Factory Precaution
Double packing (plastic bag+carton box)
Factory Precaution
Double packing (plastic bag+carton box)
Site Recommendation
Apply rain coat after installation each day
Proper Storage
Site Storage
Wetted Floor
7
6. Installation Procedure
Video of Installation (about 8 minutes)
10
Missing Link
11
Missing Link
12
Contractor-Supplier Interaction
Project Start
Technical support
and routing deisgn
AutoCad Drawing
Installation support
Project
Management
Support
BRASS and
manufacturing
instruction
Fabrication
13
Release of Locknut
14
15
16
17
18
19
20
21
22
Routine Inspection
Insulation test recommended by NEMA
Check at least 1 per year
Check after electrical short circuit or ground
fault
Visual inspection on joints and terminals
Remove damp or clean dust when necessary
Check tighten torque of joint bolt if necessary
Check any cracks, loosen/ broken parts
23
Trouble Shooting
Recommend spare parts
1 pair of flanged ends for each busduct
rating used
A number of plug-in units
24-hours services hotline provided by
Schneider Busway
Contact local Schneider office
24
End of Presentation!