You are on page 1of 51

NH

21

NH
22

NH
64
PILING AND PILE CAP

PRE-TENSIONING OF CONCRETE
GIRDERS

REINFORCED EARTH WALL

QUALITY CONTROL
CLASSIFICATION DEPTH

Sandy Silt with Gravel 0–5m


(SM-ML)
Silty Clay with Low 5–6m
Plasticity (CL)
Silty Sand (SM) 6–9m

Cobbles and Pebbles 9 – 18 m


Intermixed with Sand
and Silt
Silty Clay with Medium 18 – 23 m
Plasticity (CL)
RoutineLOAD
test(T)was carried for 2% of working
SETTLEMENT (mm)
piles.
0.00 0.00

The maximum
33.25 settlement of test loading in
0.201
position 67.11
being not exceeding 120.512
mm.
100.37
Increments 0.842
of 20%of design load are given
after 45min.
135.11 1.121
Incremental
168.01loading is stopped once
1.424 the rate
of settlement is 0.1 mm in first 30 mins or 0.2
mm in first hour.
202.01 1.875

237.12
Load is maintained for 24 hours2.602
and then
rebound272.22
is noted. 3.752
 Pile cap is a reinforced concrete structure, which
allows the load from a Pier to be equally shared
between groups of piles.

 PCC layer of 100 mm is laid

 Chipping of the top 1m of pile is done

 Marking is done on PCC layer for tying


reinforcement leaving a clear cover of 75 mm on
all sides

 Shuttering is done after tying reinforcement

 Concreting done in M-35 grade and a slump of


DECREASE IN DEAD LOAD

HIGHER LOAD CARRYING CAPACITY

REDUCTION IN CROSS-SECTIONAL
DIMENSION

CRACK FREE STRUCTURE

ECONOMY

ENABLES USE OF SEGMENTAL TECHNOLOGY


Thread the HTS Strands in the R/F cage of the
Girder

Anchor all strands on the Pulling-block with master


wedges and barrel

Place Four Central Hole Jacks on live end through


already placed Macalloy Bars

Connect all four jacks to Power Pack through


manifold arrangement

Stress the strands upto 100 Kg/cm² to remove


slackness
Stress the strands by pulling all four Macalloy Bars
simultaneously up to a force of 60% of total force

Keep screwing the Macalloy Nut against the Live-


end anchor frame plate
Go up to full force as stipulated in the structural
drawings i.e. 199.42kN equivalent to a pressure of
526kg/cm²
Retract the jack fully and remove the jacks from the
Macalloy Bars
Stress top strand/s one by one by Single Strand Jack
requiring a pressure of 482 kg/cm²

Concrete with RMC M40 grade with a Boom Placer,


cast 15 cubes
Cure the Girder on the stressing Bed for 3-4 days till
it attains 90% strength (36 MPa)

De-tension the girders with help of arrangement


same as that for Stressing

Cut the extra strand and shift the girder to curing


bed
MACALLOY CENTRAL HOLE JACKS
BARS

MACALLOY
NUT

POWER
PACK
SINGLE
COMPACTION
PULL STRESSING
ARRANGEMENT
NEEDLE VIBRATOR

MONOSTRAN
D JACK

CONCRETING BY BOOM PLACER


DOWEL
S
DIAPHRAGM

TOP
STRAND

BOTTOM
STRAND DIAPHRAGM

OUTER INNER
WEDGE-
GIDER GIRDER
TRANSPORTATION
ERECTION OF GIRDER
OF GIRDER
BY CRANE
AT SITE

TEREX GIRDER
DEMAG
 Carried out at night when the traffic volume is
low

 Proper arrangements are made for traffic control

 Speed of trailer is limited to 10km/h CRANE

 Equipments used

 Trailer 50 T capcity
 Terex Demag 120 T capacity
TRAILER
 Crane 100 Tcapacity
 Lifting hooks
AMBALA END CHANDIGARH
Reinforced Earth is a composite material
END
formed by the interaction between a
frictional soil and reinforcing strips.
LENGTH OF 139.114 m 214.114 m
TheWALL
reinforcing strips resist stresses
produced within the soil mass

MAX HEIGHT 5.605 m 8.045 m


Stresses are transferred to the strips via
friction
MIN HEIGHT 1.489 m 1.295 m
Precast Concrete panels :
GRADIENT 3.00 %
 prevent erosion of the backfill
Excavation and installation of drainage
system (if any)

Form and pour levelling pad, M30 grade,


150 mm x 350mm

Set and brace the course of facing


panels

Set batter (12-15 mm) , Check horizontal


alignment and level

Wood wedges and clamps to hold panels


in position
Attach filter cloth with adhesive

Spread, water and compact backfill in


lifts up to 50-75 mm above panel tie
strips
Connect reinforcing strips to panel tie strips
with bolts
Compact backfill to within 60 mm of the top
of the panels (min. 95% of MDD) upto
1500mm from inner face of panel
Lay filter media upto 600 mm from inner
face of panel
Compact inner, 1500mm wide backfill upto
min 90% MDD
Plumb Check of completed panels

Bearing blocks/EPDM pads and set the


second course of full panels

QUALITY CHECK OF COMPACTION: SAND


REPLACEMENT TEST
Repeat the steps to attain desired height
90% 95% MDD
MDD
HOOK
BRACIN
FOR
G
LIFTING

WEDG
E

EPDM
PAD

CLAMP
LIGHTWEIGHT PLATE
VIBRATOR

FILTER
LU MEDIA
G

SMOOTH-DRUM
VIBRATORY ROLLER
HIGH
ADHERENCE
STRIPS

INWARD SLOPE OF
2.5%
DESCRIPTION UNIT TEST 1 TEST 2
FIELD DENSITY
Mass of wet soil from hole
gm 3645 4410
(Ww)
DATE OF
Mass of TEST
Sand + Cylinder 06-12-07
gm 14000 14490
before pouring (W1)

Mass of Sand + Cylinder after


LOCATION LHS, RE-WALL
gm REPLAC
AMBALA
10882 10881
pouring (W2) ED
SIDEof Sand in hole + Cone
Mass EARTH
gm 3118 3609
(W3 = W1-W2) C
Mass of Sand in Hole (Wb = Y gm
MAX. DRY DENSITY
W3-Wsc) 2.02
2238 2729
L
Volume of Sand in the hole (V) cc 1659.01 C
2022.98
I
Bulk Density of Soil (Gb = ONE
OMC N gm 2.197 2.180
Ww/V)
D
9.5 %
MOISTURE CONTENT S
E
Moisture Meter reading AND
R % 7 5
BULK DENSITY
Corrected moisture OF SAND
as per 1.349
% 9 7
calibration (w)
RAPID RESULTS
WEIGHT
Density OF SAND Gd = IN CONE H
gm/cc(Wsc) = 880 gm
ofMOISTURE
Soil, WEIGH 2.016 2.037 OLE
METER
(Gb×100)/(100+w) BALAN
Percentage Compaction
% 99.78 100
•Done at
plant and on SLUMP
recieval at CONE
site

•6 cubes are
cast for each
Transit Mixer
at plant as
well as on
TAMPIN
site G ROD
CUBE WEIGH
 NAME DENSIT AGE
OF STRUCTURE LOAD COMPRES AVERA
NO. T : PSC
Y GIRDER
(day AT SIVE GE
(gm)OF CONCRETE
 GRADE (gm/cc) s) FAILU STRENGTH (N/mm
: M 40 RE (N/mm² ) ²)
(kN)
2 8305 2.461
 STRUCTURAL MEMBER 450 20.00
: RP 39
4 8299 2.459 450 20.00
3 19.85
 LOCATION
7 8300 2.459 440 19.56
: Site Lab
5 8342 2.472 860 38.25
 SIZE OF CUBE (mm)
6 8295 2.458
: 870 38.70
150*150*150 7 37.81
9 8311 2.463 820 36.47
1  LOADING
8296 2.458 1200 53.38
: 315 kN/min
3 8300 2.459 1190 52.94
28 53.38
10 8329 2.468 1210 53.83
 Characteristic Compressive Strength 40 N/mm²

 Maximum size of Aggregate 20 mm

 Degree of Workability 0.9 compacting


factor

 Degree of Quality Control Good (Table 40,


SP23:1982)

 Type of Exposure Normal


(Table1700-3, MORTH)

 Initial current margin


12kN/mm² (Table 1700-5
 Table 5, IS: 10262-1999

Sand Content 38% Water


180kg

 High Range Water Reducing Admixture 1.1%

 Water : Cement 0.36


(figure 2 ,IS: 10262-1999, Curve E)

 Free Water Content 158 kg

 Cement 440kg

 Total Water (after adjustments)


182.10kg
Fa (Sand) 672
kg

Ca (10mm+20mm) 1130 kg

20 mm aggt. (50%) 565 kg

10 mm aggt.(50%) 565


kg

Batch for 20
Water kg Cement:
Cement Sand 10 mm 20 mm
8.28 20 30.55 25.68 25.68

You might also like