Introduction
Levelling
General term applied to any of the various
processes by which elevations of points or
differences in elevation are determined.
A measurement process whereby the difference
in height between two or more points that are
some distance from each other can be
determined.
Introduction
Levelling
Introduction
Levelling
Levelling is done when we need to :
Establish new vertical control (Bench Mark or
Temporary Bench Mark).
Determine the heights of discrete points.
Provide spot heights or contours on a plan.
Provide data for road cross-sections or volumes of
earthworks.
Provide a level or inclined plane in the setting out of
construction works
Introduction
Levelling
Introduction
Levelling
Introduction
Levelling
Levelling results are used to
(i)
(ii)
(iii)
(iv)
(v)
(vi)
Contents
3.1 Terminology and
Definitions
3.2 Levelling Equipment
3.3 Theory of Levelling
3.4 Forms of Levelling
3.5 Levelling Procedure
3.6 Errors in Levelling
Level line
through A
Ground surface
Vertical at A
Elevation
The vertical distance from a vertical datum,
usually MSL, to a point or object.
If the elevation of point A is 244.95 m, A is
244.59 m above its adopted datum.
Level.
Tripods.
Levelling staff or rod.
Rod level.
Arithmetical check
A check made in order to check that the
readings are properly booked or entered in
their correct respective column.
Can also be done for correct calculation of
R.L..
= BS FS
= BS IS1
= IS1 FS
= IS1 IS2
Arithmetical check :
BS FS =
Rise Fall
R.L. of BM + BS
HI FS
Arithmetical check :
BS FS =
Rise Fall
= Last R.L. First R.L.
BS
IS
FS
Rise
Fall
0.85
0
1.50
0
0.65
Reduced
Level
Remarks
0.650
Bench Mark A
BS
IS
FS
2.400
1.800
HPC
Reduced
Level
Remarks
207.900
205.500
Peg A
206.100
Peg B
Change points
At any CP, the level staff must be held on exactly
the same spot for both FS and BS.
Human deficiencies