You are on page 1of 34

Kraft Information Systems

Stability Studies
Overview, Setup, Setup, Creation,
Special Scenarios and Opportunities

August 2009

Kraft Information Systems

Agenda

Kraft Information Systems

Background
Stability Study:

The objective of a stability study is to determine the shelf-life, the


time period of storage at a specified condition within which the
product still meets its established specifications.

The business need for stability studies:


Consumer Products Industry
Expiry date determination
Keeping quality tests of daily production batches
Retest samples (in case of complaints)

Kraft Information Systems

Stability Study
Roles & Responsibilities

Kraft Information Systems

Setup Stability Study


Overview

Kraft Information Systems

Setup Stability Study


Transactions
Plant

SAP
Competency
Center

Plant

Kraft Information Systems

Setup Stability Study Steps


1. MM02
1.

Inspection Types 16, 1601, 1602, Z89NA006

2. QP02 Create Inspection Plan


3. IP11 Strategy
4. CWBQM Inspection Plan, Strategy (Header), Maint. Package
(Operation)
5. QST09 Create Building Block

Kraft Information Systems


Material Master
MM02
Inspection type setup for stability studies in the material master:
16, 1601, 1602, Z8NA006

Kraft Information Systems


Create Insp Plan
QP01
Task list for Stability Study
Inspection Plan Group Y* for
Stability Studies

Naming convention:
Y+plant+XXX where XXX is the
shelf life padded by leading 0.

Kraft Information Systems


Strategy
IP11

10

Kraft Information Systems


Strategy
IP11

11

Kraft Information Systems


Create Linkages
CWBQM

12

Kraft Information Systems


Building Blocks
QST09

13

Kraft Information Systems

Material Master

14

Kraft Information Systems

Create Stability Study


The end user process for day to day creation of stability studies.

15

Kraft Information Systems

Create Stability Study


Transaction QM01

Type QM01 and enter or


Select from Favorites

Kraft Information Systems

Enter QT.
Press enter.

Kraft Information Systems

1. Select the Stability Study


BB. This is the shelf
life/SLED of the sample:
- Y90
- Y95
- Y100

2. Enter:
Cycle Start (Day sample
was produced)
Material number
Plant number
3. Click check
mark/enter

Kraft Information Systems

1. Enter batch number

2. Enter Description
3. Enter
Room temp
Meat temp
Type of sample
(routine, ext
runs, etc)

Kraft Information Systems

1. Click on create
initial sample

2. Notification/ Lab
number can be
viewed

Kraft Information Systems

CLICK on Initial
Test Inspection Lot
Creates an inspection lot
for immediate results recording
1. Click on
specify storage
conditions

2. Click on
perform test
scheduling

Kraft Information Systems

1. Click on start
study

2. Click on Ok for
print out

If the printout does not work, write the


Batch# on the box with a marker.

Kraft Information Systems

Hit the save button

Kraft Information Systems

Other Scenarios
Cancel

When you want to stop a study


Method one:
Inspection lot with results, reject, defect, cancel study
Method two:
Cancel without results

24

Kraft Information Systems

Cancel
Method 2: No results ever recorded

Only use this method if no inspection lots were created yet for
the study

If cancelling after initial inspection lot, do it from usage decision


of initial inspection lot.

If results have been entered on an initial lot or more use the


previous method to do so with a usage decision - there is a
special UD for cancelling which will record the reason why the
study was canceled.

25

Kraft Information Systems

QM02 Cancel Stability Study

Type in QM02 and Enter, or


Select from Favorites

Kraft Information Systems

Type in Notification
number

NOTE: To view Notification number go to: QM11


transaction, fill in Notification Date, Notification
type and Material # (if known), then click execute
to view Notifications

Kraft Information Systems

Click on Notification box

Kraft Information Systems

Under Action
box, click on
Cancel Study

Kraft Information Systems

1. Click Yes

Kraft Information Systems

1. Click on the Save icon

2. The Study status is now


indicated as canceled as
displayed next to the blue
exclamation mark.

Kraft Information Systems

Other Scenarios
Age Based Dynamic Specifications

8333 Kirksville Example

Different specifications based on age of sample

32

Kraft Information Systems

Reports
BI Reports

ECC Reports

33

Kraft Information Systems

Suggested Improvements

34

You might also like