Professional Documents
Culture Documents
Stores Modulet
Stores
Stores or warehouses are very important for project based industries
as these are the places where all the materials and required tools are
stored.
Material transfer, inward and outward flow of material takes place
everyday and thus there is a requirement to track all this flow of
material in order to avoid any material loss.
Nfra allows you to manage the Inventories of the Central Warehouse
and also all inventories at the site.
NFRA allows user to easily handle and manage all this, ensuring that
minimal or no loss is incurred.
Stock details
This portal of NFRA allows user to update the opening stock information.
The Stock update for Central Warehouse and Project Site can be updated
from here.
The user can check the stocks in multiple warehouses as well as multiple
project sites.
For the ease of having knowledge of all stocks, the stocks can be checked
against different categories and type.
4
INDENT
User is able to add or view previously added items for indent.
The items can be added directly, Maerial Take Over wise, MRV wise or
Plan wise.
The items are displayed with their name, reference, available, intend
stock and the date by which they are required.
Expected delivery date is also displayed with a provision to edit or
delete the items at any point of time.
This window provides with the details of items that are expected
to be delivered at site or warehouse.
In addition to PO number, it provides detail with supplier name,
address and the project name foe which the item is being
procured.
The item pending for GRN is displayed below with order, balance,
received, rejected, pending and accepted quantities.
7
GRN
GRN in eresource can be done ONLY
against the Purchase ORdre issued to the
supplier.
Acceptance of extra Material or Extra
Quantity which is not in the Purchase
Order, can be received only after the
approval of the GRN.
The invoice number and date are updates
along with gate pass number and date.
Optional information that can be added for
more and to prevent any future problems,
one can add the transport number and
transport name.
All the quantities that were not updated
while the GRN was pending are updated
here.
8
For the material requisition generated a material issue voucher is generated for
approval.
This screens shows all the material that is pending to be issued to the Project site.
The Mateiral Issue (material Outward) can happen only against the Material
Requsistion
This window shows the MRV number and from where the material is being issued
i.e. stock, grn or stock transfer and from which warehouse.
The BOQ details are also available in order to determine for which activity the
MRV is generated along with details of item required and its quantity.
9
10
Material Issue/ Delivery Order can be generated only against the Material
Requisition from the site.
This window displays the approved material issue voucher.
From the name of person to whom the material is handed over, transporter
number and road permit number every detail is visible.
Firstly the detail of BOQ is displayed for which the items are required and
then the item details are displayed which is being issued.
11
Stock transfer
Similar to the stock transfer from material inwards, this portal is for
stock transfer between the sites.
Material can be transfered from 1 site to another site
Material can be transfered from the site to the central warehouse.
Material can be transfered from Central Warehouse to the Site
Location.
12
stock transfer
13
14
15
Store report
Store Status
Supply Demand
Item Ledger
Material Consumption
Tools tracking
Inward Outward Register
GRN Replace
Stock Valuation
16
conclusion
eresource provides a comprehensive configuration of
Inventory Management for different location. This location in
eresource is referred to ONSITE Location, Warehouse and
Stores. The warehouse management processes built in
eresource ERP system allows the inventory in the
organization to always be up to date and correctly valued.
http://www.eresourceerp.com
http://nfra.eresourceerp.com
17