Professional Documents
Culture Documents
Welcome Guest
SDN Communit
Home Forum s Wiki Blogs
BPX Communit
Articles eLearning
Universit Alliances
Career Center
SAP EcoHub
Events InnoCentive Idea Place SAP Help Portal
Code Exchange
SAP Solutions
Welcome, Guest
Want to post to the Expert Forums? Reply to this Thread Search Forum Back to Thread List
Replies: 7 - Pages: 1 - Last Post: Oct 16, 2008 1:47 PM Last Post By: Tejas Pujara
Raja
Posts: 1,068 Registered: 10/11/08
MRP run
Posted: Oct 15, 2008 7:52 AM
Reply
Hi PP Experts, Can anybody tell me how do I run MRP for MRP area.Where I have to do setting.
Tejas Pujara
Posts: 1,275 Registered: 10/19/07
Reply
Hi, Preparing for Material Requirements Planning with MRP Areas Implementation Options This process describes which master data you must maintain in order to be able to carry out material requirements planning at MRP area level. Process Flow 1.Convert Planning File Entries (Customi ing) You convert the existing planning file entries at plant level to planning file entries at MRP area level. To convert the planning file entries, you use the report that you trigger in Customizing for MRP in the IMG activity Convert planning file entries for MRP areas. The system creates a new planning file and MRP areas for the existing plants. These MRP areas, however, do not affect how material requirements are planned. The number of the plant MRP area is identical to the plant number and therefore has four digits. You cannot create plant MRP areas manually. The plant MRP areas are only created automatically by the conversion report (see Converting the Planning File Entries). 2.Activate MRP (Customi ing) In the IMG activity Activate MRP for MRP areas, set the MRP area active indicator. This activates material requirements planning with MRP areas at client level. The MRP area field appears for selection in the MRP applications. Material requirements planning with MRP areas cannot be reversed. 3.Create MRP Areas (Customi ing) In the IMG activity Define MRP areas, you create the MRP areas for every plant, for which you would like to carry out material requirements planning separately. When creating an MRP area, enter: Number of the MRP area. The number must have at least five digits, so that there is no overlapping with the plant MRP area. Description of the MRP area. MRP area type Receiving storage location (must belong to the MRP area) Finally, you assign the storage locations or the subcontractors to the MRP areas. There are three different types of MRP area:
forums.sdn.sap.com/thread.jspa?messageID=6358964#6358964
T pe 01 for Plant
1/3
12/20/11
MRP
MRP
.Y MRP .
MRP
MRP A
MRP S
MRP
MRP ).
.I
.Y
, MRP
MRP , MRP .T M , C
.C
MRP
MRP
H R T ,
A
P R
A
: 102 : 9/16/08
: 196
H, .
:// . . . / . ? ID=1006030& =0
M R A ,
RB
P R : 8,812 : 4/6/08
: 27,070
D F P
, MRP ,
:// . 123. / . ? =57
.A
MRP
MRP
R R.B
D
P : 2,714
forums.sdn.sap.com/thread.jspa?messageID=6358964#6358964
2/3
12/20/11
Po : 2,714 Regi e ed: 2/9/08
Fo m Poin : 6,388
Rega d , Dha al
Dha ma
Po : 1,670 Regi e ed: 5/7/07
Repl
Fo m Poin : 3,760
Hi, Yo can c ea e MRP a ea fo 1. A plan 2. S loca ion 3. S bcon ac o U e code OMIZ o c ea e MRP a ea. A ign hi MRP a ea in cope of planning b MRP a ea le el.In ma e ial ma e a ign MRP a ea in MRP1 ie . When o Rega d , Dha ma n MRP fo MRP a ea code OM0E. Befo e n MRP ac i a e MRP a
ing.
Raja
Po : 1,068 Regi e ed: 10/11/08
Repl
Fo m Poin : 516
Thank
o all.
Teja P ja a
Po : 1,275 Regi e ed: 10/19/07
Repl
Fo m Poin : 3,318
Rega d , Teja
Page : 1
Back o Th ead Li
Powered b Jive Software Con ac U Si e Inde Ma ke ing Oppo Po e ed b SAP NetWeaver ni ie Legal Te m P i ac Imp e m
forums.sdn.sap.com/thread.jspa?messageID=6358964#6358964
3/3