Professional Documents
Culture Documents
CHINA PETROLEUM TECHNOLOGY&DEVELOPMENT CORPORATION CNPC JICHAI POWER EQUIPMENT COMPANY OCTOBER, 2012 CPTDC
1
CNPC JPEC
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
PROGRAMME 2. BASIC CONSTRUCTING STRUCTURE FOR POWER
STATION
3. BASIC TECHNICAL DATAS FOR POWER STATION 4.TYPICAL PROGRAMMES 5.ECONOMIC ANALYSIS
CPTDC
CNPC JPEC
BUSINESS SCOPE
190 series diesel generating sets from 200kW to 2000kW
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
BUSINESS 2.DETAILED DESCRIPTION FOR POWER STATION FROM ONE SYSTEM TO ANOTHER 3. BASIC TECHNICAL FEATURES FOR POWER STATION 4.TYPICAL PROGRAMME
5.ECONOMICAL ANALYSIS
CPTDC
CNPC JPEC
Power distribution Electricity generating applicant Cooling system for power station
P
Biogas source desulfurizer Roots blower dehydrator Biogas storage Flow gauge
Fuel cooler
Cost effectiveness, high cooling efficiency Abundant water consumption Well adapted to bad cooling water quality Customer should buy water pump extraordinary Low electrical power consumption
Oil cooler
central airconditioning
Exhaust tail gas Natural gas Natural gas gensets Smoke water is compensation for air-conditioning hot water: sixty-five degrees: thermal efficiency 46%
Gensets total installed capacity is 1.2MW, which could satisfy 7000square meters cooling areas , thermal areas totally 15000
Anchor bolt
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
PROGRAMME 2. BASIC CONSTRUCTING STRUCTURE FOR POWER
STATION
3. BASIC TECHNICAL DATAS FOR POWER STATION 4.TYPICAL PROGRAMMES 5.ECONOMIC ANALYSIS
CPTDC
19
CNPC JPEC
BASIC PARAMETERS
TECHNOLOGY INQUIRE CHART
CPTDC
20
CNPC JPEC
BASIC PARAMETERS
TECHNOLOGY INQUIRE CHART
CPTDC
21
CNPC JPEC
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
PROGRAMME 2. BASIC CONSTRUCTING STRUCTURE FOR POWER
STATION
3. BASIC TECHNICAL DATAS FOR POWER STATION 4.TYPICAL PROGRAMMES 5.ECONOMIC ANALYSIS
CPTDC
22
CNPC JPEC
REMARKABLE PROGRAMME
CNOOC CB/AB offshore drilling plant form associated gas power station This is the first unit of gas power generating system applied to the offshore platform, and have passed CCS international certificate
CPTDC
23
CNPC JPEC
REMARKABLE PROGRAMME
51000kW/10.5kV Nanjing land filled gas generating programmed
CPTDC
24
CNPC JPEC
REMARKABLE PROGRAMME
61100kW/10.5kV
LuAn coal mine power station system of ShanXi province, China
CPTDC
25
CNPC JPEC
REMARKABLE PROGRAMME
Chenming biogas OEM power station system of ShanDong province, China
21000kW/10.5kVthermal heat co-generating system
CPTDC
26
CNPC JPEC
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
BUSINESS
CPTDC
27
CNPC JPEC
CONTENT
Fuel cost Lubricating oil cost Spareparts cost Maintenance cost Labor cost Power generating margin + Heat supply margin + cooling supply margin + environmental protecting margin If we disregard the fuel cost, operating consumption is about 0.10 Yuan to 0.15 Yuan per kW.hgenerally
CPTDC
28
CNPC JPEC
CPTDC
29
CNPC JPEC