Checklist

Visually check at verticality of columns, straightness of rows of columns Look at base of columns do they have padding plates. Do they pre assemble in panel then erect or erect piece by piece Look at quality of work done. Structure member do they clean before erection Visually looking at it the columns should be vertical and is straight rows. If there are plates underneath the elevation is set. Pre assemble in panel on ground will be easy and faster. Cleaning at height will be a problem, therefore should clean before erection If there are shims alignment is done correctly All alignment instrument has to be calibrated. None calibrated tools will not have a correct reading, does the alignment will not be correct. A lot of lifting gear needed, any shortage will delay the work Condition of gears are also important any damage of the gear during will cause delay and casualty. If they have plentiful, they might also have plenty for the next job which can speed up the job. Hand tools should be plentiful, cos working at many area. Bad or damage tools will only cause further damages then the delay

Structure Work

Does it have shims plate underneath the motors. Installation Pumps, May be can ask to look at some of the alignment tools Motors and like dial gauge for coupling alignment. Are they calibrated Gearbox There will be a lot of lifting work, Ask to look at their lifting gears, like sling wire, lifting belt or webbing belt, Shackles chain block, look at it's condition and quantity they should have plenty

Lifting Gears

Tools and instrument

Do they have enough. especially hand tools. Like spanners various sizes cutting torch, hand grinder, portable welding sets and others Also look at condition of tools and equipment Other heavy equipment do they have enough like Crane, trailer, light truck, forklift and pick-up truck.

Transportation facilities

Other heavy equipment do they have enough like Crane, trailer, light truck, forklift and pick-up truck.

Shortage of trucks and crane can and will delay delivery of material to site

Manpower

Observe the work they are performing Are the workers competent. How efficiency are they Are there enough supervision, like lifting and erection work Maybe can ask them how long have their staffs, supervisor and engineer have been working with the company. Are the workers communicating well with the foreman or supervisor Do they have proper signalman during lifting Numbers of manpower Have a look at the warehouse and storage area. Are the material store properly. Can the material easily located Do they use subcontractor

Good performance can have good quality Competent is vital for good performance Good efficiency can and will speed up the job Adequate supervision will help the job goes smoothly If the staff has been working long with the company they should be loyal and work honestly for the company Communicating well with the fore or supervisor will also speed up the job Giving wrong signal will confuse the crane operator

Warehouse and storage area

If material can be easily located it can be shift to site faster thus not delaying the erection work.

Sub contractor's worker might not follow instruction given to them which

Subcontractor 8

Subcontractor 8 How is their site housekeeping at their working area and warehouse. 9 Housekeeping How and when do they do an inspection on a completed job. What kind of reports do they have. How do you align the structure What is the tolerance? How many mm/m? Inspection test and How do you set the levelling of the structure? report How do you support the base plate of the structure?
How do you fix the condition in case bolts cannot be inserted into

might cause unnecessarily mistake and delay Good housekeeping is a safe place which will enable the job to process smoothly All completed jobs must have inspection and reports

10

hole during structure installation

1 2 3 4 5 6 7 8 9 10 11 12 13 14

What was the year your company was founded? What is the capital of your company currently? What is the manpower strength? Direct employ or through middle man? What are the equipment resources you currently have? What International Code & Standards your company has ever practised? What is the largest capacity of your previous contract? What project are you currently doing? What is the capacity of this current project? When will be the project completed? What would be the capacity you can do for this project? Do you separate the manpower into few team? Do you subcontract the works? May I know who are them? How many tonnes can you install in a month? Do you have anything to say to support your company?

straight rows.

an before erection

ated tools will

gear during will

the delay

f material to site

should be loyal

peed up the job

r thus not

n to them which

ob to process

EVALUATION S/No 1 2 3 4 5 6 7 8 9 Manpower Job performance Tools and Equipment Transportation facilities Material Storage Communication between workers and staff
Housekeeping Sub Contractor Documentation

DESCRIPTION

GOOD

AVERAGE

POOR

REMARK