Technical Points are to be considered and incorporated for the system operational integrity in future. MV panel room cable trench for generator cables are not coordinated with the structural for bottom cable entry. Prior to raft foundation casting. It could be solved by the top entry. Where the cables 7x1 cx800mm (fire rated) are to be raised from the trench.
Technical Points are to be considered and incorporated for the system operational integrity in future. MV panel room cable trench for generator cables are not coordinated with the structural for bottom cable entry. Prior to raft foundation casting. It could be solved by the top entry. Where the cables 7x1 cx800mm (fire rated) are to be raised from the trench.
Technical Points are to be considered and incorporated for the system operational integrity in future. MV panel room cable trench for generator cables are not coordinated with the structural for bottom cable entry. Prior to raft foundation casting. It could be solved by the top entry. Where the cables 7x1 cx800mm (fire rated) are to be raised from the trench.
M/S WCT Berhad P. O. Box: 200238 Tel: +974 44279780 Fax: +974 44279781 Doha - Qatar .... ",iY :...:... . ...,.....- ".'. ", .. Ref: 10/SD/PME/TGIEM/MOI/11 28 th April 2011 Attn Cc : Mr. Koh Lek Keong - Sr. MEP Coordinator : Mr. Darshan K Bahl - TGIEM Project : MINISTRY OF INTERIOR HEADQUARTERS AT WADI-AL SAIL. DOHA. QATAR Dear Mr. Koh. Subject : Technical Points - MSCP MEP Coordination Drawings Upon our reviewing the MEP coordination drawings with partner TGIEM engineers. we have noticed that the technical points mentioned below. are to be considered and incorporated for the system operational integrity in future. 1) Generator room ventilation system to be studied by specialist. 2) Fuel system arrangements for generators including bulk tank and daily tank with associated piping. fuel transfer pumps & accessories to be considered. 3) FM200 occupied rooms to be provided with necessary motorized dampers. fire curtains & motorized louvers on doors & windows. 4) Fire fighting pump control panels for electrical. diesel. jockey and Chilled water pump control panels for primary & secondary pumps to be located at accessible areas. in line with CDD requirements. 5) VFD control panel is shown for the primary chilled water pumps. but on the electrical schematic drawing. they are constant speed pumps. as per HV AC equipment schedule drawings. 6) MV panel room cable trench for generator cables are not coordinated with the structural for bottom cable entry. prior to raft foundation casting. It could be solved by the top entry. where the cables 7x1 cx800mm (fire rated) are to be raised from the trench. 7) Changes of electrical loads for all mechanical equipments after material submittals approvals are to be considered in the electrical panels. This is for your kind information, records and appropriate action. Best regards. For V.Swamy Electrical Manager powermech@qatar.netqa - #- Tel. +974 4659334.4659735,4657484. Fax
. \Ai +'\Vi t "\.cVtAi ,neWt:! : jp.fo \sgo'l . Box. 12222. Doha _ Qatar, E-mail: powermech@qatar.net.qa__/.7 MEP Certified Contractor Class "A" Unlimited