Presentation
On
ASHUGANJ POWER STATION COMPANY LTD
(APSCL)
Presented ByAbdulla Al-Amin(2010-2-80-019)
Omar Faruq (2010-2-80-018)
Md. Rejaul Hassan (2011-1-80-064)

Contents
Company Profile (APSCL)
Generator
Steam power plant
Substation
Combined Cycle Power Plant (CCPP)
Conclusion

Company Profile (APSCL)


APSCL is one of the largest power station in Bangladesh.
Location: 90 km North-East of Dhaka on the left bank of the river

Meghna.
Installed Capacity : 687MW
Present de-rated capacity : 671 MW
Number of Generation Units: 7 (5 Steam Turbine + 1 Gas Turbine +
1 Gas Engine)
Area of Land: 263.55 Acres
Mission
To increase the Capacity to 1500 MW by 2015.

Vision
To become the leading power generation company in Bangladesh.
3

Generator

Generator
It is a device which converts mechanical energy to electrical energy
Equipment's of Generator
Rotor
Stator
Slip ring
Carbon brush
Working Principle
When a magnetic flux cut a conductor than an electromotive force
(emf) is induced according to Faradays laws of electromagnetic
induction.
This e.m.f. causes a current to flow if the conductor circuit is
closed.
4

Steam Power Plant


A plant using steam as prime movers to drive electric

generating apparatus called steam power plant.


Unit number

Rated capacity

Unit-1

64MW

Total capacity

128MW
Unit-2

64MW

Unit-3

150MW

Unit-4

150MW

Unit-5

150MW

450MW

Fig: Steam power plant at


APSCL

Steam Power Plant


Main sectors

Water treatment plant


Boiler
condenser
Turbine

Fig: Water treatment


plant at APSCL

Fig: Boiler at APSCL

Fig: Condenser at APSCL


6

Substation
Equipments
Transformer
Circuit Breaker
Relay
Lightning Arrester
Wave trap
Control Room
Battery and Battery charger room
Transmission Line
Bus bar

Substation (Continued.)
Transformer
Power transformer

Changes voltage level


but power and frequency
remain constant
Current Transformer
(CT)
o Steps down the current
Potential Transformer
(PT)
o Steps down the voltage
Fig.: Current Transformer Fig.: Potential
o

Transformer

Substation (Continued.)
Circuit Breaker
Oil Circuit Breaker
Air Blast Circuit Breaker
SF6 Circuit Breaker

Fig.: Oil Circuit Breaker

Fig.: Air Blast Circuit

Fig.: SF6 Circuit Breaker

Substation (Continued.)
Relay
Lightning Arrester
o Rod gap
o Horn Gap

Fig.: Lightning Arrester

Wave trap
Control Room
Fig.: Control Room

Fig. : Wave trap

CCPP (Continued.)
Gas Turbine Units
Diesel engine
Torque converter
Flame detector
Compressor
Combustion
Chamber
Diffuser
Air intake filter

Fig.: Block diagram of a gas turbine power plant

CCPP (Continued.)
Steam turbine unit
Waste Heat Recovery Unit
Benefits of Waste Heat Recovery Unit

Pump used in CCPP


Boiler feed pump
Cooling water pump

Fig.: Boiler feed pump

CCPP (Continued.)
Protection and Control
System of CCPP
Lube oil system
Governor or Speed Control
Cooling System
Pressure control system
Temperature control system
Vibration control system

Fig. : Lube oil cooling plant

Conclusion
Problem Faced
Unable to see megger test
Recommendations
The time period should be increased to 90 days for
Internship program.
Conclusion
We gathered practical knowledge