PROJECT CONTRACT PACK ENGINEER MAIN CONTRACTOR ENGINEER'S REP DURRAT AL BAHRAIN RESORT PROJECT 2063 - ATOLL 3 & 4 VILLAS KMC - BLL JOINT VENTURE G.P ZACHARIADES (OVERSEAS) LTD. WS ATKINS & PARTNERS OVERSEAS
ATOLL - 3
ITEMS PLUMBING SNAGS YES NO
GP
VILLA NO - 20
SNAG ATTEND
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Provide Float Switch of approved make & Cabling for the same shall be properly secured. Fix door stoppers in bathrooms prior to inspection Clean area below ledge cover Clean all W/C's prior to inspection Pool house not complete Manhole frames are rusted MH - 3 shall be of double seal type Wash basin not installed in maids room Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet. Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valve & level switch for the same (usable capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref. Y54 Identification - Mechanical)
yes yes yes yes yes no yes yes yes yes yes yes
TIME :
Signature :- _____________________________
WS ATKINS
CONFIRM BY
Prepared By :- Jen Jacob
GP
RK
GP
VILLA NO - 137
SNAG ATTEND
1 2 3 4 5 6 7 8 9 10 11
Provide Float Switch of approved make & Cabling for the same shall be properly secured. Clean area below ledge cover. Clean all W/C's prior to inspection Manhole cover and frames are rusted . Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. F/F pantry sink not installed. Maid's / Driver's Room wash basin not installed. Floor Drain covers not installed. Provide Commissioning report giving details of pressure & flow measured at each fixture outlet. Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valve & level switch for the same (usable capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref. Y54 Identification - Mechanical)
12
13 14 15 16 17 18 19 20
TIME :
Signature :- _____________________________
WS ATKINS
CONFIRM BY
GP
VILLA NO - 136
SNAG ATTEND
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Provide Float Switch of approved make & Cabling for the same shall be properly secured. Clean area below ledge cover. Clean all W/C's prior to inspection. Pool house not complete Manhole frames are rusted. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. F/F pantry sink leaking Maid's / Driver's Room wash basin not installed. Floor Drain covers not installed. Access plug for drainage pipes missing in G/F majlis shaft. Provide Commissioning report giving details of pressure & flow measured at each fixture outlet. Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valve & level switch for the same (usable capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref. Y54 Identification - Mechanical)
yes yes yes yes yes yes yes yes yes yes yes no
TIME :
Signature :- _____________________________
WS ATKINS
CONFIRM BY
GP
HARIADE AS ) LTD.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Provide Float Switch of approved make & Cabling for the same shall be properly secured. Clean area below ledge cover. Clean all W/C's prior to inspection. Courtyard manholes shall be double seal type. Pool house not complete. Fix door stoppers in bathrooms prior to inspection. Manhole frames are rusted. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
20
SNAG COMPLETION DATE :
VILLA NO - 140
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Pool house not complete. Provide Float Switch of approved make & Cabling for the same shall be properly secured. Maid's Room & Driver's toilet wash basin not installed. Identification in shaft not done. Washing machine drain is not capped Clean area below ledge cover. Drain plugs for wash basin & bidet not sealing . Clean all W/C's prior to inspection. WC flow in GF inadequate, manholes filled with water. Clean manifolds, & fill gaps. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Incorrect location of angle valve & drain in Master bath wash basin. Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
VILLA NO - 144
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
s basin.
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Leak in maid's room toilet wash basin sink drain. Floor trap not installed in Kitchen -2. Manhole benching is not done properly Provide Float Switch of approved make & Cabling for the same shall be properly secured. Clean area below ledge cover. Fix door stoppers in bathrooms prior to inspection. Clean all W/C's prior to inspection. Court yard manhole shall be double seal type Pool house works not complete. Manhole frames are rusted. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
VILLA NO - 110
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Pool house not complete. Provide Float Switch of approved make & Cabling for the same shall be properly secured. Fix door stoppers in bathrooms prior to inspection. Clean area below ledge cover. Benching damaged in MH-3 Clean all W/C's prior to inspection. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
VILLA NO - 106
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Pool house not complete. Provide Float Switch of approved make & Cabling for the same shall be properly secured. Fix door stoppers in bathrooms prior to inspection. Clean area below ledge cover. Clean all W/C's prior to inspection. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
VILLA NO - 105
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Pool house not complete. Provide Float Switch of approved make & Cabling for the same shall be properly secured. Fix door stoppers in bathrooms prior to inspection. Clean area below ledge cover. Clean all W/C's prior to inspection. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
VILLA NO - 65
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Provide Float Switch of approved make & Cabling for the same shall be properly secured. Clean area below ledge cover. Fix door stoppers in bathrooms prior to inspection. Clean all W/C's prior to inspection. Courtyard manholes shall be double seal type. Pool house works not complete. Manhole frames are rusted. Clean manifolds, & fill gaps & paint. Mains water supply connection not complete. Angle valves not fixed properly and are sloped in many areas Provide Commissioning report giving details of pressure & flow measured at each fixture outlet.
Maximum water storage height inside the roof tank shall be not less than 56 cm,Optimize float valv capacity shall be greater than 2.1M) Provide identification with directional arrows on switches, all equipment & piping as specified (Ref.
VILLA NO - 62
SNAG ATTEND
PLUMBING SNAGS YES yes yes yes yes yes no yes yes yes yes yes yes NO
not less than 56 cm,Optimize float valve & level switch for the same (usable
TIME :
Signature :- ____________
WS ATKINS
CONFIRM BY
GP
IME :
Signature :- _____________________________
WS ATKINS
ONFIRM BY