LNG Tank Ningbo - China for CNOOC Zhejiang Ningbo LNF Co. Ltd.

, China

PROJECT DATA: Location: Owner: Contractor: Year of Completion: TGE Project Number: Beilun, Ningbo, Zhejiang Province China CNOOC Ningbo LNG Co., Ltd. TGE/CHENGDA 2012 5059 Zhejiang LNG Receiving Terminal Project

PROJECT DESCRIPTION: LNG Storage Tank: The scope of work defines three 160,000m3 full containment LNG storage tanks. The primary standard of LNG Tanks shall be EN14620-2006 for design, manufacture, inspection and testing, drying, purging and cool down. The main features of the LNG storage tanks are listed as below: - Piling and Foundation - A concrete outer tank consisting of a reinforced concrete base slab, a post tensioned concrete wall connected rigidly to the slab, and a reinforced concrete roof, rigidly connected to the wall. The LNG storage tanks shall be elevated base slab foundation. - A carbon steel liner covering all inside surfaces of the concrete outer tank and acting as a vapour barrier. The roof liner is the formwork for the roof concrete and may act as a composite structure with the reinforced concrete roof. - A 9% nickel steel open top inner tank - A thermal protection system (TPS) acting as Thermal Corner Protection System, it includes insulation as Foam Glass Blocks, covered by a 9% nickel steel shell . The top of the TPS shall be anchored into the concrete wall

TGE Gas Engineering GmbH Mildred-Scheel-Str. 1 53175 Bonn, Germany

Tel: +49 (0) 228 60448 0 Fax: +49 (0) 228 60448 888 tge-gas.com / info@tge-gas.com

A suspended deck, supported by hanger from the roof. The suspended deck shall be made of aluminum alloy, stainless steel, or 9% nickel steel A tank insulation system including insulation under the inner tank bottom, insulation between the steel inner tank shell and the concrete outer tank, insulation on the suspended deck and insulation of the roof penetrations and internal piping. A set of nozzles and relevant internal piping Internal access and structural steel works External access and structural steel works including roof platform External piping on the tank roof and wall with its supports Tank instrumentation for level, pressure and temperature recording, leak detection, and cooldown control, and any other tank instrumentation specified. Safety valves for pressure and vacuum protection, with interlocked isolating valves and tail pipes. A settlement monitoring system for the outer tank Electrical equipment Submerged pumps A lifting device for submerged pump handling A fire detection system A fire fighting system

TGE SCOPE: EPC turn-key contractor: - Authority Engineering - Basic Engineering - Procurement Off Shore - Detail Engineering - Construction - Installation - Mechanical completion - Commissioning - Start-up - Performance Guarantee testing - Technical support during run test Main Dimensions and Quantity Parameters: Inner Diameter Tank: 82.00 m Tank Top Level at Centre Point: 50.50 m Bottom Slab Thickness: 1.00 m Concrete Wall Thickness: 0.70 m Diameter Piles: 1.50 m Concrete Volume Piles: 105.000 m3 Concrete Volume Tanks: 70.000 m3 9% Nickel Steel: 6.000 tons