complete erection manual in English which shall comply with IEC/ IEEE standard together with drawings of the complete surge arrestor and counters shall be supplied. Any clarification that will be required during erection shall be provided free of charge.

_____________________________________________________________________________ 132kV L.A. Page 5 of 8

H-3

Complete erection, operation, maintenance and dismantling instructions including mechanical drawings with details such as high voltage terminal drawings, earth terminal details, details of the mounting plate, details of the name plate, bolt torque, etc. shall be furnished with the offer. The operating and maintenance manuals together with all relevant drawings and circuit diagrams shall be supplied.

H-4

I.

VALUES AND DATA. Attached as Annex A

J.

WARRANTY

Warranty period of at least 18 months after delivery or one year after commissioning against design and manufacturing defects shall be applied for all the equipment supplied under the Bid. Manufacturer/ supplier shall agree to supply such defective items or rectify such defects free of charge during the warranty period.

CEYLON ELECTRICITY BOARD GENERATION DIVISION


Generation Headquarters New Kelani Bridge Road, Kolonnawa.

_____________________________________________________________________________ 132kV L.A. Page 6 of 8

Annex A Pg 1 SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS 1. 2. 3. 4. 5. 6. 7. Manufacturer Type Country of origin Type tested yes/no System earthing System BIL Quantity :::::::. . . Yes Direct Earthing 650 kV 40 nos (poles)

No. 1 2 3 4 5 6 7 8 9

DESCRIPTION Nominal system Voltage kV Station class as per ANSI Yes / No System Frequency Type eg. Metal Oxide Standards Highest system voltage Um Cont. operating Voltage Uc Rated voltage Ur Long duration line discharge class In kA kV kV kV

REQUIRED 132 Yes 50 Hz MO IEC 99-4 145

OFFERED

132/3 2 or better 10 300-400 Yes 25 Polymer

10 Nominal discharge current 11

Residual voltage on 8 /20 current impulse (peak kV) Yes/No kV/mm

12 Equipped with counter 13 Creepage distance of insulator 14 Type of insulator 15 Colour of the insulator 16

Leakage current through the coupled arrestor at rated voltage mA

Authorised Signature
_____________________________________________________________________________ 132kV L.A. Page 7 of 8

Annex A Pg 2

No. 17 18 19 20 21 22 23 24 25 26 27

DESCRIPTION No. of units in complete assembly Length of each unit Height of complete arrestor Weight of complete arrestor Grading rings Yes/No Pressure relief capability min. kA Min. mechanical strength (Cantilever) Nm Pressure relief class Terminals to connect 30 mm two conductors Warranty as per Clause 24 of General Conditions Type test reports as per Technical Specification Clause 6 mm mm kg

REQUIRED

OFFERED

Yes 40 1600 A Yes Yes Yes

.. Authorised Signature

Company Seal

Name of the Bidder

Date:- 2011.

_____________________________________________________________________________ 132kV L.A. Page 8 of 8