PERIODICAL MAINTANANCE
TARGETS IN OUR
ASSESSMENTS
Give an Overview of current scenario of the
system
Clear Identification of weak points
Proposal for specific inspections to identify the
problem and necessary
Rough overview of necessary repair /
modernization scope
TARGETS IN OUR
ASSESSMENTS (Contd)
To identify deterioration in the insulation due to
aging or poor maintenance
To evaluate the reliability, efficiency and safety of
the equipment
Based on the evaluation, Utilities can develop a
strategic replacement plan for particular
equipment in such a way to avoid an un expected
failure and minimize the risk
PLANNING METHODOLOGY
Site Study, Collection of factory test data, History of
faults was happened and assessments of general
view in impact of the faults
Finalization of action plan for carrying out detailed
study and tests.
Preparation of testing program schedule and send to
the customer for getting approval.
Made the test procedure, test formats and get the
approval from the client end.
Executing the test according to the program
schedule
SAFETY ACTIONS
Electrical Specimens had been isolate from other
electrical equipments and from the induction
using temporary earth switches and verify with
induction tester.
Get the approval for Dos & Donts before
conducting the tests.
Engineers had been ensured their safety
assessments of wearing the helmets, Gloves,
Goggles & Safety Shoes.
1.Routine tests
1.1
1.2
1.3
1.4
1.5
1.6
3.Oil Test
3.1
3.2
3.3
3.4
Physical Properties
Dissolved Gas Analysis
Furan Analysis
Sulfur Content test
4.Performance Evaluation
test
4.1
4.2
4.3
4.4
4.5
4.6
Harmonics
Power Consumption
Form Factor
Corrected no load loss
Core loss @rated voltage & frequency
Core loss @actual Voltage & frequency
5.Functional Protection
Checks
5.1 Pressure Relief Valve (N.O/N.C) Check
5.2 Buchoulz relay Simulation.
5.3 Winding temperature Indicator Calibration
5.4 Oil Temperature indicator calibration
5.5 Resistance Temperature detector Checks up to
remote End.
5.6 OLTC Motor test
Functional Protection
Checks (Contd..)
5.7 OLTC Scheme Verification
5.8 Cooling Fan Verification
5.9 Ammeter, Voltmeter & VA meter Calibration
5.10 Cable healthiness in the Control Cubicle for the
transformer.
6.Protection tests
6.1Stability of Differential & REF of transformer by
using Single Phase Secondary injection/ Three
Phase Injection
6.2RTCC Scheme Check (Depends upon the
Possibilities)
SURGE ARRESTOR
OUR STRENGTHS
Having a own Service department for the power /
distribution Transformers.
Life calculation for the transformers.
Time consumption was less for the work in the
field and report assessment .
Report justification or review will taken from the
experts.
Mutual discussion will made with customers.