You are on page 1of 4

Ministry of Information Technology Government of Pakistan

National Grassroots ICT Research Initiative


Final Year Project (FYP) Recommendation Form University/Institute Detail: Name of University/Institution Telephone & Fax No: City: Recommended Project Details:Project Supervisor Name and Designation: Project Supervisor Qualification: Contact Details: No of Publications of Supervisors: 1._____________________ 2.______________________ Students 3.______________________ Mobile No: 4._______________________ 1._______________________ 2._______________________ 3._______________________ 4._______________________ Students Email: 1.________________ 2._________________ 3._________________ 4._________________ 1.________________ 2.________________ 3.________________ 4.________________ Email: Cell No Off No: Physical Address: Discipline: Province:

Students Name(s):

Students CGPA

Degree Programme/ Title:

Area of Specialization:

Ministry of Information Technology Government of Pakistan

Final Year Project Details: A. B. C. D. Project Title: Project Start Date: Project Finish Date: Project Summary (less than 200 words)

The proposed system will be a web-based traffic updating system to be developed for City Traffic Police Department Faisalabad. It will base on Geographic Information System (GIS). It will help to visualize the updated road traffic map which describes the blocked roads as well as open roads via web application. It will also track down the alternate route against the jammed road. It will get rid of complex traffic blockage caused by the situation that the vehicles continually becoming the part of jam because the drivers dont know the road is jam ahead. Proposed system has an attractive graphical user interface that will facilitate the user to interact with the system. This system will have Geoserver at backend with Oracle Spatial (11g) as database and Java script and frontend GUI will be designed in HTML5.

E. Project Objectives: Provide Traffic plans to user via web site. Blocked roads identification. Provide alternate routes against blocked roads.

F. Project Implementation Method

Ministry of Information Technology Government of Pakistan

G. Key Milestones of the Project with dates

S.No 1. 2. 3. 4. 5.

Elapsed time since start of the project

Milestone

Deliverable

Please add rows if required H. Final Deliverable of the Project:


Hardware System Software Simulation results

(Please tick one of the following)


HW/SW integrated system Theoretical Design/Architecture

Software System Comparative Study

Simulator DesignOther Please specify I. Please Specify Technical Detail of Final Deliverable
1 Deliverable: (47 days)
Feasibility Planning Requirement Analysis Documents submission nd 2 Deliverable: (19 days) Usecase, Sequence, Class & ER Diagrams Documents submission ST 1 Deliverable: (22 days) Database Development Web Development Testing and Finalizing Documents submission 8 days 21 days 14 days 4 days 16 days 3 days 4 days 9 days 5 days 4 days From From From From 2/04/2012 To 9/04/2012 9/04/2012 To 30/04/2012 30/04/2012 To 14/05/2012 14/05/2012 To 18/05/2012
ST

From 18/05/2012 To 2/06/2012 From 2/06/2012 To 5/06/2012 From From From From 5/06/2012 To 9/06/2012 9/06/2012 To 18/06/2012 18/06/2012 To 23/06/2012 23/06/2012 To 25/06/2012

J. Equipment required for making prototype/working model:


a. b. c. d. e. f. g. h. 16*4 GB DDR III RAM. 4GB I/O card. 1TB Hard Disk Drive. Super drive DVD room 21 LCD Standard Mouse and Keyboard Internet connection One GPS reciver

(please indicate in tabular form the required equipments along with estimated cost)

Ministry of Information Technology Government of Pakistan

K. Benefits of the Project


(Please specify Direct/Indirect beneficiaries)

With the help of the information of the areas where traffic is jam, an easy, quick and comfortable road travelling is made possilbe For the assistance of anyone on the internet, the availability of such a map which is identifying all the jam road. If a person has selected a specific path to go somewhere and in the meantime traffic is jam on the road then sending an alert to change the path.

1. Name & Signature of Supervisor: ______________________________________

2. Name & Signatures of HOD:

You might also like