Development
of Mongolian
Railway
MONGOLIAN RAILWAY
SOSC
CONTENTS
1 NEW RAILWAY
2
PROJECT
2. BOGDKHAN RAILWAY AND ULAANBAATAR
MULTIMODAL TRANSPORT AND LOGISTICS HUB
PROJECT
MONGOLIAN RAILWAY
SOSC
THE NEW MONGOLIAN RAILWAY PROJECT WOULD PROVIDE ACCESS TO GLOBAL SEABORNE
MARKETS VIA SEAPORTS IN CHINA AND RUSSIA, THUS ALLOW HIGHER MARGINS FOR
MINERS
MONGOLIAN RAILWAY
SOSC
MONGOLIAN RAILWAY
SOSC
Own and manage railway sector property created by the state investment;
In early 2013, the Government of Mongolia (GOM) granted the built-operate-transfer (BOT) concession right for
approx. 1800 km of railway infrastructure (New Railway Project or Project) as per the State Policy on Railway
Transportation of Mongolia (2010) to Mongolian Railway State Owned Shareholding Company (MTZ)
MONGOLIAN RAILWAY
SOSC
MTZ has been granted the concession right to develop, construct, finance and operate
approx. 1800 km railway as per Phase 1 and 2 of the State Rail Policy
MONGOLIAN RAILWAY
SOSC
SOUTHLINE CONSTRUCTION
STATUS
EPC Contractor
Samsung C&T
Owners Engineer
Deutsche Bahn
International
Length
Earthwork
Subcontractors
Construction Duration
Axle load
Major Structures
Throughput Capacity
Manpower & Equipment
MONGOLIAN RAILWAY
SOSC
225 km
13 local company
2013-2016
25 ton
2 stations
5 passing sidings
16 bridges /1356 m/
126 culverts
8 animal passes
30 Mtpa
Over 1000 personnel
Over 400 equipment
27,8%
51,84%
22,04%
2%
2012
Description
2013
2014
Total
Total work
Civil work
Completion
Percentage
Earthwork
Bridge work
Culvert work
11 634 560 m3
1356.23 m
134 no.
Track wor k
10 075 528,96 m3
715.54 m
69.76 no.
86.6
52.76
52.06
Ballast
Fastener
802 880 m3
1 062 674 set
280 499.37 m3
52 177.29 set
34.94
4.91
MONGOLIAN RAILWAY
SOSC
EASTLINE PROGRESS
FEED work :
WORKS IN
PROGRESS
1 Field Study
2
3
Front-End Engineering
Design
/FEED/
Tender
Document
MONGOLIAN RAILWAY
SOSC
PERFORMANC
E
100%
Completed in Q2,
2014
Completed in Q2,
2014
Completed in Q2, in
Q2 2014
Signaling &
Telecommunications, Rolling
Stock, Building & Depot
Completed in
in Q2 2014
Tender documents
Completed in
in Q2 2014
100%
100%
PROJECT STRUCTURE
From debt financing perspective: several SPVs respectively for different sections
Given the size of the Project as well as different development status across Projects different sections (i.e. ongoing construction on the 267km Southline, with the remaining sections under technical studies), it is envisioned
to rescale the whole Project into more manageable and less complex individual sub-Projects which are to be
developed under several SPVs
From equity financing perspective: same sponsors for the overall Project
It is envisioned to have same sponsors with consistent shareholding percentages across all the SPVs of the
Project. One way to achieve this is illustrated by the chart below (i.e. the number of SPVs is indicative only):
Investors
MTZ
[51]
%
Equity
Financing
Debt
Financing
[49]%
SPV
100%
SPV 1
Lenders of
SPV 1
MONGOLIAN RAILWAY
SOSC
SPV 2
Lenders of
SPV 2
SPV 3
Lenders of
SPV 3
10
MONGOLIAN RAILWAY
SOSC
MONGOLIAN RAILWAY
SOSC
CONTENTS
1 NEW RAILWAY
2
PROJECT
BOGDKHAN RAILWAY AND ULAANBAATAR
MULTIMODAL
TRANSPORT AND LOGISTICS HUB PROJECT
MONGOLIAN RAILWAY
SOSC
13
MONGOLIAN RAILWAY
SOSC
Rashaant
Station
Ulaanba
atar
Existing Railway
167 km
Bogdkhan Railway
149.1 km
New Airport at
Khushigt
Valley
Maanit
Station
MONGOLIAN RAILWAY
SOSC
UB Logistics
Terminal
New Airport
AH-3 Highway
BOGDKHAN Railway
Ulaanbaatar Logistics Multimodal Transport and Logistics Hub Project will be located at the junction of Bogdkhan
Railway,
AH-3 Highway and New Airport Project, making a new hub project.
MONGOLIAN RAILWAY
SOSC
SIGNIFICANCE OF
PROJECT
Publi
c: problem
Railway:
Decreased
in
the
traffic
Ulaanbaatar city;
for city resident
Increased material will be s
(hazardous
safety
transported
on the railway bypass line);
Soil, Noise and air pollution will
be significantly reduced;
New public transportation route will
be created.
Greater throughput
capacity;
cost
of
Lesser
maintenance
infrastructure and
rolling
stock;
Higher
of
the
railway
speed
design.
transportation
due to
better
PROJECT
Transport and
Logistics:
MONGOLIAN RAILWAY
SOSC
Intensified
traffic
flow
on
railway, highway and airport;
Complex transportation system
to distribute goods and cargos will
be developed;
Greater
ability
of
warehouse
storage service.
CURRENT PROGRESS
Bogdkhan Railway:
GOM approved the implementation of the project.
Alignment has been studied;
Initial financing for the Technical Assistance has been settled between the GOM and Asian
Development Bank.
Ulaanbaatar Multimodal Transport and Logistics Hub Project:
GOM approved the implementation of the project;
Initial financing for the Technical Assistance has been settled between the GOM and Asian
Development Bank;
Master plan of the National Logistics has been developed;
Master plan of the Ulaanbaatar Logistics Center has been prepared;
Guidance of Ulaanbaatar Multimodal Transport and Logistic Center was developed;
Land permit was approved.
MONGOLIAN RAILWAY
SOSC
THANK
YOU
Union Building, 1411, floor, Narnii zam62 Ulaanbaatar 14230, Mongolia
Phone:
(976) 70006622
(976) 70007722
Fax:
(976) 70106644
MONGOLIAN RAILWAY
SOSC
E-mail:
info@mtz.mn
Website:
www.mtz.mn
19