You are on page 1of 7

Page 1 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10803001 10803002 10803005 10803009 10803010 10803012 10803014 10803018 10803020 10803021 10803025 10803026 10803029 10803030 10803033 10803034 10803035 10803042 10803044 10803046 10803047 10803048 10803049 10803058 10803061 10803065 10803066 10803067 10803068 10803069 10803070 Abhinav Modi Raghav Kaushal Peush Garg Inderjeet Singh Jotpal Singh Cheema Ravish Goyal Manarshhjot Singh Varun Garg Nitesh Goyal Piyush Gaganpreet Singh Hundal Guneet Jain Anubhav Goyal Avtar Singh Amandeep Singh Dikshant Sachdeva Rajat Goyal Ishwinder Singh Pardeep

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2008-423 UCE (P) 2008-424 UCE (P) 2008-355 UCE (P) 2008-356 UCE (P) 2008-425 UCE (P) 2008-426 UCE (P) 2008-357 UCE (P) 2008-428 UCE (P) 2008-358 UCE (P) 2008-430 UCE (P) 2008-432 UCE (P) 2008-359 UCE (P) 2008-433 UCE (P) 2008-360 UCE (P) 2008-361 UCE (P) 2008-434 UCE (P) 2008-435 UCE (P) 2008-436 UCE (P) 2008-362 Implementation of 5-S management system, VSM & learning of PMS (1) To reduce The Pre dispatch Inspection problem (2) To Reduce the tightning problem Of M14 studs (3) To minimize the cylinder head rejection Study of Electricity Generation Process Blanking Plates Design & Installation for an Aircraft static Test Quality control at cabin line Bottle Line Efficiency Increase To increase the working efficiency of the Incinerator. Drawing cooling curves and studying casting defects, further reduction/controlling of chill blow holes and decreasing defect from 3.15% to 0.2% Study of Electricity Generation Process Design and Analysis of shock Absorber used in Automobiles. To Study different Types of Tooling Fixtures Oil immersed brakes Study of Fundamentals of Refinery and Polypropylene Unit along with case study of Hot Oil Unit Study of Functioning of Plants Study of Fundamentals of Refinery and Polypropylene Unit along with case study of Hot Oil Unit Design and Productivity improvement Blanking Plates Design & Installation for an Aircraft static Test To study the existing manufacturing process of U bolt and Wheel Nut and find out the problems encountered (1) Design a tool to disassemble the drive shaft from 540 rpm PTO Gear Box (2) Design a rack for placing rock shaft bush in Rear Cover assembly (1) To reduce the PDI problem at the pre-dispatch area. (2) To overcome assembling problems of cylinder block on crankcase due M14 Stud. To study the existing manufacturing process of U bolt and Wheel Nut and find out the problems encountered Repairing Non-conformance in Air craft Wing Manufacturing Design and Productivity improvement Generic Component Creator Study the failure of head gasket Performance Optimization of 600 CC naturaly aspirated Desiel Engine with Common Rail System Blanking Plates Design & Installation for an Aircraft static Test Faliure Analysis of Honeycomb Sandvich Panel for Aerospace To reudce the damaging of oil seal in trumpet housing Faliure Analysis of Honeycomb Sandvich Panel for Aerospace Quality assurance and assembly line inspection of combines

Grades A A B+ A A B+ A B+ B+ A B+ B A B A B+ B+ A B+ A B+ A A B+ B+ A B+ B+ B+ B+ B+

Sepaldeep Singh Dhaliwal UCE (P) 2008-437 Balraj Singh Gill Vishant Kumar Sukhkirat Singh Bhullar Gagan Kumar Harmanpreet Singh Harpreet Singh Bharat Bhushan Singla Harmandeep Singh Vipul Jain Hardeep Singh Kamaldeep Sood UCE (P) 2008-438 UCE (P) 2008-363 UCE (P) 2008-439 UCE (P) 2008-364 UCE (P) 2008-365 UCE (P) 2008-366 UCE (P) 2008-440 UCE (P) 2008-367 UCE (P) 2008-441 UCE (P) 2008-442 UCE (P) 2008-443

Incharge ME

Course Instructor/Committee

Page 2 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 10803071 10803072 10803073 10803074 10803075 10803077 10803078 10803080 10803081 10803082 10803083 10803084 10803086 10803087 10803088 10803089 10803090 10803092 10803093 10803094 10803095 10803096 10803099 10803100 10803101 10803102 10803104 10803105 10803106 60 Dupinderpal Singh Gill Mandeep Singh Ramanpreet Singh Bhatia Onkar Singh Ranjeet Singh Rahul Thakur Amit Garg Mehak Garg Jasleen Kaur Sukhchain Singh

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2008-444 UCE (P) 2008-368 UCE (P) 2008-445 UCE (P) 2008-446 UCE (P) 2008-447 UCE (P) 2008-448 UCE (P) 2008-369 UCE (P) 2008-517 UCE (P) 2008-518 UCE (P) 2008-449 To Study different Types of Tooling Fixtures Faliure Analysis of Honeycomb Sandvich Panel for Aerospace Repairing Non-conformance in Air craft Wing Manufacturing Implementation of quality at vendor end Detailed Study of NFL, Bathinda Unit Opto Mechanical Couplings (1) To reduce pre dispatch inspection problems at pre dispatch area (2) To remove problem of M14 Stud tightening (3)To minimize rejection of cylinder head in line (4) To prevent mixing up of RB33 and RB 30 mixing up at machine Design and Analysis of Equivalent Composite leaf springs Design and Analysis of Equivalent Composite leaf springs. Design and Analysis of Equivalent Composite leaf springs (1) Implemetation of ISO 9001-2008 (2) Complete Analysis of Pressue Cap (3) Development of COW BOX using Time Study, Scheduling & Cost Control Tools. (4) Development of Car Chair Control of Scrap Reduction To reudce the damaging of oil seal in trumpet housing Guidelines and heat treatment Problems of line rejection of cylinder head and fitness of M14 stud in crankcase Axle Shop and Engine Shop Repairing Non-conformance in Air craft Wing Manufacturing Increasing production by reducing defects in cargo box assembly area department (production department) Assembly division line Engine Cut off by breaking of fan belt. Prevention of Heat Loss in Soda Recovery and increase in the efficiency of electrostatic precipitator (recovery 1) Pumps and Compressors To reduce the Cost and Save Time in Construction of Model Plates and Distance eye piece Rejection Rate Reduction in 90PS/75PS Pistons (1) Total Productive Maintenance (2) To reduce the line rejection of cylinder head Guidelines and heat treatment Problems of line rejection of cylinder head (1) To improve the efficiency of an incinerator (2) To find the problem in export packing (1)To improve engine performance with turbocharger (2) Calculations of performance parameters of engines during engine testing (3) To change the design of seal and side cover of engine (4)To change the size of tappet (5) To reduce the rejection in paint shop

Grades B+ B+ B B B A A B+ B A A B B+ B+ B B+ B A B B+ A B B+ B+ B B+ B B+

Simrandeep Singh Oberoi UCE (P) 2008-450 Raminder Dhiman Aditya Jain Karanbir Singh Sharanjit Singh Navtej Singh Gurpeeet Singh Prince Setia Gurpreet Singh Gursharan Singh Jashan Sharma Sachin Kumar Badhan Abhinandhan Jashanpreet Singh Kriti Mahey Navdeep Singh Sukhkarnvir Singh Jai Singh Shavinder Singh UCE (P) 2008-451 UCE (P) 2008-370 UCE (P) 2008-371 UCE (P) 2008-452 UCE (P) 2008-372 UCE (P) 2008-373 UCE (P) 2008-454 UCE (P) 2008-527 UCE (P) 2008-528 UCE (P) 2008-455 UCE (P) 2008-456 UCE (P) 2008-374 UCE (P) 2008-375 UCE (P) 2008-457 UCE (P) 2008-376 UCE (P) 2008-377 UCE (P) 2008-378 UCE (P) 2008-379

B+

Incharge ME

Course Instructor/Committee

Page 3 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
10803107 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 10803108 10803109 10803110 10803111 10803112 10803116 10803117 10803119 10803121 10803122 10803123 10803124 10803125 10803127 10803128 10803129 10803130 10803131 10803135 10803136 10803137 10803138 10803139 10803140 10803141 10803142 10803143 10803145 10803146 10803147 10803149 10803150 Gurvinder Singh Jitin Grover Chamanjeet Singh Ankit Rana Jaspreet Singh Varinder Singh Ajay Gupta Ravi Kumar Karan Kuldeep Singh Jatin Goel Navpreet Singh Anurag Sharma Gagandeep Sharma Pavittar Singh Vikram Rajat Harish Kumar Harpreet Singh Gurpreet Singh Jaskarnjit Singh Malli Vinay Pillai Gurjeet Singh Prateek Saneja Harmeet Singh Munish Kumar Kulwinder Singh Siddharth Bhati Tushar Bansal Ashish Arora Abhishek Garg Pravas Ashutosh Bansal Vishal Garg

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2008-380 UCE (P) 2008-381 UCE (P) 2008-382 UCE (P) 2008-383 UCE (P) 2008-384 UCE (P) 2008-385 UCE (P) 2008-458 UCE (P) 2008-386 UCE (P) 2008-459 UCE (P) 2008-388 UCE (P) 2008-389 UCE (P) 2008-460 UCE (P) 2008-461 UCE (P) 2008-390 UCE (P) 2008-391 UCE (P) 2008-462 UCE (P) 2008-392 UCE (P) 2008-463 UCE (P) 2008-464 UCE (P) 2008-466 UCE (P) 2008-467 UCE (P) 2008-393 UCE (P) 2008-468 UCE (P) 2008-394 UCE (P) 2008-469 UCE (P) 2008-395 UCE (P) 2008-396 UCE (P) 2008-470 UCE (P) 2008-397 UCE (P) 2008-471 UCE (P) 2008-472 UCE (P) 2008-398 UCE (P) 2008-399 (1) To improve engine performance with turbocharger (2) Calculations of performance parameters of engines during engine testing (3) To change the design of seal and side cover of engine (4) To change the size of tappet (5) To reduce the rejection in paint shop To study the swelling of rings NVH reduction and Cost Reduction To study the swelling of rings To study the swelling of rings Manufacturing of Chill Rolls Design of Mounting Brackets for ECS System To improve cleaning of Bull Pinion Shaft Left Improvisation of Masking Design of Mounting Brackets for ECS System To Study Existing Manufaturing Process of shackle bolt and spring pin Generic Component Creator Gas Dehydration Unit Green Toilets Design of Mounting Brackets for ECS System Study and Development of Model Plate Quality Product and Cost Reduction in Railway equipment Development of BS3 to BS4 of SML Engine Development of BS3 to BS4 of SML Engine Goods reciept rejection Quality Improvement Main Assembly Line Removing problem of Fuel tank and Dry Mechanical brake Scrap Reduction Increase the production rate of H400 hobbing machine Losses in Heat Treatment Process (SQF) To Study Existing Manufaturing Process of King Pin and Spring Pin out the Problems Encoutered Removing problem of Fuel tank and Dry Mechanical brake Study on Turbine blade manufacturing at BHEL (1) Statictical Process Control (SPC) and (2) Scrap Reduction Faliure Analysis of Honeycomb Sandvich Panel for Aerospace. Development of parts under MDL Project. Manufacturing and Repairing of Moulds for Electrical Appliances Study of Electricity Generation Process

Grades

B B B B B B+ A B A B+ B B+ B+ A A B+ B B+ B+ B+ B+ B A B+ A B B B+ B+ B+ B+ B+ B

Incharge ME

Course Instructor/Committee

Page 4 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 10803151 10803152 10803153 10803155 10803156 10803158 10803159 10803160 10803161 10803162 10803163 10803164 10803165 10803166 10803168 10803169 10803170 10803172 10803173 10803175 10803177 10803179 10803180 10803181 10803183 10803184 10803185 10803186 10803188 10803189 10803190 10803191 Inderpreet Singh Gurwinderpal Singh Amandeep Mangotra Shiv Kumar Hardeep Singh Navjot Singh Bhullar Mayank Sharma Bikramjeet Singh Uppal Manuj Sharma Sanyam Abhilashi Tayal Rohit Dhiman Amandeep Singh Angad Singh Brar Sachin Singh Mittal Amandeep Singh Ankur Baweja Chihandeep Singh Abhinav Mahajan Nishant Swami Akshay Kumar Harcharan Singh Ashish Kumar Arora Sugam Thakur Kapil Babbar Ishan Ahuja Naveen Kumar Pushpinder Singh Karan Singh Ahluwalia Yashwinder Singh George Paras Dhir Abhinav Kohli

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2008-473 UCE (P) 2008-474 UCE (P) 2008-400 UCE (P) 2008-401 UCE (P) 2008-402 UCE (P) 2008-475 UCE (P) 2008-476 UCE (P) 2008-477 UCE (P) 2008-403 UCE (P) 2008-478 UCE (P) 2008-525 UCE (P) 2008-404 UCE (P) 2008-479 UCE (P) 2008-480 UCE (P) 2008-405 UCE (P) 2008-481 UCE (P) 2008-482 UCE (P) 2008-483 UCE (P) 2008-523 UCE (P) 2008-406 UCE (P) 2008-484 UCE (P) 2008-526 UCE (P) 2008-485 UCE (P) 2008-524 UCE (P) 2008-486 UCE (P) 2008-487 UCE (P) 2008-488 UCE (P) 2008-516 UCE (P) 2008-407 UCE (P) 2008-408 UCE (P) 2008-409 UCE (P) 2008-490 Track the daily Consumption and Record of Materials Dry mechanical brake conversion into oil immersed brake Development of existing design and production increment Ammonia Vapour Absorption Machine 70 TR Air Filter and Oil Immersed brake Design development, fabrication and performance evaluation of liquid nitrogen system to achieve steep temperature gradient inside the chamber Design and Analysis of shock Absorber used in Automobiles. Design development, fabrication and performance evaluation of liquid nitrogen system to achieve steep temperature gradient inside the chamber Design and Analysis of Equivalent Composite leaf springs. Implementation of 6-Sigma Methodology Reduction of Production Time delay due to various Breakdowns To study loco cranking and load test, to study load test of engine, to change 3100 HP into 3300 HP Study and Maintainance of the Machines used in Construction Project Manufacturing process of Radiators, Intercoolers, FDM and quality assurance To Perform Machining Operation on New Connecting Rod of a Tractor Implementation of Environmental Regulation (1) Clutch and its defects (2) Product quality Index (3) Speedo oil seal leakage & comparison of similar parts Quality Control of Piston using Talyrond and Cordinate measuring machine Performance Optimization of 600 CC naturaly aspirated Desiel Engine with Common Rail System Distortion control and correction Explosive welding of thick metallic plates Prototype building & testing of 300 BHP, 12 meter, rear engine bus chassis To Reduce Half cycle from 33 numbers per day to 10 numbers per day Study of Tractor Engine assembly Prototype Building of Gear Shifters for DAIMLER HDT (Heavy Duty Trucks) Reduction in time losses & implementation of Kaizen Quality Control In Engine Shop & Vechicle Assembly Line Part Design and Maintainence, FCC RECHO project To implement power steering on the tractor to make the steering simpler and easier Scrap reduction at honing operation in ring machine shop(federal mougal) (1) To study and rectify the main problems in pneumatic gun (2) Changing of faulty parts in DMRC body fabricated buses Quality Control of Piston using Talyrond and Cordinate measuring machine

Grades A B+ B+ B B+ B+ A B+ A B B B B B B B+ A B A B+ B+ A A B+ A A A B B B+ B B

Incharge ME

Course Instructor/Committee

Page 5 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 10803192 10803193 10803194 10803197 10803198 10803199 10803200 10803201 10803202 10803203 10803204 10803205 10803206 10803207 10803208 10803209 10803210 10803211 10803213 10803214 10803215 10803216 10803217 10803218 10803219 10803220 10803221 10803222 10803223 10803224 Manik Singh Hundgenn Nitish Garg Maninderjeet Singh Tegveer Singh Farminder Singh Maninder Singh Ashu Garg Sumeet Jhamba Satpreet Singh Bikramjeet Singh Vaibhav Mahajan Sahil Gupta Anshul Sofat Piyush Verma Harmohinder Singh Nitin Kapahi Sahil Bansal Sahil Kakria Ritesh Kumar Abhishek Garg Nitin Ramsinghaney Akhilesh Garg Ajay Bansal Varun Verma Nitin Thind Fatehbir Singh Dhillon Sourbh Garg Arihant Bansal Meghna Agarwal Dhanpreet Singh

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2008-491 UCE (P) 2008-492 UCE (P) 2008-493 UCE (P) 2008-494 UCE (P) 2008-495 UCE (P) 2008-410 UCE (P) 2008-411 UCE (P) 2008-496 UCE (P) 2008-497 UCE (P) 2008-498 UCE (P) 2008-499 UCE (P) 2008-500 UCE (P) 2008-501 UCE (P) 2008-502 UCE (P) 2008-503 UCE (P) 2008-504 UCE (P) 2008-505 UCE (P) 2008-412 UCE (P) 2008-413 UCE (P) 2008-414 UCE (P) 2008-506 UCE (P) 2008-415 UCE (P) 2008-416 UCE (P) 2008-507 UCE (P) 2008-508 UCE (P) 2008-417 UCE (P) 2008-418 UCE (P) 2008-419 UCE (P) 2008-522 UCE (P) 2008-509 Study of centrifugal pump,selection and procurement process in accordance with API 610 Design, Development, Fabrication and Performance evaluation of Liquid Nitrogen system to achieve Steep Temprature Gradient inside the chamber Study of equipments in Quality Engineering cell Study of Head Gasket failure To Implement power steering on the tractor to make the steering simpler and easier To study loco cranking and load test, to study load test of engine, to change 3100 HP into 3300 HP Blanking Plates Design & Installation for an Aircraft static Test Study of DMRC Production line at SML ISUZU ltd Designing a Ground Source Heat Pump Study and documentation of stage wise manufacturing processes of gear wheel and differential shaft of 3522 tractor model To reduce the rejection in the Moulding Area Implementation of 5S Study and documentation of stage wise manufacturing processes of gear wheel and differential shaft of 3522 tractor model (1) To Reduce bore fail from 5% to 1% (2) Kaizen event to increase the productivity (3) To eliminate blow by problem Mechanical Deptt. of G.H.T.P. To study loco cranking and load test, to study load test of engine, to change 3100 HP into 3300 HP Modifications in the Soot Blower Prediction of Dynamic Behaviour of an All Terrain vehicle (ATV) using ADAMS/CAR Performance Analysis and Time study on Vertical Section CNC machine manufactured by TONGTAI Implementation of 5-S methodology in ithe industry Understanding Details of A BOPP plant , Feeding System and Improving ATLAS Slitter Time. (1) Study of CNC Turning M/C (2) Study of TPM Design of Mounting Brackets for ECS System Inspection and Quality Control of Pistons Global Solution Database (1) To implement power steering on the tractor to make the steering simpler and easier (2) Assembly shop Thermal performance test of boiler Generic Component Creator To Perform Machining Operation on New Connecting Rod of a Tractor Analyzing fuel tank failure and its modification to remove failure (FT and PT tractors) and converstion of 2D to 3D using UG-NX

Grades B+ B+ B+ B B B B+ A B B+ B+ B B+ A B+ A A A B+ B+ B+ B A B+ A A B+ B B+ A

Incharge ME

Course Instructor/Committee

Page 6 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 10803225 10803226 10803227 10803228 10803229 10803230 10803231 10803232 10803233 10903241 10903242 10903243 10903244 10903245 10903246 10903247 10903248 10903249 10903250 10903251 10903252 10903253 10903254 10903256 10903257 10903258 10903259 10903260 10903261 10903262 10903263 10903264 Piyuesh Kalra Maninder Kumar Preetinder Singh Arora Ishvinder Singh Kapil Shukla Shikhar Mathur Rajat Kansal Abhaydeep Singh Mutti Ankush Kumar Abhikrit Goel Maninder Singh Nitin Singh Walia Rohit Pathak Neelmani Sharma Inderpal Singh Sourabh Singla Gaurav Garg Gurpreet Singh Rai Sahib Singh Bhatti Vikrampreet Singh Amandeep Singh Rahul Bansal Amarjeet Singh Amritpal Singh Nitish Bansal Gaurav Babbar Jaskaran Singh Gagandeep Singh Sukhwinder Singh Mandeep Singh Brahmjot Singh Mandeep Singh

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2008-510 UCE (P) 2008-511 UCE (P) 2008-512 UCE (P) 2008-513 UCE (P) 2008-420 UCE (P) 2008-514 UCE (P) 2008-515 UCE (P) 2008-421 UCE (P) 2008-422 UCE (P) 2009-609 UCE (P) 2009-610 UCE (P) 2009-611 UCE (P) 2009-612 UCE (P) 2009-613 UCE (P) 2009-614 UCE (P) 2009-615 UCE (P) 2009-616 UCE (P) 2009-617 UCE (P) 2009-618 UCE (P) 2009-619 UCE (P) 2009-620 UCE (P) 2009-621 UCE (P) 2009-622 UCE (P) 2009-623 UCE (P) 2009-624 UCE (P) 2009-625 UCE (P) 2009-626 UCE (P) 2009-627 UCE (P) 2009-628 UCE (P) 2009-629 UCE (P) 2009-630 UCE (P) 2009-631 Working of Press Shop and reconciliation of parts in Press and Weld Shop Explosive welding of thick metallic plates Complete exterior modification of cabin Quality control at frame line and cabin line (1) Case Study of Engine shop and Engine Transmission (2) Defects and Improvements in Axle Shop (1) Most Analysis of Assembly Shop A (2) Most Analysis of Assembly Shop B To study the defects occurring in BS-4 vehicle, rectifying those defects and productionisation of BS-4 vehicle on main line Maintenance of Hydraulic System in Injection Moulding machine Designing a Tool to Disassemble the Drive Shaft From Gear Box Scrap Reduction and Time Study Center Buffer Coupler Manufacturing of Proto Type Radiator Manufacturing of pneumatic chip collector Improvement in Welding Operations , Study of submerged arc strip cladding process and study of selection of electrodes Study of premature of Diesel Engine & Disc Brake Modifications in the Soot Blower Tractor Mounted Soil Conductivity ECA Mapper. Study of premature of Diesel Engine & Disc Brake Hybrid Bogie Study of premature of Diesel Engine & Disc Brake Study of Electricity Generation Process Generic Component Creator Study of Rejection & Rework of Gear Box Housings. (1) Predictive maintenance based on MTBF & MTTF (2) Productivity Improvement using Why Why Analysis (3) Study of spare parts and hydraulic & pnumatic systems Case Study of Honda Activa body frame and Implementation of 5S Improvement of Direct Run Rate at Transaxle Assembly Shop Problems of line rejection of cylinder head and fitness of M14 stud in crankcase Quality assurance and assembly line inspection of combines Safety Analysis and designing of stairs and ladders Study of premature of Diesel Engine & Disc Brake To study the process flow of piston manufacturing and Scrap reduction Automatic Stoppage of Engine by Breaking of Fan Belt

Grades B+ B+ A A B B+ A B+ B A B B+ A B B A A A B A B B B+ B+ B A A B B+ B+ B B

Incharge ME

Course Instructor/Committee

Page 7 of 7

UNIVERSITY COLLEGE OF ENGINEERING, PUNJABI UNIVERSITY, PATIALA.


Course No.: PRJ 451 Course Title: PROJECT SEMESTER Sr. No. Roll No. Name
188 189 190 191 192 193 194 195 10903266 10903267 10903269 10903270 10903271 10903272 10903273 10903274 Prabhjot Singh Sumeet Tandon Neeraj Sharma Robin Jindal Gaurav Singla Manish Moonglia Yadwinder Singh Gurtej Singh

B. Tech. - IV (Mechanical Engineering) - Batch 2008-12 Session: Jan. - May 2012 PROJECT TITLE(S) Registration No.
UCE (P) 2009-632 UCE (P) 2009-633 UCE (P) 2009-634 UCE (P) 2009-635 UCE (P) 2009-636 UCE (P) 2009-637 UCE (P) 2009-638 UCE (P) 2009-639 Study of premature of Diesel Engine & Disc Brake Online process document generation & implementation in TCF shop using DPE Study of consturction and application of CNC machine Study of IC Engine parameter for achievement of BT-3A norms Implementing Kaizen, 5S and One Point Lesson - A part of Lean Manufacturing in Assembly Shop. Project on ZHONGTONG school bus Conversion of Dry Mechanical Brakes into oil immersed brakes. Study of premature of Diesel Engine & Disc Brake

Grades B A B A A A B B

Incharge ME

Course Instructor/Committee

You might also like