You are on page 1of 58

Oil & Gas, Petrochemicals and Infrastructure Solutions

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

The Group
Global Project Delivery for :

Oil & Gas Petrochemicals Process

Power Utilities Infrastructure

Buildings Asset Management Telecom and Broadband

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Punj Lloyd Group


Simon Carves Polymers & Petrochemicals Chemicals Bio-fuels

Punj Lloyd Oil & Gas /Infrastructure

Sembawang E & C Buildings Infrastructure Utilities

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Punj Lloyd Overview


Founded in 1989 20 years of professional excellence Active in hydrocarbon and infrastructure sectors Revenues (Group) for Year ended March 31, 2008 Order Backlog as on May 30, 2008 Employees Safety : US$ 1967 Million : US$ 4896 Million : 11,951 : Conforming to highest international standards

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Sembawang Overview
Founded in 1982 25 years of professional excellence Largest EPC contractor in South East Asia Classified under highest Unlimited Financial Category in Singapore for Civil, Building and M&E Present in transportation, infrastructure, buildings, utilities, power, environmental industries Revenues for Year ended March 31, 2008 : US$ 688 Million Order Backlog as on May 30, 2008 Employees : US$ 1737.83 Million : 2,071

Acquired by Punj Lloyd in June 2006

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Simon Carves Overview


Founded in 1881 125 years of professional excellence 4,000 Capital Projects completed to date in 50 Countries Sectors include Polymers & Petrochemicals, Chemicals, Green Technology, Pharmaceuticals & Biotech, Power, Nuclear and Plant Relocation Revenues for Year ended March 31, 2008 Employees : US$ 351 Million : 581

Wholly owned subsidiary of Sembawang Engineers & Constructors since May 2001 Backlog as on May 30, 2008 : US$ 338.33 Million

Safety : Non negotiable

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Value Drivers

Safety Customer Integration Quality

Experience & Resources

Multi-Cultural Teams

Responsive to market challenges

Working Global, Thinking Local

Sustainable Development

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Differentiators

No.1 in Polymers Worldwide

Total Project Life Cycle Support

Diversified Portfolio

Exceeding Customer Expectations

Equity Participation

Enviable Q & HSE records

Technology Integration

In-house Engineering

Large Fleet of Construction Equipment

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Skills and Capabilities


Total Delivery Capability
Engineering
Feasibility Study Master Plan Technology Packages Concept Design / FEED Cost Estimates Detailed Multi-disciplinary Design Validation Construction Services Commissioning Start-up / Training Plant Expansions Statutory inspection

Procurement
Procurement Services Material Management

Construction
Project Management Construction Management

Post Completion
Ongoing technical support Turnaround support O&M Technology improvements De-bottlenecking

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Post Completion
Ongoing technical support Turnaround support O&M Technology improvements De-bottlenecking Plant Expansions Statutory inspection

Engineering Procurement Construction

Post Completion

Life Time Support


March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Manpower Punj Lloyd Group

Punj Lloyd Project Management / Execution Project Services Engineering & Process Management Support Services Total 7,258 3,872 0 171 650 11,951

Sembawang 68 1,887 0 10 106 2,071

Simon Carves UK 56 70 342 14 99 581

Simon Carves Singapore 14 4 110 1 21 150

Simon Carves India 0 0 695 4 42 741

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Beating Deadlines
Motor Spirit Quality Upgradation, Haldia Refinery Dahej Vijaipur Pipeline South Sumatra to West Java Pipeline, Indonesia Gas Export Pipeline, Oman LNG Storage & Regasification Facilities, Dabhol Jamnagar - Loni LPG Pipeline Changi Airport Terminal 2 Extension Belgaum - Maharashtra Highway Vadodara - Halol Expressway Balongan - Jakarta Pipeline Completion in 18 months 42 X 506 km in 9 months 32 X 26.62 km of lowering in 1 day 48 X 21 km of lowering in 1 day Early completion project milestones 8 months ahead of schedule 6 months ahead of schedule 5 months ahead of schedule 4 months ahead of schedule 2 months ahead of schedule

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Major Achievements of the Group


All terrain pipeline specialists, over 8000 km, upto 48 dia

Leading contractor in Process Plants

Only contractor involved in construction of all three LNG terminals in India Singapores LRT / MRT

South East Asias longest and most advanced underground tunnel expressway

Changi Airport Terminal Extension

1st Industrial Park in China to receive ISO9001:2000 certification Worlds largest Wheat base Bioethanol Plant

Nuclear > 3 million engineering manhours 125 years of experience

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Major Achievements Punj Lloyd


Pipelines All terrain pipeline specialists, over 8000 km, upto 48 dia Only Indian company awarded pipeline of the century, BTC pipeline Refineries Tankage & Terminals Infrastructure Completed Modernisation projects Only contractor involved in construction of all three LNG terminals in India Leading road construction company

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Major Achievements Sembawang


LRT Projects CWRP Projects Main Contractor for 2 of 3 Light Rail Projects currently in operation in Singapore Main Contractor for 4 contracts in Changi Water Reclamation Plant Project the worlds largest wastewater program Constructed the longest and most advance expressway in South East Asia IFAWPCA Gold Medal for Civil Engineering Construction (2003) 20 x Construction Excellence Awards (BCA 1987 ~ 2007) 9 x Best Buildable Design Awards (BCA 1993 ~ 2007) 138 Safety Performance Award (MOM 1985 ~ 2007) In China, the first foreign contractor to be awarded ISO 9002 dual certification (SACQS/PSB-1997) by both local and international certifying bodies. First in China to achieve 3 in 1 certification (ISO 1900, OHSAS 1800, ISO 1400). Size of Company Largest EPC contractor in S.E. Asia

Expressway projects Awards

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Major Achievements Simon Carves


Ensus P4 Project Worlds largest wheat derived bioethanol plant Major Alliancing with Client and Sub-Contractors to deliver a cost effective large Agrochemicals Plant, on a pain/gain basis. First ever turnkey contract between UK and the former Soviet Union, which included the largest export credit ever arranged for the USSR, value 260m Alliance with the world renowned Rolls-Royce to redevelop Dockyards (DML) Plymouth facility for future refuel and refit of the Royal Navys fleet of nuclear powered submarine First ever UK Process Engineer Contractor to be registered to : BS5750 (now ISO9001) in 1989 Leading Contractor in Polymers Entrusted by BASF with their world scale investment in China More than 350 Sulphuric Acid Plants built worldwide More than 3,000,000 nuclear engineering and design man-hours expended Over 125 years old

Yerevan

D154

Quality & Safety

Polymers

Sulphuric Acid Nuclear Experience

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Clients

OSCC

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

International Offices

UK

India

Singapore

Iran UAE Qatar Saudi Arabia Oman Libya Yemen


March 2009

Kazakhstan Russia China Malaysia Vietnam Indonesia Thailand

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Organisational Structure
PUNJ LLOYD LIMITED

REGIONAL HEADQUARTERS
CASPIAN PUNJ LLOYD KAZAKHSTAN LLP ALMATY ASIA PACIFIC PT. PUNJ LLOYD INDONESIA JAKARTA MIDDLE EAST PUNJ LLOYD LIMITED ABU DHABI SOUTH ASIA PUNJ LLOYD LIMITED NEW DELHI

INTERNATIONAL OFFICES

JOINT VENTURE COMPANIES

UK

QATAR

PIPAVAV SHIPYARD LTD INDIA

RUSSIA

OMAN

KAZAKHSTAN

SAUDI ARABIA

DAYIM PUNJ LLOYD CONSTRUCTION CONTRACTING CO LTD SAUDI ARABIA

LIBYA

YEMEN KAEFER PUNJ LLOYD LTD INDIA

SINGAPORE

UAE

VIETNAM

INDONESIA

THAILAND

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Punj Lloyd Group Companies

PUNJ LLOYD LTD


Oil & Gas/Infrastructure

SEMBAWANG E&C
Utilities, Infrastructure, Buildings

SIMON CARVES
Petrochemicals, Refineries, Chemicals, Pharma, Nuclear and Industrial

Punj Lloyd Pte Ltd, Singapore EPC for Oil & Gas and Infrastructure PT Punj Lloyd Indonesia EPC for Oil & Gas and Infrastructure PT Sempec Indonesia Engineering of Oil & Gas Onshore and Offshore Facilities Punj Lloyd Kazakhstan LLP Oil & Gas in the Caspian PLN Construction Ltd, India Horizontal Directional Drilling Spectra Punj Lloyd Ltd, India Equipment Management Punj Lloyd Upstream Ltd, India Integrated Drilling Services

Sembawang (Tianjin) Construction Eng. Co. Ltd Design, Engineering & Construction of Buildings & Infrastructure Sembawang Infrastructure (India) Pvt Ltd Design, Engineering & Construction of Buildings & Infrastructure Sembwang Engineers & Constructors Middle East FZE Design, Engineering & Construction of Buildings & Infrastructure Sembawang (Malaysia) Sdn Bhd Design, Engineering & Construction of Buildings & Infrastructure Sembawang Bahrain S.P.C. Design, Engineering & Construction of Buildings & Infrastructure SC Architects & Engineers Ptd Ltd, Singapore Master Planning, Engineering & Design Consultancy Services

Simon Carves Singapore Pte Ltd Engineering Services Engineering Outsourcing Arm Simon Carves India

Construction Technology Pte Ltd, Singapore Manufacturing of Precast Components for Engineering & Constructing Industry

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

PLL Revenue - Consolidated

REVENUE
2500
USD in million USD in million

EBDITA
USD in million

PAT
190

2000 1500 1000 500 0 2004 411

4 GR CA

7.9

1%

1967 1322

200 150 100 50 0 51


G CA

8. R3

93 %

*
124 57

100 80 60 40 20 0 27

3 GR CA

5.1

2%

90

*
50 14

488

436

53

26

2005

2006

2007

2008

2004

2005

2006

2007

2008

2004

2005

2006

2007

2008

Year

Year

Year

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

PLL Revenue - Standalone

REVENUE
USD in million

EBDITA
1135
USD in million

1200 1000 800 600 400 200 0 2004 289

*
64

PAT
142
USD in million

4 GR CA

7% 0.7

150
GR CA

55 28.

585 379 356

100 52 50 0 49 44

60 50 40 30 20 10 0

G CA

3. R5

14 %

*
16 9

55

10 2 2004 2005

2005

2006
Year

2007

2008

2004

2005

2006
Year

2007

2008

2006
Year

2007

2008

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

PLL Revenue (Consolidated)


Geographical Segment Business Segment
Pipeline 26% Other 3%

Middle East 14% South Asia 40%

Tankage 6%

Asia Pacific 23% Caspian 1%


Infrastructure 29% Process 36%

Rest of World 22%

Description South Asia Middle East Asia Pacific Caspian Rest of World Total
March 2009

USD MN 773 269 457 28 441 1,967

Description Pipeline Tankage Process Infrastructure Other Total

USD MN 510 113 714 573 57 1,967

Oil & Gas, Petrochemicals, and Infrastructure Solutions

PLL Order Backlog (Consolidated)


Geographical Segment
Middle E ast 18%

Business Segment
Tankage 3% ProcessPlant 39%

Pipeline 23%
outh Asia 30%

Asia Pacific 42% Rest of World 5% Caspian 5%

Infrastructure 29%

Description South Asia Middle East Asia Pacific Caspian Rest of World Total

USD MN 1,452 879 2,094

Description Pipeline Tankage Process Plant

USD MN 1,139 139 1,928 1,691 4,896

234 238 4,896 Infrastructure Total

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Safety Statistics
Particulars Total Manhours Worked Fatalities Lost Time Injuries Frequency Rates Lost Workdays Severity Rate Recordable Cases 2004 29,621,657 0 4 0.03 27 0.18 26 2005 28,429,618 0 7 0.05 27 0.19 48 2006 36,956,522 0 5 0.03 34 0.18 66 2007 48,549,540 0 6 0.02 35 0.14 47 2008* 64,164,570 0 3 0.01 16 0.05 42

No. of LTI Cases Frequency Rate = Formula Mandays Lost due to LTI Severity Rate = Total Manhours worked Total Manhours worked

x 200, 000

x 200, 000

* Till December 2008


March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Safety Culture
Safety is Paramount : in design in construction inside / outside the workplace Achieving Safety Targets through : safety audits training safety records / benchmarking Recognition and Awards : ISO 9001 OHSAS 18001 ISO 14001 Man-hours without lost time injury : 16 million 12 million 8.5 million 7 million 5 million 4 million 4 million 4 million 2.5 million Belgaum, Maharashtra Dabhol Kazakhstan Dahej Abu Dhabi Haldia Turkey Indonesia Georgia

11.2 million Dahej-Vijaipur

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Global Project Delivery Solutions for :


Oil & Gas Offshore, Onshore & Offshore Pipelines, Onshore Field Development, Tankage and Terminals Refineries, Polymers & Petrochemicals, Chemicals

Process

Power

Thermal, Nuclear

Utilities

Water & Sewage Treatment Facilities, Reservoirs, Centralised Utilitise

Infrastructure

Subway & Metro Systems, Airports, Highways & Expressways, Bridges, Flyovers & Interchanges, Tunnels & Caverns, Seaports & Terminals Hospitality & Leisure, Commercial, Industrial, Institutional & Residential Complexes, Healthcare, Townships & Industrial Parks Asset Preservation & Maintenance

Buildings

Asset Management

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Oil & Gas

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Gas Processing
Natural Gas Pipeline in Tuas and Jurong Area, Singapore Total E&P Tambora Field Development Project Phase 2, Indonesia Peciko Field Development Phase 4 for TotalFinaElf, Indonesia KODECO Onshore EPC Services for Poleng Process Platform Petro China EPC Service for Betara Complex Development, Sumatra Gas Field Development for Oil India Limited, India

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Offshore & Shallow Waters


Heera Redevelopment Offshore Platform, India Uran Trombay Jawahardeep Oil Pipeline, India Total E&P Tambora Field Development, Phase 2, Indonesia Tunu Field Development Phase 9, Indonesia Panaran Pemping Gas Pipeline, Indonesia Effluent Outfall System, India

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Terminals & Docks


EPC Refrigeration storage tanks at Jiangsu, China Storage Terminal with 120,000 DWT berth, Singapore Oil Tanking Terminal for Oil Tanking(S) Pte Ltd, Singapore Construction of dry dock and wharves, Singapore Construction & Erection of Jetty at Pulau Seraya, Singapore Construction of Container Feeder Berth, Singapore Finger Pier extension at Sembawang Shipyard, Singapore Jetty Extension at Loyang Crescent, Singapore Karimun Shipyard Development, Indonesia Zouec / DPEC LPG Terminal Project in China

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Tanks and Terminals


Crude / Product Oil In-house design capability Presently executing 80 m dia tanks LNG Tanks Only contractor globally to have experience of mechanical, civil and insulation work for LNG tanks Executed four LNG tanks of 160,000 m capacity, -162 C storage temperature, 80 m dia, 53 m height First Indian contractor to have constructed LNG regasification terminal Only contractor involved in the construction of all 3 LNG terminals in India Dabhol, Hazira, Dahej LPG Tanks (Cryogenic) Only Indian Contractor to have executed LPG/Cryogenic tanks on EPC basis

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Tanks and Terminals


Offsite & Storage Facilities for Panipat Refinery Indian Oil Corporation Ltd. Onshore Gas Development Phase III Abu Dhabi Gas Industries Ltd. Bulk Liquid Storage & Blending Facility at Meranti Helios Terminal Corporation Pte. Ltd., Singapore Tank Terminal Project at Pulau Busing Tankstore - Singapore LNG Storage (2X148,000M3) Tank Expansion Dahej for IHI Jurong Bulk Liquid Product Terminal Horizon Terminals Pte. Ltd. - Singapore Low Storage (2x160,000 M3) for Receiving Terminal Hazira for Shell LNG Storage (3X160,000M3) and Regasification Terminal Dabhol for Skanska Steel Storage Tanks for Water and Power Project Technip

Built in excess of 8 million m3 of storage capacity

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Pipelines
Successfully commissioned pipelines upto 48 diameter Own and maintain 20 spreads of pipeline equipment upto 56 dia Own 18 Automatic Welding machines Punj Lloyd introduction this technology in India Shallow water and swampy terrain experience Executed/Executing 8000 km of pipeline for hydrocarbon service Leading pipeline contractors in Asia Own HDD equipment upto 400 mtr

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Pipeline Projects
Projects In Overseas
Sabah Sarawak EPC Gas Pipeline, Malaysia OGC Pipelines, Oman EPIC of Doha Urban Pipeline Relocation, Qatar Ethylene and Butane Pipelines, Qatar Melita-Tripoli & El Khoms -Tripoli Gas Pipeline, Libya EPC for Oil & Gas Export Pipelines, Kazakhstan South Sumatra to West Java Gas Pipeline Phase I, Indonesia Asab Gas Development Project Phase II, Abu Dhabi Huwailah Field Development, Abu Dhabi Flowlines and Well Heads Installation, Abu Dhabi Gas Export Pipeline, Oman BTC & SCP Pipeline, Georgia SGP Flowlines, Kazakhstan Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project, Turkey KAM Pipeline Project, Kazakhstan
March 2009

Projects In India
East West Gas Pipeline Dabhol-Panvel Pipeline Backwater and Onshore Pipeline, Kerala Dahej-Uran Pipeline Mundra-Delhi Pipeline Uran Trombay Pipeline, Mumbai Shore Approach Pipeline, Adani Dahej-Vijaipur Pipeline Mangalore-Bangalore Multi-Product Pipeline Jamnagar-Loni LPG Pipeline Gas Rehabilitation & Expansion Project Kandla-Bhatinda Multi-Product Pipeline South Bassein Hazira Trunkline

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Refineries
EPC capability for medium size packages Completed 11 Refinery Modernisation projects in 8 years

Single largest equipment lifted : 590 MT

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Refineries/EPC
EPC Kerosene Distillation Unit Plant and Construction of Main Building & Amenities, Singapore Yemen LNG Project For Utilities & Offsites Yemen LNG Company Ltd., Yemen Fuel Systems New Doha International Airport, Qatar Peciko Field Development Phase 4, Indonesia TotalFinaelf Motor Spirit Quality Upgradation Project Indian Oil Corporation Ltd., India Delayed Coker Unit, Indian Oil Corporation Ltd., India Sulphur Block, Bharat Oman Refinery Ltd., India Hydrocracker Unit & Hydrogen Generation Unit Indian Oil Corporation Ltd., India Sulphur Blocks Six Indian Refineries 37,000 TPA Grass Root MTBE Plant Indian Oil Corporation Hydrocracker Units, Mathura Refinery Indian Oil Corporation Constructed Critical Sections CDU/VDU/VBU Indian Refineries 10.5 MTPA Essar Refinery, Vadinar, Gujarat

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Process

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Chemicals
CRISTAL Project, Membrane Chlorine Plant; Expanded Ti02 Yanbu, Saudi Arabia 100 MTPD Sulphuric Acid Project, Saudi Arabia, Basic Chemicals National Company 1000 TPD Sulphur Burning Acid Plant, TCH Belgium Turnkey SAFCO Sulphuric Acid Project, Dammam, Saudi Arabia EPC of 45 MTPD Singapore Refining Company, Jurong, Singapore Agrochemicals Project for Syngenta, UK

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Pharmaceuticals
Multifunctional Biomanufacturing Centre for NBC, Liverpool R&D facility for milling & micronising of potent products for AstraZeneca UK Site master planning & concept development for multi purpose secondary manufacturing facility for CCM Pharma, Malaysia

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Polymers & Petrochemicals


EPC for 300 KTPA LDPE Plant, Thailand for PTT Polyethylene Co. Engineering and Project Management of 30,000 MTPY Specialty Chemical Plants, Indonesia FEED & EPC for 400 KTPA LDPE Plant, UK for Huntsman EPC for 300 KTPA LDPE Plant, Iran for Amir Kabir EPC for 250 KTPA Polystyrene Plant, Iran for Pars Petrochemical 400 KTPA LDPE Plant, China for BASF-YPC 226,000 TPA LDPE Project, Jubail, Saudi Arabia EPC of Polyurethane Plant, Seraya, Jurong Island, Singapore EPCm 90,000 TPA chemical plant, China EPC Quaternary Ammonium Product, Jurong Island, Singapore EPCm for 70,000 MTPY PA Plant, China

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Power

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Thermal
EPC 3 x 700 MW Power Plant - BOP Components, erection of Turbine & Generator and Coal and Ash Handling Plants, Malaysia EPC High Pressure piping system for 250 MW Power Plant, Singapore EPC 815 MW CCP - balance of plant including Civil & Structural work, Singapore EPC High Pressure piping system for 150 MW Paka Power Plant, Malaysia 2 x 30 MW Coal Fired Power Project, Poyry Energy Ltd, Indonesia 2 x 270 MW Thermal Power Station GVK Power Ltd., Punjab 2 x 250 MW Thermal Power Station Rajasthan Rajya Vidhyut Utpadan Nigam Ltd., Rajasthan 4 x 250 MW Power Plant Jindal Power Ltd., Chhattisgarh

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Nuclear
Upgrade of Britains Submarine Refit Complex at Devonport Nuclear Fuel Reprocessing for Sellafield Facility, UK for BNFL New Fuel Oxide Plant for BNFL, UK Vitrification Plant for BNFL, UK Rajasthan Atomic Power for Nuclear Power Corp. of India, India

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Utilities Municipal
EPC project of Utilities in Tripoli, Libya Water-Sewerage-Storm Water mains & branch lines, Roads & other facilities Changi Water Reclamation Plant contracts for Digesters, Civil and M&E Work, Sludge Drying System, Liquid Module 2, Civil Work and Scrapers Ulu Pandan Sewage Treatment Work - covering of existing treatment units contract for the servicing & maintenance of the Odour Treatment Facilities & associated ductwork, Singapore Kim Chuan Sewerage Treatment Work. West Work Phase 1 Redevelopment work Contract 2 - Liquid Train/Liquid Stream Deep Tunnel Sewerage System, Contract T-05 and Contract T-03, Singapore Kim Chuan Refuse Storage and Transfer Station, Singapore Ulu Pandan Refuse Incineration Plant, Singapore Newater Service Reservoirs at Tampines

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Transportation
First Bridge in Singapore linking the mainland to an offshore island. Constructed using Caisson and balanced cantilever method Interchange- 400m long dual carriageway supported by 9 striking arched piers and across a 180m long underpass Light Rapid Transit Systems - 29 stations and 21 Km of track Marine projects including - Jetties, Naval Base, Container Feed Berth, Pier Extensions MRT Elevated and Underground stations and tracks Aircraft Taxiway Runway & Parking Apron - CAAS, Singapore

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Transportation
Flyovers, Highways and Roads, National Highways Authority of India/RIDCOR Foundations and Piling, U.P. State Bridge Corp. Ltd. Elevated Via Duct, Delhi Metro Vadodara-halol Expressway on Boot, Vadodara-halol Toll Road Ltd. Infrastructure Services to Dukhan, Qatar Petroleum

18 Highway Projects / 1200 km 13 sets of bituminous road equipment and 3 sets of concrete paving equipment
March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

High-Spec Buildings
Sembawang on the forefront of the international arena Integrated design & construction activities into seamless process Successfully undertaken projects of all building types; commercial, residential, industrial, training facilities, healthcare, hospitality & leisure Strength in Design & Build fast-track projects with emphasis on value engineering Awards & accolades from building authorities over the years bear testament to this. Delivered shopping mall, ahead of tight schedule

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

High-Spec Buildings
Wafer Fabrication Plants Manufacturing Facilities Logistics and Warehousing Facilities Commercial Complexes and Mixed use Retail Malls Residential Institutions and Healthcare Facilities Resorts, Golf Course and Country Clubs

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Asset Management
Maintenance 740 MW gas based power plant and LNG storage and regasification terminal, Dabhol Power Corporation, Maharashtra Toll management for Vadodara - Halol Expressway Vadodara-Halol Toll Road Ltd., Gujarat Daewoo Automobile Plant, Daewoo Motors, Delhi Captive Power Plant, Hindustan Aeronautics, Assam Gas processing and gathering facilities, Oil India Ltd., Rajasthan

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

KAEFER Punj Lloyd


Solution providers for thermal insulation Capabilities include Electrical Heat Tracing, Roofing and Facade Systems Sound Quality and Safety Practices Major projects executed Mathura, Vadodara, Reliance and Panipat refineries in India Insulation work for LNG Terminals Dabhol, Hazira and Dahej

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

PLN Construction
Horizontal Directional Drilling Solutions Drilling through every soil condition Total crossings executed 49,000 mtr Four rigs, 250 to 400 T capacity World class crossings: 48 x 1,451 mtr 42 x 1,040 mtr 24 x 1,942 mtr 24 x 1,810 mtr 18 x 1,771 mtr

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Equipment Assets
Large fleet of Equipment which can be readily mobilised Amphibian equipment including swamp excavators, dredgers, marsh buggies, flexiyoke work barges, swamp cranes, pushpull pipelay barge Equipment assets valued at USD 250 million 20 spreads of pipeline equipment 13 sets of bituminous road equipment 3 sets of concrete paving equipment Young equipment fleet minimum downtime

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Equipment Yard & Maintenance Facilities


Central India Facilities in Banmore spread over 20,000 sq mtr Track Repair and Engine Maintenance facility area - 7,000 sq mtr Sungaipurun yard, Indonesia with jetty facilities 45,000 sq mtr Accessible by land and water Facilities in Habshan spread over 25,300 sq mtr

Indonesia

Abu Dhabi

Inventory maintained on ORACLE based ERP system Equipment managed by Maximo software
March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Accreditation
OHSAS 18001:1999 Health & Safety ISO 14001:2004 Environmental Management ISO 9001:2000 Quality Management

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Policies

March 2009

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Awards
Project Exports Promotion Council of India
Maximum Overseas construction contracts secured for Year 2002-03 / 2003-04 / 2004-05 Maximum Foreign works secured in new areas for Year 2002-03 / 2003-04 / 2004-05 Maximum Turnover in Overeas construction contracts for year 2004-2005 / 2006-7 Maximum Value of Overseas construction and engineering projects contracted for year 2005-2006 / 2007

SEC Awards
20 x Construction Excellence Awards (BCA, 1987 to 2005) 9 x Best Buildable Design Awards (BCA, 1993 to 2005) 138 x Safety Performance Gold / Silver / Merit Awards (MOM, 1985 to 2005) British Safety Council 5 Star Award for last five years Engineering Construction Industry Association (ECIA) Safe Working Award (1995) National Productivity Award (PSB, 1994) Overseas Enterprise Award (EDB, 1997)

Greentech Safety/Environment
2004-05/06 - Safety - Gold 2004-05 2005-06 2007 2007 2008 2008
March 2009

- Environment Excellence - Gold - Environmental Excellence - Gold - Safety - Gold - Environment Excellence - Gold - Environment Excellence - Platinum - Safety - Gold

Oil & Gas, Petrochemicals, and Infrastructure Solutions

Our Pledge
The Safety of People The Protection of the Environment The Assurance of Speed and the Control of your cost The Quality of our Service The Success of your Project

March 2009

You might also like