You are on page 1of 3

Problem statement

MAA Garment factory is one of modern and export-oriented Garment and Textile Company in Ethiopia. As our observation the company uses traditional way of maintenance system. to be competitive in the world market they should implement modern maintenance system which is proven by word leading textile industries. Due to this, the company couldnt use its full capacity. In addition to this problem, the machinery that is failed may be out of function for long period of time attributable to shortage of spare part, poor communication and cooperation system prevailing in the factory. Generally, the maintenance system of factory is based on poor integration of all functions and processes in the organization, which results in: High maintenance cost Less availability and reliability of equipments High total maintenance hour and man hour Frequent failure of machineries Low profit Low production Workers dissatisfactions

As MAA Garment factory is having high demand of textile products, enhancing the performance of factory through implementing well developed and organized maintenance system will not only help the factory to have efficient way of maintaining its different but also it produces high quality product which makes the factory high competitive in the world market. It enables the factory to keep the level of spare parts in stock at a minimum level for effective maintenance and for savings of foreign currency. Hence, this project aims at addressing and improving the maintenance system of the factory to clearly scrutinize the hidden factors, which hinder the capacity of the factory.

Objective of the project


Based on observed problems, the study mainly focuses on dealing with the way that the MAA garment factory enables to improve the existing maintenance system of the company to have better capacity utilization and to enhance the effectiveness of its equipments. Hence, the project will try to fulfill the following objectives.

General objective
The general objectives of the project are: Assessing the existing maintenance system of the company

Specific objective
Critically examine and investigating the problems of the existing maintenance system Identifying the key potential area for the improvement of system. Propose developed maintenance system and implementation model.

Research methodology
Relevant primary and secondary information was congregated using questionnaire and interview is structured way besides direct-observation on site visit. The relevant secondary data was collected from the technical manual, monthly and annual report of the factory. The project begins with conceptual literature study to develop and structure suitable questionnaire and ways of interview. The literature is also reviewed side by side with data acquired from interviews and observations to develop better maintenance system to factory. The collected data mainly aims at assessing the existing maintenance system and the future business plan of the factory. Besides, the data is synthesized with literature for investigating the potential area of improvement as shown in figure 1. Data analysis in the project has been conducted using appropriate tools in order to identify core problems in the company.

You might also like