KW 1.5
Remarks Column
1 A:Raw Graim Input System 2 Grain Hopper and dust collector 3 Subtotal 4
SET
5 Bucket Elevator 6 Drum Sieve Precleaner 7 Vibrating Separator 8 De-stoner 9 Magnetic Separator 10 Subtotal 11
MMJP150X4 23 Double Rice mist water PolisherMP185-2 24 Color Sorter AM320 25 Subtotal 26
F:Packaging System
DTDG26/15 DCS50S UNIT UNIT 2 2 1.1 2 2.2 4 6.2 H=5.8m Weighting 5-50kg
31 air fan 32 air lock 33 glass cyclone 34 galvanized elbow pipe 35 galvanized reducingnipple 36 air cowl galvanized 37 straight pipe galvanized 38 flange 39 standard parts 40 Subtotal
S/ N 41
Model
Spec
UNIT QTY
POWER
KW 7.5 1.5
Remarks Column
42 air fan 43 air lock 44 glass cyclone 45 galvanized elbow pipe 46 galvanized reducingnipple 47 air cowl galvanized 48 straight pipe galvanized 49 flange 50 standard parts 51 Subtotal 52
unit 260
53 air fan 54 air lock 55 glass cyclone 56 galvanized elbow pipe 57 straight pipe galvanized 58 air cowl galvanized 59 straight pipe 60 elbow pipe 61 reducingnipple 62 flange 63 standard parts 64 Subtotal 65
unit 320
66 air fan 67 air lock 68 dual glass cyclone 69 galvanized elbow pipe 70 straight pipe galvanized 71 air cowl galvanized 72 straight pipe 73 elbow pipe 74 reducingnipple 75 flange 76 standard parts 77 Subtotal 78
79 air fan 80 air lock 81 glass cyclone 82 galvanized elbow pipe 83 straight pipe galvanized 84 air cowl galvanized 85 straight pipe 86 elbow pipe
Spec
POWER
KW
TOTAL SUBTOTAL Remarks Column KW USD 0 Negative pressure 0 0 25 M6 Machine screws and nuts
unit 360
set 2 unit 8 m 50
5.5
11 0 0 11
97 Electric Control Cabinet 98 Polishing Electric Control Cabinet 99 Electric wire and cable 100 Subtotal 101
N:Affiliated Equipment
SET SET SET SET 2 2 2 2 2
102 Iron Chute for conveying material 103 Glass Chute for conveying material 104 air compressor 105 air reservoir and Affiliated 106 Midbin 107 Steel Frame 108 Others Affiliated Equipment 109 Subtotal 110 TOTAL PRICE (WUHAN EXW) 111 Steel operation platform WW-3.00.7
UNIT 10
Notes:
1.Capacity: 8-10tons per hour,around 200tons finished white rice in 24 hours,it will be double 100tpd type. include water polisher,color sorter,packing machine and auto electric contral system. 2.Total Volume of the Equipment: It needs six 40 foot HQ containers. but if need steel operation platform,need to add one 40'HQ container. 3.Installation: We will send 3 engineers and 1 english translator to guide the buyer install all the machines we provided and train your tech staff.It will take 75days,depending on the on-site specific condition. 4.Cost of Installation, Testing Running and Training: We do not charge installation fee, but the BUYER should pay USD75 allowance per day to engineer and pay USD65 for translator per day. 5.Other Occurred Expenses: All the expenses occurred on the engineers we send would be covered by the buyer, such as flight tickets, board, food, and etc. 6.Warranty: one year from date of fulfillment of installation.we will render service for ever after sales. 7.Power Requirements380v,50Hz,3-phase 8.Installing dimensions:32X22X7.0m. 9.Deliver time:50 working days.
Note1200TPD COMPLETE RICE MILLING LINE, This is for your reference only.
Note2200TPD COMPLETE RICE MILLING LINE, This is for your reference only.