SAP Community Network Forums Thread: MRP run

SAP Solutions

ERP Manufacturing (PP)

This question is answered.

Welcome, Guest
Want to post to the Expert Forums? Reply to this Thread Search Forum Back to Thread List

Replies: 7 - Pages: 1 - Last Post: Oct 16, 2008 1:47 PM Last Post By: Tejas Pujara
Raja
Posts: 1,068 Registered: 10/11/08

MRP run
Posted: Oct 15, 2008 7:52 AM

Reply

Forum Points: 516

Hi PP Experts, Can anybody tell me how do I run MRP for MRP area.Where I have to do setting.

Tejas Pujara
Posts: 1,275 Registered: 10/19/07

Re: MRP run


Posted: Oct 15, 2008 8:00 AM in response to: Raja

Reply

Forum Points: 3,318

Hi, Preparing for Material Requirements Planning with MRP Areas Implementation Options This process describes which master data you must maintain in order to be able to carry out material requirements planning at MRP area level. Process Flow 1.Convert Planning File Entries (Customi ing) You convert the existing planning file entries at plant level to planning file entries at MRP area level. To convert the planning file entries, you use the report that you trigger in Customizing for MRP in the IMG activity Convert planning file entries for MRP areas. The system creates a new planning file and MRP areas for the existing plants. These MRP areas, however, do not affect how material requirements are planned. The number of the plant MRP area is identical to the plant number and therefore has four digits. You cannot create plant MRP areas manually. The plant MRP areas are only created automatically by the conversion report (see Converting the Planning File Entries). 2.Activate MRP (Customi ing) In the IMG activity Activate MRP for MRP areas, set the MRP area active indicator. This activates material requirements planning with MRP areas at client level. The MRP area field appears for selection in the MRP applications. Material requirements planning with MRP areas cannot be reversed. 3.Create MRP Areas (Customi ing) In the IMG activity Define MRP areas, you create the MRP areas for every plant, for which you would like to carry out material requirements planning separately. When creating an MRP area, enter: Number of the MRP area. The number must have at least five digits, so that there is no overlapping with the plant MRP area. Description of the MRP area. MRP area type Receiving storage location (must belong to the MRP area) Finally, you assign the storage locations or the subcontractors to the MRP areas. There are three different types of MRP area:

forums.sdn.sap.com/thread.jspa?messageID=6358964#6358964

T pe 01 for Plant

1/3

12/20/11

T pe 01 for Plant T MRP

SAP Communit Network Forums: MRP run ...


.T MRP . , , . MRP MRP

MRP

T pe 02 for Storage Locations Y MRP MRP . .A

T pe 03 for Subcontractors Y .Y 4.Assign MRP Areas to Materials Y MRP MRP


MRP , .I

MRP

.Y MRP .

MRP

MRP A

MRP S
MRP

MRP ).
.I

.Y

MRP MRP Y MRP

MRP MRP IMG D .

, MRP

MRP , MRP .T M , C

, MRP MRP MRP .

.C

MRP

5.Check Storage Locations I BOM (BOM ), MRP ( ) . .Y .T MRP , MRP MRP .Y ,

MRP

H R T ,

A
P R

A
: 102 : 9/16/08

Re: MRP run


P :O 15, 2008 8:02 AM :R

: 196

H, .
:// . . . / . ? ID=1006030& =0

M R A ,

RB
P R : 8,812 : 4/6/08

Re: MRP run


P :O 15, 2008 8:06 AM :R

: 27,070

D F P

, MRP ,
:// . 123. / . ? =57

.A

MRP

MRP

R R.B

D
P : 2,714

Re: MRP run


P :O 15, 2008 8:06 AM :R

forums.sdn.sap.com/thread.jspa?messageID=6358964#6358964

2/3

12/20/11
Po : 2,714 Regi e ed: 2/9/08

SAP Communit Network Forums: MRP run ...


Hi, Refe Belo link - MRP fo MRP A ea,
Link 1 MRP fo MRP A ea

Fo m Poin : 6,388

Rega d , Dha al

Dha ma
Po : 1,670 Regi e ed: 5/7/07

Re: MRP run


Po ed: Oc 15, 2008 8:18 AM in e pon e o: Raja

Repl

Fo m Poin : 3,760

Hi, Yo can c ea e MRP a ea fo 1. A plan 2. S loca ion 3. S bcon ac o U e code OMIZ o c ea e MRP a ea. A ign hi MRP a ea in cope of planning b MRP a ea le el.In ma e ial ma e a ign MRP a ea in MRP1 ie . When o Rega d , Dha ma n MRP fo MRP a ea code OM0E. Befo e n MRP ac i a e MRP a

e code MD01. In hi make ick ma k in pa ellel p oce

ing.

Raja
Po : 1,068 Regi e ed: 10/11/08

Re: MRP run


Po ed: Oc 15, 2008 8:45 AM in e pon e o: Dha ma

Repl

Fo m Poin : 516

Thank

o all.

Teja P ja a
Po : 1,275 Regi e ed: 10/19/07

Re: MRP run


Po ed: Oc 16, 2008 1:47 PM in e pon e o: Raja

Repl

Fo m Poin : 3,318

Hi, Wh onl Don' o hank hink o o all!! ho ld e hink abo o e a ding a eg ??

Rega d , Teja

Page : 1