THE POWER SUBSTATION Busbar change: Disconecting Busbar 2 from the system
19
20
21
THE POWER SUBSTATION One very simple interlocking: Earthing Switch and Disconnector
I can OPEN / CLOSE the Disconnector ONLY if the Earthing Switch is OPEN. If the Earthing Switch is CLOSED I cannot operate the Disconnector.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
The circuit breaker opens and interrupts the fault current. The relay sees no fault conditions anymore and it resets. Circuit breaker remains open, the fault has been cleared.
37
38
39
40
41
42
43
44
45
46
PROTECTION signals (Trip, Block, Acceleration..) are sent through the station bus. Horizontal communication
47
48
49
50
51
52
53
54
Proprietary communication protocols were / are still available. Handling correctly all protocols was and is still a challenge
55
56
IEDs from different vendors can exchange and use information over a common communications media. No need to have protocol converters. Reporting: Vertical Communication.
57
The communication between SCADA / RTU and the IEDs is defined in the IEC 61850 standard (MMS / FTP).
Data exchanged can be:
Control (operating primary objects) Log Reporting of events Disturbance Files Upload
58
59
Protection and Control signals are dependent on the correct functionality of the communication system, which has in the Ethernet switches one of its most important factors.
60
Ring
61
62
63
64
65
SCL
66
SCL
67
SCL
68
SCL
SCL
69
While this IED allows to upload the disturbance recorder files (FileHandling Service is listed):
70
71
72
73
74
75
76
77
78
The ICD files are imported in the IEC 61850 Engineering TOOL and GOOSE Reporting information are added for each IED, creating the so called SCD file (Substation Configuration Description).
The SCD file is then exported from the Engineering Tool. IED vendor tools will import that file and will download in the IEDs the IEC 61850 information that are written in the SCD files.
79
80
81
82
83
PROCESS BUS
Sampled Values PROCESS Merging IEC 61850-9-2 Units NCIT (SV) 9-2 (MU) BUS
84
85
THE RELAY
86
Replacement of BO cards
GOOSE OUT
87
Replacement of BI cards
GOOSE OUT
GOOSE IN
88
GOOSE OUT
GOOSE IN
89
GOOSE IN
GOOSE OUT
GOOSE IN
GOOSE OUT
SAMPLED VALUES
GOOSE IN
GOOSE OUT
SAMPLED VALUES
GOOSE IN
GOOSE OUT
94
Merging Units
95
Merging Units
96
97
98
99
100
101
102
Information on new IEC 61850 documents Information on IEC 61850 events Information on new instruments and techniques on the IEC 61850
103
104
105