You are on page 1of 20

STM

Quality
Limited

7 Wastes

TOTAL QUALITY MANAGEMENT

7 Wastes

Power Solutions
ABSL
STM Quality
Limited

Waste

STM
Quality
Limited

How often have you used the


expressions:
That was a waste of time!
or
That was a waste of money!
or
That was a waste of effort!
STM Quality Limited

Wasted Time

Just imagine if
we could
collect all the
time together
that we have
wasted in the
past How much time
would that be?

STM
Quality
Limited

STM Quality Limited

Wasted Money

Just imagine if we
could collect all
the money
together that
we have wasted
in the past How much
money would
that be?

STM
Quality
Limited

STM Quality Limited

Wasted Effort

Just imagine if
we could
collect all the
effort together
that we have
wasted in the
past How much effort
would that be?

STM
Quality
Limited

STM Quality Limited

The Problem With


Waste

STM
Quality
Limited

The problem with wasted time,


money & effort is:
When its gone
- its gone!

STM Quality Limited

Eliminating Waste

STM
Quality
Limited

So what can we do to

eliminate waste?

We first need to identify what

is & is not waste, then we can


look at ways of eliminating or
at least reducing waste.
STM Quality Limited

Identifying Waste in the


Workplace

STM
Quality
Limited

Operational Activity
Value added Operations
Any process that changes the nature,
shape or characteristic of the product
in line with customer requirements
e.g. Pressing, welding, heat treatment.
This is where we make a profit!
STM Quality Limited

Identifying Waste in the


Workplace

STM
Quality
Limited

Operational Activity
Non-Value added Operations
Work carried out which is necessary
under current conditions, but does not
increase product value.
e.g. Inspection, tool change,
maintenance.
This is where we make a loss!
STM Quality Limited

Value Added and


Non-Value Added operations

STM
Quality
Limited

The objective is to raise the ratio of

Value added operations to non-value


added operations and eliminate waste.
OPERATOR TIME
WASTE

NON-VALUE ADDED

VALUE
ADDED

ELIMINATE

MORE TIME FOR


OTHER ACTIVITIES

NON-VALUE
ADDED

VALUE
ADDED

STM Quality Limited

7W The Elimination of
Waste

STM
Quality
Limited

So, now we understand the

difference in value added & nonvalue added operations, what are the
benefits in eliminating all waste?

Reduced costs
Greater Capacity
Bottlenecks are identified
STM Quality Limited

7W 7 Types of Waste
1 Over-production

STM
Quality
Limited

2 Inventory
3 Transportation

4 Process
5 Idle Time
6 Operator Motion

7 Bad Quality
STM Quality Limited

7W 1. Overproduction
Over-production

STM
Quality
Limited

Producing more than is needed hides a

multitude of problems. Excessive set-up


times, machine faults, risk of producing
obsolete stock.
STM Quality Limited

7W 2. Inventory

Inventory

STM
Quality
Limited

Carrying stock attracts cost & storage

problems. Storage leads to stacking,


racking, sophisticated computers, bar
coding & automation, all for an activity
that adds no value to the product.
STM Quality Limited

7W 3.
Transportation

Transportation

STM
Quality
Limited

This may appear unnecessary but does add

value. Large transport is easily identified but


small transport such as manual labour may
not be so noticeable. These can be improved
by changes to the work environment.
STM Quality Limited

7W 4.
Process

Process

STM
Quality
Limited

Adds cost but no value - e.g.trimming &

moulding to a level that is beyond the


required standard adds extra time that
customers do not want to pay for.
STM Quality Limited

7W 5. Idle
Time

Idle Time

STM
Quality
Limited

Typically, waiting for products & services

from preceding operations, waiting for


work from their previous set-up or
waiting for cycles to finish, or meetings
to start.
STM Quality Limited

7W 6. Operator
Motion
Operator Motion

STM
Quality
Limited

Typically, single handed operations

where both should be used, stretching


unnecessarily or awkwardly and walking
between things. All of these take time or
use time poorly, none add value.
STM Quality Limited

7W 7. Bad Quality

Bad Quality

STM
Quality
Limited

Rejects are always produced by systems

and procedures created by management.


If operators fail it is because the process
allowed them to fail through inadequate
training or because the process was not
capable in the first place.
STM Quality Limited

STM
7W The Elimination of
Quality
Waste
Limited
So, now we understand the 7 wastes, we
can:
Produce only what is needed;
Carry only essential stock;
Use transportation more wisely;
Produce work to the standard required;
Plan our production processes;
Put our efforts to the best possible use;
Train to make quality work every time!
STM Quality Limited