You are on page 1of 11

PROJECT : CLIENT :CLIENT'S CONSULTANT :E-BOP CONTRACTOR :-

1x 63 MW TPP AT KORBA,CHATTISGARH S V POWER PVT LTD DESEIN PVT LTD ABB LTD,FARIDABAD

LIGHTNING PROTECTION CALCULATION FOR TG BLDG.AB-BC BAY ( REFERENCE : IS 2309 ) Symbol / Formulae / Description / Parameter References A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P ( Refer Fig. 1 of IS 2309 ) ( Refer Clause 8.1.2 of ( Refer Table 1A of IS 2309 ) ( Refer Table 1B of IS 2309 ) ( Refer Table 1C of IS 2309 ) ( Refer Table 1D of IS 2309 ) ( Refer Table 1E of IS 2309 ) = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = = = = = = = = = =

Value

Unit

60.00 28.00 23.00

m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) 100 No. of Days / Year 9.2 Nos./km2/year 1 0.8 1 0.4 0.3 7389.06 Meter2 0.067979 Times per year 0.096000 0.006526 6.5260E-03

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year = = AxBxCxDxE Overall Multiplying = Factor x P = = ie

Rf-C

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

1680 Meter2 176 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 6 Nos

= P/30 = 6 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 6 Nos.

REVISION DETAILS

Rev.
R0

Date
12.10.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
HK

Reviewed
KVP

Approved
KVP

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x70 MW TPP AT KORBA,CHATTISGARH RRVUNL DCPL, New Delhi Indure, New Delhi CW PUMP HOUSE Value Unit

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR Symbol / Formulae / References A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure Description / Parameter
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P ( Refer Fig. 1 of IS 2309 ) ( Refer Clause 8.1.2 of ( Refer Table 1A of IS 2309 ) ( Refer Table 1B of IS 2309 ) ( Refer Table 1C of IS 2309 ) ( Refer Table 1D of IS 2309 ) ( Refer Table 1E of IS 2309 ) = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2

= = = = = = = = = = =

43.62 12.20 17.53

m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 3452.79 Meter2 0.017264 Times per year 0.024000 0.000414 4.1434E-04

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year = = AxBxCxDxE Overall Multiplying = Factor x P = = ie

Rf-C

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

532.10 Meter2 111.63 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 2 Nos

= P/30 = 4 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 2 Nos.

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR CW TREATMENT AREA Symbol / Formulae / References A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure Description / Parameter
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P ( Refer Fig. 1 of IS 2309 ) ( Refer Clause 8.1.2 of ( Refer Table 1A of IS 2309 ) ( Refer Table 1B of IS 2309 ) ( Refer Table 1C of IS 2309 ) ( Refer Table 1D of IS 2309 ) ( Refer Table 1E of IS 2309 ) = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = = = = = = = = = =

Value

Unit

40.23 30.23 5.00

m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 1999.25 Meter2 0.009996 Times per year 0.024000 0.000240 2.3991E-04

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year = = AxBxCxDxE Overall Multiplying = Factor x P = = ie

Rf-C

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

1216.15 Meter2 140.92 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 5 Nos

= P/30 = 5 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 5 Nos.

REVISION DETAILS

Rev.
R0

Date

Drg/Doc. No.

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

30.06.2009 3VYN855200

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR RAW WATER PUMP HOUSE Symbol / Formulae / References A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure Description / Parameter
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P ( Refer Fig. 1 of IS 2309 ) ( Refer Clause 8.1.2 of ( Refer Table 1A of IS 2309 ) ( Refer Table 1B of IS 2309 ) ( Refer Table 1C of IS 2309 ) ( Refer Table 1D of IS 2309 ) ( Refer Table 1E of IS 2309 ) = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = = = = = = = = = =

Value

Unit

33.30 8.60 10.70

m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 1542.54 Meter2 0.007713 Times per year 0.024000 0.000185 1.8510E-04

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year = = AxBxCxDxE Overall Multiplying = Factor x P = = ie

Rf-C

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

286.38 Meter2 83.8 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 2 Nos

= P/30 = 3 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 2 Nos.

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi RWPH MCC Room Value Unit

LIGHTNING PROTECTION CALCULATION ( Reference : IS 2309 ) for Description / Parameter Symbol / Formulae / References

A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P = = = 22.80 9.81 5.00 m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) ( Refer Fig. 1 of IS 2309 ) = (Refer Clause 8.1.2 of IS 2309) = ( Refer Table 1A of IS 2309 ) = ( Refer Table 1B of IS 2309 ) = ( Refer Table 1C of IS 2309 ) = ( Refer Table 1D of IS 2309 ) = ( Refer Table 1E of IS 2309 ) = = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 628.27 Meter2 0.003141 Times per year 0.024000 0.000075 7.5392E-05

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year

Rf-C

= AxBxCxDxE = Overall Multiplying Factor = = xP ie

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

223.67 Meter2 65.22 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 1 Nos

= P/30 = 2 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 1 Nos.

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi PRIMARY CRUSHER HOUSE Value Unit

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR Description / Parameter

Symbol / Formulae / References

A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P = = = 23.00 21.50 21.70 m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) ( Refer Fig. 1 of IS 2309 ) = (Refer Clause 8.1.2 of IS 2309) = ( Refer Table 1A of IS 2309 ) = ( Refer Table 1B of IS 2309 ) = ( Refer Table 1C of IS 2309 ) = ( Refer Table 1D of IS 2309 ) = ( Refer Table 1E of IS 2309 ) = = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 3904.39 Meter2 0.019522 Times per year 0.024000 0.000469 4.6853E-04

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year

Rf-C

= AxBxCxDxE = Overall Multiplying Factor = = xP ie

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

494.50 Meter2 89 Meter 1 Nos

ii)

For Base Area (Ab) > 100m

= P/30 = 3 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 2 Nos.

b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required

= 1+(Ab-100)/300

2 Nos

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi SECONDARY CRUSHER HOUSE Value Unit

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR Description / Parameter

Symbol / Formulae / References

A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P = = = 38.00 17.40 24.20 m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) ( Refer Fig. 1 of IS 2309 ) = (Refer Clause 8.1.2 of IS 2309) = ( Refer Table 1A of IS 2309 ) = ( Refer Table 1B of IS 2309 ) = ( Refer Table 1C of IS 2309 ) = ( Refer Table 1D of IS 2309 ) = ( Refer Table 1E of IS 2309 ) = = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 5181.47 Meter2 0.025907 Times per year 0.024000 0.000622 6.2178E-04

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year

Rf-C

= AxBxCxDxE = Overall Multiplying Factor = = xP ie

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

661.20 Meter2 110.8 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 3 Nos

= P/30 = 4 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 3 Nos.

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR WAGON TIPPLER AREA Description / Parameter Symbol / Formulae / References Value Unit

A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P = = = 41.00 18.00 19.00 m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) ( Refer Fig. 1 of IS 2309 ) = (Refer Clause 8.1.2 of IS 2309) = ( Refer Table 1A of IS 2309 ) = ( Refer Table 1B of IS 2309 ) = ( Refer Table 1C of IS 2309 ) = ( Refer Table 1D of IS 2309 ) = ( Refer Table 1E of IS 2309 ) = = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = 27 No. of Days / Year 5 Nos./km2/year 1 0.8 1 0.4 0.3 4113.54 Meter2 0.020568 Times per year 0.096000 0.001974 1.9745E-03

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year

Rf-C

= AxBxCxDxE = Overall Multiplying Factor = = xP ie

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

738.00 Meter2 118 Meter 1 Nos

ii)

For Base Area (Ab) > 100m

= P/30 = 4 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 3 Nos.

b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required

= 1+(Ab-100)/300

3 Nos

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS

PROJECT : CLIENT :CONSULTANT :BOP CONTRACTOR :-

1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV) RRVUNL DCPL, New Delhi Indure, New Delhi

LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR DRIVE HOUSE Description / Parameter Symbol / Formulae / References Value Unit

A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION i) Input Data :a) Dimensions of Building / Structure
Length of the Building Width of the Building Height of the Building L ( Refer the Relevant Layout W Drawings of the Building / H Structure ) N Ng A B C D E Ac P = = = 15.50 8.50 5.00 m m m

b)

Lightning Flash Density & Weighing Factors


Number of Thunderstorm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Weighting Factor A ( Use of Structure ) Weighting Factor B ( Type of Construction ) Weighting Factor C ( Content of Consequential Effects ) Weighting Factor D ( Degree of Isolation ) Weighting Factor E ( Type of Country ) ( Refer Fig. 1 of IS 2309 ) = (Refer Clause 8.1.2 of IS 2309) = ( Refer Table 1A of IS 2309 ) = ( Refer Table 1B of IS 2309 ) = ( Refer Table 1C of IS 2309 ) = ( Refer Table 1D of IS 2309 ) = ( Refer Table 1E of IS 2309 ) = = (L x W) + 2 (L x H) + 2(W x H) + 3.14 H2 = = 27 No. of Days / Year 5 Nos./km2/year 1 0.2 1 0.4 0.3 450.25 Meter2 0.002251 Times per year 0.024000 0.000054 5.4030E-05

ii)

Calculations :Collection Area ( Refer Clause 8.1.2 of IS 2309 ) Probable Number of Strikes to Building / Structure per Year ( Refer Clause 8.1.2 of IS 2309 ) Overall Multiplying Factor Overall Risk Factor Calculated

= Ac x Ng x 10-6 times/year

Rf-C

= AxBxCxDxE = Overall Multiplying Factor = = xP ie

iii)

Maximum Acceptable Overall Risk Factor:Maximum Acceptable Overall Risk Factor Rf-A ( Refer Clauses 8.1.3 & 8.1.6 of IS 2309 ) =
ie

0.000001
1.000E-06

iv)

Result / Conclusion :Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor > Hence, Lightning Protection is Required.

B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS Calculations (As per Clause 12.2.3 of IS-2309):Ab = ( L x W ) Base Area of Structure P = 2(L+W) Perimeter of Structure i) For Base Area (Ab) < 100m2
a) Number of Down Conductors Required = For Ab < 100m2

= = =

131.75 Meter2 48 Meter 1 Nos

ii)

For Base Area (Ab) > 100m2


b) Based on Base Area of Structure:Number of Down Conductors Required c) Based on Parimeter of Structure:Number of Down Conductors Required = 1+(Ab-100)/300 = 1 Nos

= P/30 = 2 Nos. Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309) = Hence, Required Number of Down Conductors 1 Nos.

REVISION DETAILS

Rev.
R0

Date
30.06.2009

Drg/Doc. No.
3VYN855200

Remarks
First Submission

Prepared
RK

Reviewed
PS

Approved
PAS