PROJECT BRIEF
Contract Title
Client
Project Cost
RM 109,000,000.00
Date Of Site
Possession
15 June 2010
Date Of Completion
KEY PLAN
CH
CH
2+
80
0
6+
70
0
SK
VE
LAYOUT PLAN
2
CH
+80
CH6+
70
PROJECT BACKGROUND
The proposed PIRR is a dual 2 lane
carriageway
Total length is 3.9km
Located beside and along riverside of
Pulau Indah and to be constructed on soft
alluvium deposits
GENERAL GEOLOGY
Proposed site is predominantly located at the alluvium
deposits (according to the Geological Map of Selangor, Sheet
93 1975 published by Minerals and Geoscience Department)
Geological Map : The alluvium was deposited during the
Quarternary period.
The alluvium deposit mainly consists of very soft to soft
Silty CLAY and clayey/sandy SILT with the presence of sand
ans sea shells.
Below the topsoil is a layer of very soft to soft compressible
clay, which has been described as MARINE CLAY. This soft
clay is light grey in colour and varies from very soft to very
stiff silty CLAY to sandy CLAY.
General
Geology of
Proposed Site
Subsurface investigation
BOREHOLES
37 Nos
PIEZOCONES
15 Nos
279 Nos
LABORATORY TESTS
Subsoil Condition
Depth of boreholes form the existing ground surface
ranges from 60m to 70m
Most of the subsoil condition shows thin layer (<5m
thick) of sandy material on top of the existing ground
levels throughout the mainline, indicating previous fill
First top 30m to 45m of the subsoil consists of
relatively soft overburden materials with SPT-N value
<5 with intermediate layers of thin sand lenses
SPT-N increased gradually with depth
No bedrock layer detected or encountered until down
70m below existing ground level
SUMMARY OF SUBSOIL
CONDITION
Undrained Shear
Chainage
Subsoil Condition
Ch5475
Ch6400
Ch6400
Ch7500
Strength
Main Concern
3m
to
4m 8kPa for top 2m Long
term
SAND layers
subsoil at soil consolidation
Compressible area
settlement
and
layer
short
term
thickness
embankment
about 35m to
stability
40m
1m
to
2m 6kPa to 8kPa for
SAND layers
top 2m subsoil at
Compressible soil area
layer
thickness
about 30m
Long
term
consolidation
settlement
and
short
term
embankment
stability
SUBSOIL PROFILE
COMPRESSION RATIO
RECOMPRESSION RATIO
COEFFICIENT OF CONSOLIDATION
PVD DESIGN
PVD DESIGN
CONSTRUCTION DRAWING
INSTRUMENTATION
TAKING OFF
MATERIAL SPECIFICATION
INSTALLATION PROCEDURE
PHOTOS
Photo 2
Photo 1