COMPANY SPECIFICATION FOR PRESSURE GAUGES

PLANT: PLANT LOCATION: PROJECT NUMBER:

COMPANY Engineering Department INSTRUMENT SPECIFICATION

PRESSURE GAUGES Issued for Bids No. Date Revision Approved SPECIFICATION NO. 17105

PART I - GENERAL 1.1 Description Equipment shall be furnished in strict accordance with this specification and all documents as noted herein. The bidder shall state on his quotation that he meets all requirements without any exceptions. If there are any exceptions, they must be itemized. Catalog or model number description is not sufficient. The quotation shall include the full description. Descriptive brochures, pamphlets or drawings shall be attached. 1.2 Tagging All instruments shall have the following identifying information on a stainless steel nameplate permanently fastened to the instrument: Tag number, service description Manufacturer's name, model, and serial number Purchase order number Job number As applicable, nameplates shall also carry information relating to pressure rating of pressure holding parts, operating range, voltage, frequency, and materials of parts exposed to process fluids. 1.3 Quality Assurance A. All instruments/systems shall meet federal, state, and local codes where equipment is to be installed, including Occupational Safety and Health Administration (OSHA) requirements. Applicable codes and standards of the following national organizations shall also be adhered to:
Instrument Society of America (ISA) National Electric Code (NEC) Underwriter's Laboratories (UL) Factory Mutual (FM) American National Standards Institute (ANSI)

B.

PRESSURE GAUGES

American Society for Mechanical Engineers (ASME) American Society for Testing and Materials (ASTM) Institute of Electrical and Electronics Engineers (IEEE) National Fire Protection Association (NFPA) National Electrical Manufacturers Association (NEMA)

C.

The vendor shall maintain and make available to The Company quality assurance test data for those components subjected to examination or trial. The Company reserves the right to review all relevant test data.

PART II - PRODUCTS 2.1 Assembly - See attached chart.

PART III - EXECUTION 3.1 Calibration and Testing A. The instrument shall be factory calibrated for the range specified in the data sheets, and means shall be provided for zeroing and calibrating in the field. Each instrument shall be completely assembled, wired, and functionally tested as a complete unit. Test and/or inspection by the purchaser shall be made only if specified in the purchase order.

B. C. 3.2 Paint A.

Protection housing shall be painted with epoxypolyester, or equal, to manufacturer's standard color.

3.3

Delivery A. Vendor must complete delivery of all accordance with instructions to bidders. items in

3.4

Shipping

PRESSURE GAUGES

A. B. C.

All ports and openings shall be sealed. Threaded connections shall be protected metallic or molded plastic caps or plugs. with

Machined or threaded exterior surfaces, which will be exposed to the atmosphere in shipment and storage, shall be protected with an easily removable rust preventative coating.

3.5

Project Data Sheets A. Instrument data sheets are enclosed as part of this specification.

PRESSURE GAUGES

COMPANY VENDOR DATA REQUIREMENTS

EXHIBIT I

1. GENERAL The following data constitute a part of the Inquiry and Purchase Order and are to be supplied as indicated. 2. MAILING INSTRUCTIONS 3. All data furnished to be certified and bear the following identification: Facility: Location: Drawings and data per listing below are to be forwarded to: Purchaser: ATTN: Engineering Department P.O. No: Job No.: Project No. Spec No.: 4. FORM OF DRAWINGS "P" designates Manufacturer's standard print. "R" designates a full size transparency from which legible prints may be made. "E" designates electronic media. 5. TIME LIMITS a) Approval drawings, when required, must be submitted within 2 weeks from receipt of Purchase Order. b) LBC will review and return drawing c) Final drawings must be submitted within 2 weeks from receipt of approved drawings. 6. DRAWINGS Vendor's drawings will be reviewed and approved only as to arrangement and conformance to the specifications and related drawings, and approval shall not be construed to relieve or mitigate the Vendor's responsibility for accuracy or adequacy and suitability of materials and/or equipment represented thereon. a) PROPOSAL DRAWINGS shall be Manufacturer's standard drawings in sufficient detail to layout equipment drives, and access for maintenance and operation and design of foundations and supports. b) DWGS FOR COMMENTS shall be transparencies complete with equipment number(s) and purchase order number. Initial drawings must show all information necessary for Purchaser's design of foundations and any connections to other equipment. c) FINAL DRAWINGS shall be transparencies complete with equipment number(s) and purchase order number, stamped "CERTIFIED FOR CONSTRUCTION" and signed by a person authorized to bind the partnership or corporation. Certification warrants delivered equipment shall conform to the final drawings. Should delivered equipment fail to conform, Vendor shall furnish all materials, labor, and equipment required to correct such failures to the satisfaction of the Owner.

PRESSURE GAUGES

NUMBER AND FORM REQUIRED

ITEM

DESCRIPTION WITH EACH PROPOSAL ISSUE AFTER RECEIPT OF P.O. COMMENTS FINAL 1R+8P+1E 1R+8P+1E 1R+8P+1E 8P+1E 1R+8P+1E 1R+8P+1E 1R+8P+1E 8P 8P 8P 1R+8P+1E 1R+8P+1E 1R+8P+1E 1R+8P+1E 1R+8P+1E 1R+8P+1E REV.

A B C D E F G H J K L N O R S U V W X Y Z ITEM:

General Arrangement Outline Drawing and Foundation Requirement Detail Shop Drawings Welding Procedures Calculations Completed Data Sheets Curves Complete Parts List Including Vendor & Orig.Mfg.Parts List List of Recommended Spare Parts for 1 Year Operation/Prc. Instruction Manuals Certified Data Books Certified Performance Data Cross-Section With Parts Description Wiring Diagrams Lubrication Schedule Piping and Instrument Diagrams Code Certificates Instrumentation Bill of Materials Anchorage and Loading Diagrams Motor Specification Sheet List of Special Tools (For Erection and Maintenance) VENDOR DRAWING AND DATA REQUIREMENTS

1P 1P 1P 1P 1P 1P

1R + 4P 1R + 4P 3P 1P 1P 3P 3P

1P

1P

3P 3P 3P 3P 3P 3P 3P

1P 1P 1P 1P 1P PROJECT NO. SPECIFICATION NO. 16967