DESIGN MANAGEMENT & AUDITING OF ELECTRICAL SYSTEM (DMAES)

BE Sem-VIII Electrical Chapter1 L1-6

Estimation
It is the art of assessment of quantities of different items and cost thereof to plan the amount required for executing a work before actually carrying out the work It helps in taking right and definite decision while entering into a contract with any firm

Fr.CRIT,Vashi

Purpose of Estimating and costing


Before starting of a new program it is necessary to know: The necessary material required and The cost involved in it. So, It is necessary to make a complete project report for the said program. As it acts as a complete guide in successful implementation of Fr.CRIT,Vashi our program. 3

Purpose of Estimating and costing


For successful implementation of any program a complete project report is to be prepared. Project report includes knowledge about work to be done, such as drawing of the work, Complete details of the necessary material with its costing and sequence of operation to be performed. Fr.CRIT,Vashi 4

Aims of estimations and costing


As we get the list of material before starting the job so that there are less chances of missing any necessary material after starting the work. Money is not misused in projects under implementation. Time is saved.

Fr.CRIT,Vashi

Facts should known to an estimator


Complete specifications, scheme of installations, type of wiring etc. Complete schedule of points to be wired with other details Drawings marked with details such as positions of switchgear and DB Other factors related to location of sites, availability of labor, duration of completion

Fr.CRIT,Vashi

Problems that can arise in the work started without estimation and costing
Interruption may come in continuation of the project as it becomes very difficult to purchase necessary material in the absence of list of materials. The money is misused by purchasing smaller or excess quantities of material, and the shortage of money can cause stoppage of work. Due to above hurdles, the work can take more time for completion and it can affect the other project which is related to the existing project.
Fr.CRIT,Vashi 7

Qualities of a good estimator


Have thorough knowledge and practical experience about estimation. Go to the work place for inspecting the project time to time . A good imagination and experimenting power. Through and update knowledge about the prevailing designs. Always keep provision for future extension or diversions while estimating. Keep update knowledge of prices of material and for that he should keep on changing the price lists maintained in his office.
Fr.CRIT,Vashi 8

Steps involved in estimation


Specification of material Latest market cost of material Price list Calculation of material and labor cost Knowledge of purchase system Labor cost Contingencies Overhead charges Production cost Profits Total cost Storage cost Fr.CRIT,Vashi Tools and plant charges

Specification of material
The specification and cost of all necessary material should be known while preparing estimation Without the knowledge of specification purchase of material will be difficult Without detailed specifications ,shopkeeper feels difficult to provide material.

Fr.CRIT,Vashi

10

This is the cost of the material at which it can be purchased. Market survey has to be conducted for estimating the cost of enlisted material so that shop keeper should not overcharge for certain material. Market surveying and purchasing should be done by the experts only.

Market cost of material and market survey

Fr.CRIT,Vashi

11

Mistake or carelessness in market and purchasing will add to the cost of electrical installation and also time in completion of project. After market survey ,quotations are invited for the enlisted necessary material from related shops. The cost given in quotations of different shops are compared and the material is purchased at the lowest rates offered by supplier

Market cost of material and market survey

Fr.CRIT,Vashi

12

Price list
By market survey the estimator get the pricelist for the materials from shop keeper in which the retail and the wholesale prices will also be given according to local market rates. Price list should be updated time to time according top market rates

Fr.CRIT,Vashi

13

Net Price
It is the price of an item which includes all taxes such as VAT, sale tax, central sale tax, excise duty and other local taxes. These taxes are not mentioned in a price list. If the discount is given by the factory then shopkeeper will deduct the discount and then will charge the tax. Eg. If price of an item is 100 Rs. And discount given by factory is 10 % ,then Rs. 100-10=90, and the sale tax at the rate of 5% will give net price=90+4.5=94.5
Fr.CRIT,Vashi 14

Determination of material and labour cost


The total cost involved in the project is completed in two steps:
Quantity of material and cost determination.

Determining of labor charges

Fr.CRIT,Vashi

15

Table: List of material

Sr. Name of item with Required Quantity Rate No full specifications . Quantity unit Rs. Per 1 Double pole, iron clad, main s/w,30Amp, rating,250V 1 No.

Total cost in Rs.

Remarks

150 each 150

As main control switch

Fr.CRIT,Vashi

16

Determination of labour cost


Labor charges are different at different places. In cities a trained electrician may charge Rs. 150/- a day. In rural equally trained charge Rs.80/- a day.
Fr.CRIT,Vashi

electrician may

17

Determination of labour cost


The labour charges are decided as per: work duration & work amount i.e. actual labour cost as paid to daily wages. As per unit work basis. As per percentage of material cost.

Fr.CRIT,Vashi

18

Table: Labour rates & labour payment

Sr No

Class of labour No. of days

Rate per day

Total payment

Remarks

Rs.
Skilled labour

Paise Rs Paise .

Unskilled labour
Fr.CRIT,Vashi 19

Table: Total labour payment


Sr Description of unit work No. of Rate No. conduit points Rs. Paise 1. 2. 3. 4. Main board installation 15 s/w boards @ 2 points for each s/w board Installation of bell push button & laying under ground wiring up to main gate @ 6 points per bell Total points light/fan/sockets Total labour charges
Fr.CRIT,Vashi

Total payment Rs. 80 600 120 920 Paise 00 00 00 00

Remarks

4 30 6 40

20 20 20 20

00 00 00 00

1720 00
20

Table: Determination of Labour charges

Sr Description of No material 1.

Cost (say)

Rate % of total material 15%

Amount cost Rs. 917.25 920.00

Total cost of 6115.0 wiring material 0

Fr.CRIT,Vashi

21

Knowledge of purchase system


It is compulsory to have a complete knowledge of purchase system on the part of department. Department officer is also responsible for: proper storage of material and Issue of material time to time. Should keep a complete account of material used on the project from day to day. Purchase of the item fallen short in the store and Issue the same as and when necessity arises. The department has to ensure that the project work is not stopped due to lack of material.
Fr.CRIT,Vashi 22

Contingencies
Contingencies are: The emergency expenses which cannot be calculated while calculating the material and labor expenses during completion of project. These expenses may be due to natural calamities such as floods, earth quack, storms, etc. emergency expenses may be due to increase in cost of material or increase in labor costs. 3% to 5% of material cost and labor cost is estimated to be on contingency.
Fr.CRIT,Vashi 23

Overhead charges
Overhead charges are:
Other expenses like Govt. taxes and additional expenses on labor in addition to the estimated expenditure.

Divided in two categories:


Maintenance overhead charges Administrative overhead charges

Fr.CRIT,Vashi

24

Maintenance overhead charges


Expenditure involved on:
keeping machine in working condition. Water charges Electricity charges House tax Depreciation charges on components and instruments.

Fr.CRIT,Vashi

25

Administrative overhead charges


Fund is required to run administration of various departments and their employs properly and efficiently. Expenditure involved on:
Functioning of departments like
Purchase section Sales section Salaries section Account section etc.
Fr.CRIT,Vashi 26

Administrative overhead charges


Office furniture Stationary Reception Stay arrangement of guests Payment on commissions of sales Publicity of product Dispatch of material Transport Sales tax

Fr.CRIT,Vashi

27

Production cost
Production cost = Cost of material + labor charges + overhead expenses (maintenance +administrative +supervision)

Fr.CRIT,Vashi

28

Supervision charges
A contract is given to professionally trained and expert engineers to supervise the project work Supervision charges are: The payment of contract money and other expenses involved on the team. 1% to 1.5% of total cost.
Fr.CRIT,Vashi 29

Profits
Are calculated on the basis of total expenditure involved in the project completion stage. Can be from 10% to 30% or even more if expenditure are controlled and full efficiency is exercised while working on the project. Profit % can fall if: Poor planning Inadequate and insufficient staff Lack of proper supervision Purchase of low quality material at higher rates.
Fr.CRIT,Vashi 30

Storage Charges
The cost involved to: Transport purchased material to store Transport material to Work sites Labor expenses on loading and unloading the material.

2% to 3% of total cost on purchase of material


Fr.CRIT,Vashi 31

Tool and Plant charges


Expenditure on purchase of tools and machines Expenses on breakage and damage losses. 2 % of total cost of material.

Fr.CRIT,Vashi

32

Total Cost
Total of all expenses occurred on the project. Total of material cost, labor charges and overhead charges.

Fr.CRIT,Vashi

33

Total cost
Sr. No . 1. 2. 3. 4 5. 6. 7. Details of expenditure of all types. Expenditure in Lacs 7.00 Material cost 0.75 Labour expenditure 0.21 Contingency-3% material cost 0.85 Overhead expenditure-11% of material cost & labour 8.81 cost.(7.75) 0.13 Total Supervision overhead charges on above all-1.5% 8.94 Total coat Rounded off to Rs. 9.00 Fr.CRIT,Vashi Rema rks

34