Water Supply under CSR

1. Piped
water
supply
scheme
for
19nos
peripheral
villagesofTalchercoalfields has been implemented at a cost of Rs 22.24
Crores.
a) The source of water is River Brahmani and after being treated at
IWSS, Talcher, the water is being supplied to the villagers.
b) The no. of beneficiaries is 33600 of 19 nos. of villages.
c) The proposal of WTP of 1 MGD capacity using under ground mines
water is under active consideration.
d) This WTP will cater the need of water of approximately 33500
people of the peripheral villages (considering 135 ltr per capita per
day)

Water Supply under CSR


1. 3 Nos. Piped water supply scheme for 35 peripheral villages of Talcher
Coal fields amounting to Rs.56.89 Crore has been taken up through RWSS,
Talcher ( Rural Water Supply and Sanitation Department, Govt . Of Odisha,
Talcher) (Villages covered under the above Scheme are Kandhal and its
adjacent villages , Kamarei, Jarada, Badataribada, Badagunduri and its
adjoining villages under kaniha Block, Chandrabiland its adjoining
Villages under Kaniha Block of Angul District ). An amount of Rs.56.89
Lakh has been deposited to Collector, Angul for preparation of DPR.
a) The source of water is River Brahmani and RWSS ( Rural Water
Sup[ply & Sanitation Department ) is the executing Agency and
the treated water will be supplied to the villagers.
b) The no. of beneficiaries is 47500 of 35 nos. of villages.

Water Supply under CSR


1. Improvement of Water Supply System including Water treatment
plant at Burla, Sambalpur amounting to Rs.8.62 Crore. An amount
of Rs.3.50 Crore has been deposited to Collector, Sambalpur and
the work is under progress.
2. Water supply scheme for Brajrajnagar town at Jharsuguda
amounting to Rs.8.88 Crore. Already an amount of Rs. 4.44 Crore
has been deposited with Collector, Jharsuguda.
3. Renovation of Soubbhagya Sagar a Big Tank of Talcher Municipality
has been taken up amounting to Rs. 3.22 Crore and work is in
progress.

Water Supply under CSR


Apart from above mentioned major
water supply projects, Water made
available to the doorstep of peripheral
villagers through mobile tankers during
summer every year. On an average
Rs.5.00 crore per annum is being
spent.

Year
2010
2011
2012
2013
2014

Amoun
Villag Municipali t spent
es
ty Wards
in
Lakhs
260
21
329.32
410.62
272
18
260
21
349.79
260
21
589.14
262
21
542.41

Water Supply to MCL Colony


Sl
.N Location
o

District

Total
Qtr
(in
Nos.)

Total
Employ
ees(in
Nos.)

Water
Dema
nd in
MLD

Capacity of
Water
treatment
plant in MLD

IB Valley &
Orient Area

Jharsugu
da

5443

6021

7.35

9.98

Lakhanpur &
CWS IB

Jharsugu
da

1957

2250

2.64

7.26

BG Area

Sundarga
540
rh

878

0.73

7.26

Talcher
Coalfields

Angul

12487

11.26

49.19

of Water
5 Source
MCL HQ
Source of Water
Source
Totalof Water
Source of Water

8339

Sambalp
Jharsuguda 613
District 771
ur
Sundargarh District Angul District
16892 22407
Sambalpur District -

IB0.83
river Treated
0.54 water
Basundhara
river
of standard
Brahmani
river
22.80 quality
74.25is
Mahanadibeing
river
supplied to all

Major Road Projects of MCL under


CSR

Widening of two lane Road of Four lane road (27 Km length) from
Bankibahal in BG Area of MCL to kanika Railways Siding in
Sundargarh amounting to Rs.266.50 Crore has been taken up as
deposit work through PWD,Govt of Odisha. An Amount of Rs.28.81
Crore has already been deposited and the tender is under
finalisation.

Construction Byepass Road at Ujjalpur in Sundargarh Lepripara


Road (MDR 27) under Basundara Garjanbahal Area amounting to
Rs. 18.589 Crore. An Amount of Rs.4.73 Crore has already been
deposited and the tender is under finalisation.

Construction of Road Over Bridge (ROB) near Ghantapada Village,


Talcher amounting to Rs.28.65 Crore and tender has been
finalised.

Construction of Service Bridge over Power Channel of Mahanadi


River at Burla, Sambalpur amounting to Rs. 10.00 Crore.