Contents
Company Profile (APSCL)
Generator
Steam power plant
Substation
Combined Cycle Power Plant (CCPP)
Conclusion
Meghna.
Installed Capacity : 687MW
Present de-rated capacity : 671 MW
Number of Generation Units: 7 (5 Steam Turbine + 1 Gas Turbine +
1 Gas Engine)
Area of Land: 263.55 Acres
Mission
To increase the Capacity to 1500 MW by 2015.
Vision
To become the leading power generation company in Bangladesh.
3
Generator
Generator
It is a device which converts mechanical energy to electrical energy
Equipment's of Generator
Rotor
Stator
Slip ring
Carbon brush
Working Principle
When a magnetic flux cut a conductor than an electromotive force
(emf) is induced according to Faradays laws of electromagnetic
induction.
This e.m.f. causes a current to flow if the conductor circuit is
closed.
4
Rated capacity
Unit-1
64MW
Total capacity
128MW
Unit-2
64MW
Unit-3
150MW
Unit-4
150MW
Unit-5
150MW
450MW
Substation
Equipments
Transformer
Circuit Breaker
Relay
Lightning Arrester
Wave trap
Control Room
Battery and Battery charger room
Transmission Line
Bus bar
Substation (Continued.)
Transformer
Power transformer
Transformer
Substation (Continued.)
Circuit Breaker
Oil Circuit Breaker
Air Blast Circuit Breaker
SF6 Circuit Breaker
Substation (Continued.)
Relay
Lightning Arrester
o Rod gap
o Horn Gap
Wave trap
Control Room
Fig.: Control Room
CCPP (Continued.)
Gas Turbine Units
Diesel engine
Torque converter
Flame detector
Compressor
Combustion
Chamber
Diffuser
Air intake filter
CCPP (Continued.)
Steam turbine unit
Waste Heat Recovery Unit
Benefits of Waste Heat Recovery Unit
CCPP (Continued.)
Protection and Control
System of CCPP
Lube oil system
Governor or Speed Control
Cooling System
Pressure control system
Temperature control system
Vibration control system
Conclusion
Problem Faced
Unable to see megger test
Recommendations
The time period should be increased to 90 days for
Internship program.
Conclusion
We gathered practical knowledge