Professional Documents
Culture Documents
25 December 2013
PMI Revision 00
TRANSFORMERS
25 December 2013
PMI Revision 00
Presentation outline
Need Working Principle Types of Transformers Construction Features Transformers Accessories Major Transformers in Power Plants
Transformer Losses
Condition Monitoring of Transformers
25 December 2013 PMI Revision 00 3
WHY TRANSFORMER
TO OPTIMISE COST OF BULK TRANSMISSION OF POWER FROM GENERATORS TO CONSUMERS REDUCTION IN TRANSMISSION LOSS
Working Principle
If a time-varying voltage is applied to the primary winding of turns, a current will flow in it producing a magnetomotive force (MMF). Just as an electromotive force (EMF) drives current around an electric circuit, so MMF tries to drive magnetic flux through a magnetic circuit. The primary MMF produces a varying magnetic flux in the core, and, with an open circuit secondary winding, induces a back electromotive force (EMF). In accordance with Faraday's law of induction, the voltage induced across the primary winding is proportional to the rate of change of flux:
25 December 2013
PMI Revision 00
Working Principle
Vp/Vs = Np/Ns
where
Vp and Vs are the voltages across the primary winding and secondary winding, Np and Ns are the numbers of turns in the primary winding and secondary winding, dP / dt and dS / dt are the derivatives of the flux with respect to time of the primary and secondary windings.
25 December 2013
PMI Revision 00
25 December 2013
PMI Revision 00
25 December 2013
PMI Revision 00
10
Classifications
Transformers are adapted to numerous engineering applications and may be classified in many ways: By power level: (from fraction of a volt-ampere(VA) to over a thousand MVA), By application: (power supply, impedance matching, circuit isolation), By frequency range: (power, audio, radio frequency(RF)) By voltage class: (a few volts to about 765 kilovolts)
25 December 2013 PMI Revision 00 11
Classifications
By cooling type: (air cooled, oil filled, fan cooled, water cooled (Natural/ Forced) etc.) By purpose: (distribution, rectifier, arc furnace, amplifier output, etc.). By ratio of the number of turns in the coils Step-up The secondary has more turns than the primary. Step-down The secondary has fewer turns than the primary. Connection : Single phase, Star / star, Star delta etc Construction : Core Type Shell Type
25 December 2013 PMI Revision 00 12
Classifications
Isolating
Intended to transform from one voltage to the same voltage. The two coils have approximately equal numbers of turns, although often there is a slight difference in the number of turns, in order to compensate for losses (otherwise the output voltage would be a little less than, rather than the same as, the input voltage).
Variable
The primary and secondary have an adjustable number of turns which can be selected without reconnecting the transformer.
25 December 2013 PMI Revision 00 13
COMPONENTS - CORE
Core
-The conductor for the flux -The skeleton for mechanical rigidity of the active part -The core, an unbroken path for magnetic flux CRGO or Cold Rolled Grain Oriented Steel is available in various grades (generally called M3, M4, M5 & M6).
25 December 2013
PMI Revision 00
15
Core
In all types of transformers, the core is constructed of sheet steel lamination to provide continuous magnetic path with a minimum of air gap. The steel used should have high permeability and a low hysterisis loss at the usual operating flux densities. The eddy currents loss is minimised by laminating the core with the laminations being insulating from each other by a high coat of core plate varnish or by an oxide layer on the surface. The thickness of laminations vary from 0.30 mm to 0.5mm
25 December 2013 PMI Revision 00 16
Types
The transformers are of two general types distinguished from each other by the manner in which the primary and secondary coils are placed around the laminated steel core. They are (a) shell type and (b) core type.
25 December 2013
PMI Revision 00
17
25 December 2013
PMI Revision 00
18
Transformer Construction
25 December 2013
PMI Revision 00
19
25 December 2013
PMI Revision 00
20
25 December 2013
PMI Revision 00
21
Wound core
25 December 2013
PMI Revision 00
22
Stacked core
25 December 2013
PMI Revision 00
23
Transformer Insulation
Minor insulation Like inter turn insulation, is achieved using cellulogic paper. Major insulation Between primary and secondary, phase to phase and inner coil to core. This is achieved by Bakelite, wooden blocks, cellulogic paper cylinders. Transformer Oil: derivative or petroleum crude. This has good dielectric strength. also a good cooling medium and absorbs heat from the windings in transformer.
25 December 2013
PMI Revision 00
24
Transformer Insulation
Thus mineral oil has a flash point of 140C and 160C fire point. This also 'can Sustain the combustion with its own energy, once it catches fire. Thus this is unsuitable for the transformer located indoors. The indoor transformers are filled with a synthetic liquid known as silicate liquid. This is fire assistant and has flash point well above 300C.
25 December 2013
PMI Revision 00
25
Transformer Oil
25 December 2013
26
NAPTHANIC BASE OILS GENERALLY HAVE HIGHER RESISTIVITY VALUES WHEN COMPARED TO PARAFFINIC BASE OILS AND HAVE BETTER OXIDATION STABILITY. EQUALLY GOOD PARAMETERS CAN BE ACHIEVED WITH PARAFFINIC BASE OILS ALSO, WHEN PROPERLY REFINED. OIL PARAMETERS ARE IMPORTANT. BASE OF OIL IS NOT IMPORTANT(NONE OF THE STANDARDS SPECIFY THE BASE OF OIL)
25 December 2013 PMI Revision 00 27
USE OF TRANSFORMER OIL WITH CRUDE BASE AS NAPTHANIC/ PARAFFINIC PRESENT NTPC SPEC. IS IN LINE WITH IS:335 (1993). SUGGESTED IS TO HAVE OIL WITH LOW VISCOSITY AS COMPARED TO PRESENTLY BEING USED FOR BETTER COOLING AND FOR BETTER OIL FLOW. BHEL IS IN THE PROCESS OF FURTHER UPGRADING THE TRANSFORMER OIL PARAMETERS FOR HIGHER VOLTAGE CLASS TRANSFORMERS TO HAVE BETTER STABILITY OF OIL CHARACTERISTICS.
25 December 2013
PMI Revision 00
28
25 December 2013
PMI Revision 00
30
25 December 2013
PMI Revision 00
31
RADIATORS
25 December 2013
PMI Revision 00
32
Buchholz Relay
25 December 2013
33
Buchholz's Relay
This has two Floats, one of them with surge catching baffle and gas collecting space at top. This is mounted in the connecting pipe line between conservator and main tank.This is the most dependable protection for a given transformer. Gas evolution at a slow rate, that is associated with minor faults inside the transformers gives rise to the operation or top float whose contacts are wired for alarm. There is a glass window with marking to read the volume of gas collected in the relay. Any major fault in transformer creates a surge and the surge element in the relay trips the transformer.size of the relay varies with oil volume in the transformer and the mounting angle also is specified for proper operation of the relay.
25 December 2013
PMI Revision 00
34
25 December 2013
PMI Revision 00
35
BUCHHOLZ PROTECTION
Alarm element Operates When a specified volume of gas gets collected in Chamber during Broken down core bolt insulation Shorted Laminations Bad Contacts Overheating of winding parts Trip element Operates by Oil surge in the event of serious fault Short Circuit between Winding Phases or within Windings Puncture of Bushing
25 December 2013 PMI Revision 00 36
25 December 2013
PMI Revision 00
37
25 December 2013
PMI Revision 00
38
25 December 2013
PMI Revision 00
39
Conservator
Conservator With the variation of temperature there is corresponding variation in the oil volume. To account for this, an expansion vessel called conservator is added to the transformer with a connecting pipe to the main tank. In smaller transformers this vessel is open to atmosphere through dehydrating breathers (to keep the air dry). In larger transformers, an air bag is mounted inside the conservator with the inside of bag open to atmosphere through the breathers and the outside surface of the bag in contact with the oil surface.
25 December 2013 PMI Revision 00 40
Buchholtz relay
25 December 2013
PMI Revision 00
41
conservator
25 December 2013
PMI Revision 00
42
Breather
Both transformer oil and cellulosic paper are highly hygroscopic. Paper being more hygroscopic than the mineral oil The moisture, if not excluded from the oil surface in conservator, thus will find its way finally into the paper insulation and causes reduction insulation strength of transformer. To minimise this the conservator is allowed to breathe only through the silicagel column, which absorbs the moisture in air before it enters the-conservator air surface.
25 December 2013
PMI Revision 00
43
The Drycol Breather (A) operates by drawing moist, warm air (B) from an air space or from outside via the air inlet tube (C), and returning it to the conservator (D) as cold dry air. A series of thermoelectric modules are used to alternately cool and heat the units vertical central duct (E) in an automatic continuously repeated cycle, extracting moisture as frost and ice, and melting it to escape via a drain tube (F).
25 December 2013 PMI Revision 00 44
25 December 2013
PMI Revision 00
45
25 December 2013
47
Temperature Indicators
Most of the transformer (small transformers have only OTI) are provided with indicators that displace oil temperature and winding temperature. There are thermometers pockets provided in the tank top cover which hold the sensing bulls in them. Oil temperature measured is that of the top oil, where as the winding temperature measurement is indirect. This is done by adding the temperature rise due to the heat produced in a heater coil (known as image coil) when a current proportional to that flowing in windings is passed in it to that or top oil. For proper functioning or OTI & WTI it is essential to keep the thermometers pocket clean and filled with oil.
25 December 2013
PMI Revision 00
48
Cooling of Transformers
Heat is produced in the windings due to current flowing in the conductors (I- R) and in the core on account of eddy currents and hysteresis losses. Types: ONAN, ONAF, OFAF, OFWF Air Cooled: In small dry type transformer heat is dissipated directly to the atmosphere. Oil Cooled: In oil immersed transformers heat is dissipated by thermo-syphon system action. The oil serves as the medium for transferring the heat produced inside the transformer to the outside atmosphere. Based on Thermosyphon principle.
25 December 2013 PMI Revision 00 49
Cooling of Transformers
Forced Oil forced Air: As the size of the transformer becomes large, the rate of oil circulating by thermo syphon action becomes insufficient to dissipate all the heat produced and an artificial means of increasing the circulation have to be adopted; namely forced oil circulation by electric pumps, providing large radiators with forced air draft, cooling by electric fans which are automatically switched on and off depending upon the loading of transformer. In very large transformers special coolers with water circulation may have to be employed.
25 December 2013
PMI Revision 00
50
25 December 2013
PMI Revision 00
51
Generator Transformer
Generator Transformer The generator is connected to this transformer by means of isolated bus ducts. This transformer is used to step up the generating voltage of around 15KV to grid voltage. This transformer is generally provided with OFAF cooling. It is also provided with off circuit/on load taps on the high voltage side. This transformer has elaborate cooling system consisting of number of oil pumps and cooling fans apart from various accessories.
25 December 2013
PMI Revision 00
52
SPECIFICATION
STAGE -1 GT-Vindhyachal RATED O/P 250MVA RATED VOLT. (HV) 420KV RATED VOLT. (LV) 15.75KV RATED CURRENT(HV) 344A RATED CURRENT(LV) 9175A VECTOR GROUP Ynd11
25 December 2013
PMI Revision 00
53
UAT
For large units, it has become necessary to use more than one auxiliary transformer. In selecting a unit auxiliary transformer, care has to be taken that the percentage impedences of the transformers for the proposed unit should satisfy the following conflicting requirements. The maximum short circuit currents on auxiliary bus should be limited within the maximum switchgear rating available, The maximum permissible voltage dip while starting the largest single auxiliary motor, usually boiler feed pump, shall remain within acceptable limits.
25 December 2013
PMI Revision 00
55
7UA
7UB
SB SA IN THE EVENT OF UNIT TRIPPING AUTO CHANGEOVER FROM UT TO STATION WILL TAKE PLACE 25 December 2013 PMI Revision 00
56
Station Transformers
The station transformer is required to feed power to the auxiliaries during start ups. This transformer is normally rated for the initial auxiliary load requirements of unit. In typical cases, this load is of the order of 60% of the load at full generating capacity. But in large stations where more than one units are operating, the station transformers should have sufficient capacity to start two units at a time in addition to feeding the common auxiliaries. It is also provided with on load tap changer to cater to the fluctuating voltage of the grid.
25 December 2013 PMI Revision 00 57
25 December 2013
PMI Revision 00
58
Instrument Transformers
. Step down values to safe levels for measurement
. Potential Transformers . Also called voltage transformers . Standard output 120V . Current Transformers . Standard output of 1 or 5 amps . Metering and relaying standards . Can produce high voltages if open circuited
25 December 2013
PMI Revision 00
59
Rectifier transformers
Output of the main transformer is connected to the rectifier unit.
25 December 2013
PMI Revision 00
60
Transformer connections :
- Delta/Starused in Generating stations for Step-up. - Star/Deltaused in Receiving stations for Stepdown * All GTs are Delta/Star connected. All Tie T/Fs are Star/Star connected.
25 December 2013
PMI Revision 00
61
STAR
/ STAR connection
STAR
/ DELTA connection
25 December 2013
PMI Revision 00
62
STAR
DELTA
25 December 2013
PMI Revision 00
63
Transformer losses
1. Load loss (or copper loss) 2. No load loss (or iron loss) The total transformer loss, PTOTAL, at any load level can then be calculated from: PTOTAL = PNO-LOAD+ (% Load)2 x PLOAD
25 December 2013
PMI Revision 00
64
25 December 2013
PMI Revision 00
65
25 December 2013
PMI Revision 00
66
Winding resistance Current flowing through the windings causes resistive heating of the conductors (I2 R loss). At higher frequencies, skin effect and proximity effect create additional winding resistance and losses. Magnetostriction Magnetic flux in the core causes it to physically expand and contract slightly with the alternating magnetic field, an effect known as magnetostriction. This in turn causes losses due to frictional heating in susceptible ferromagnetic cores.
25 December 2013
PMI Revision 00
67
Stray losses Not all the magnetic field produced by the primary is intercepted by the secondary. A portion of the leakage flux may induce eddy currents within nearby conductive objects, such as the transformer's support structure, and be converted to heat.
25 December 2013
PMI Revision 00
68
Copper Losses
25 December 2013
PMI Revision 00
69
Core Losses
25 December 2013
PMI Revision 00
70
On-Line Monitoring
25 December 2013
71
ON LINE MONITORING EQUIPMENT ON TRANSFORMER 1. DGA to be monitored on all transformers periodically. Periodicity depends on the nature of evaluation of gases. 2. HYDRANE directly mounted on the transformer and in contact with transformer oil. The use of this device is to detect the change in fault gases, to monitor their evolution. As an alarm is triggered oil is sampled from the transformer to evaluate the nature and severity of the fault.
25 December 2013
PMI Revision 00
72
7. ON LINE MONITORING EQUIPMENT ON TRANSFORMER Contd. 3. Acoustic PD measurement. In case DGA results indicate the presence of high discharges Acoustic PD measurement is done. Acoustic PD detector consists of sensor which can sense sound vibrations produced due to occurrence of discharges in oil. The sensor has pre-amplifier and filter circuit to eliminate environmental noise 4 Infrared thermography With the help of infrared thermo-vision camera, the thermo-image of transformer is prepared This scanning helps in detecting overheated zones, loose & corroded connection.
25 December 2013
PMI Revision 00
73
25 December 2013
PMI Revision 00
74
2.
Recovery voltages measurement It indicates the content of water in the insulation. PRINCIPLE Sample of discharged insulation Charge with DC voltage and note time
Sample to be short circuited for predetermined period of tim ( approximately half of the charged time)
Open the terminal and measure voltage.
3.
25 December 2013
PMI Revision 00
75
4. Resistance & magnetizing current. 5. Maintenance schedule call for daily , quarterly, yearly, two yearly maintenance requirement. Over and above after 7 to 10 years, thorough overhauling and inspection of core-coil assembly by lifting tank top cover / core-coil assembly needed In overhauling sludge deposited on coil is removed and coil assembly which may become loose is tightened. All other clampings & cleats etc. are also tightened
25 December 2013
PMI Revision 00
76
THANK YOU
25 December 2013
PMI Revision 00
77