You are on page 1of 7

PP Quiz 70 POINTS (2 Points Each) 1.

The SAP module with the primary purpose of ensuring material availability for production and for sales is a. FI b. CO c. PP d. MM

2. The type of order proposal automatically generated during materials planning depends upon the a. Materials purchasing group b. MRP controller c. Product group d. Type of material

3. Required quantities and delivery dates for finished products are determined by a. Demand management b. Planning strategies c. Sales orders d. Dependent requirements

4. Which of the following is a planning strategy used in production planning? a. Make-to-order production b. Assemble-to-order production c. Make-to-stock production d. All of the above are planning strategies

5. Production to meet long lead time requirements to produce certain assemblies before theyare needed for sales orders is based upon a. Customer demand management b. Assemble-to-order production strategies c. Sales forecasts d. MRP schedules

6. The production strategy based on the need to produced independently of orders so thatgoods can be provided immediately to customers is the a. Assemble-to-order strategy b. Make-to-stock strategy c. Production demand strategy d. MRP production schedule

7. Which of the following is true for a make-to-stock strategy a. The material may or may not have a BOM b. The material may be produced in house of procured externally c. Smoothing of production is a desired result d. All of the above are true for the make-to-stock strategy

8. In the make-to-order production strategy, the demand program does not determine which products will be produced. a. True b. False

9. Producing a specific product for an individual customer is the basic function of whichstrategy a. Make-to-order b. Assemble-to-order c. Both of the above d. Some other strategy

10. Once quantities and production dates are committed to a sales or production order,neither can be changed a. True b. False

11. That which permits material requirements planning and production planning for rawmaterial and finished products is the a. MRP views for the material master records b. BOM c. Routing d. Demand management program

12. The complete structured list of the components that make up a product or assemble isknown as the a. MRP view b. Routing c. Work centers d. BOM

13. The description of the operations that have to be accomplished to produce a material is the a. MRP view b. Routing c. Work centers d. BOM

14. A routing can contain data related to which of the following a. BOM b. Work centers c. Production resources and tools d. All of the above

15. The location where operations have to be accomplished to produce a material is the a. MRP view b. Routing c. Work center d. Plant

16. The duration of an operation is determined by data linked primarily to the a. MRP view b. Material master record c. Work center d. BOM

17. Work centers can only be assigned to a plant a. True b. False

18. In house production of products is accomplished through the use a. Planned orders b. Purchase requisitions c. Both of the above d. Neither a nor b

19. Planned orders may be converted into a. Production orders b. Purchase requisitions c. Either of the above d. Neither a nor b

20. Materials can be procured at a series of predefined points in time over a certain periodunder a a. Quota arrangement b. Purchase agreement c. Purchase requisition d. Scheduling agreement

21. A planned order provides each of the following except a. The basis for capacity calculation b. The basic dates for production c. The determination of in-house or external procurement d. The basis for a production order

22. Production orders can be generated from a. Planned orders b. Assembly orders c. Manually d. Any of the above

23. When a production order is created, each of the following occurs except a. Purchase requisitions for stock items b. The BOM is exploded c. Planned costs for the order are generated d. Operations and sequences are transferred to the order

24. A production order specifies a. Which material is to be produced b. Where a material is to be produced c. On what date production is to occur d. All of the above

25. A request to maintain a material for issue at a future date for a production order is a a. Purchase requisition b. Planned order c. Assembly order d. Reservation

26. When production is completed, costs can be settled to a. An inventory material account b. A sales order c. Either of the above d. Neither a nor b

27. Costs that are assigned directly to a production order are a. Primary costs b. Secondary costs c. Internal costs d. External costs

28. Which of the following is not a component of the time of an operation? a. Setup time b. Processing time c. Wait time d. Move time

29. The proof of the movement of a material from production to the warehouse is the a. Material document b. Goods receipt c. Completion confirmation

30. The document that transfers the cost of the goods produced from production to finishedgoods inventory is the a. Material document b. Goods receipt c. Completion confirmation d. Accounting document

31. In the standard SAP system, production orders cannot be released on non-work days or holidays. a. True b. False

32. Trade goods may be used in production a. True b. False

33. Goods that will be immediately shipped to customers are transferred from production tothe a. Warehouse b. Shipping area c. The materials inventory d. MRP system

34. A planned order cannot be changed as to quantity or finish date when it is beingconverted a. True b. False

35. Planned orders must be converted individually into production orders a. True b. False

You might also like