The use of Cured In Place Pipe (CIPP) for the rehabilitation of pressures
mains has been employed since the 1980s. During this period Japanese gas
companies decided, in view of the frequent earthquakes in their country, to
use the CIPP concept to secure their pipeline networks.
In 1984 Norditube, a CPT company, developed TUBETEX, an
interactive CIPP liner for the lining of partially deteriorated low pressure gas
mains or for medium pressure water mains. Since this development more
than 2,600 kilometres have been installed over 20 years, confirming the
long term durability of lining with this product.
To meet the new requirements of authorities, who wish to create a New
pipe within an old one, CPT has developed two new liners for the pressure
pipe relining market:
An interactive liner, used mainly for medium pressure gas mains (up to
PN 32), and
An independent liner, used mainly for high pressure water mains
(between PN 20 and 60).
It is becoming increasingly common that the rehabilitation of high
pressure pipelines is being sought after, rather than going through the
expense and inconvenience of replacement.
CIPP relining for high pressure pipe
Since 1980 diverse interactive CIPP liners were developed for the
rehabilitation of pressure pipe:
For low pressure gas main (100 mbar)
For medium pressure gas main (6 bar with extension to 32 bar in
Germany)
For water medium pressure pipe (7bar)
2600 kilometres installed at the end of 2005 confirms the long term
durability of this CIPP rehabilitation system.
Due to technical evolution, at the present time, 2 types of CIPP liners
are available on the market.
The Interactive solution, mainly used for the rehabilitation of high
pressure gas main (up to 32 bar), transfer the internal pressure to the
existing pipe and do not withstanding the total external load (like TUBETEX
supplied by Norditube a CPT company)
The Independent solution, mainly used for the rehabilitation of water
pressure pipe (up to 60 bar), withstanding the total internal and external
load without considering the host pipe (like Nordipipe - supplied by
Norditube a CPT company)
Products - Design
Nominal pressure
resistance following burst
pressure test (see Figure
8)
Approvals
In case of drinking water pipe rehabilitation, this type of liner complies with
the requirements of the main Water Authorities.
At present for example:
Canada (Qubec) BNQ agreement
UK Water Regulation Advisor Scheme (WRAS) test of effect on water
quality BS 6920
Hong Kong BS 6920
Austria Austereiche Hygiene Institut
Case Studies
This paper present three project highlight the application of the technology throughout
the diverse environments of Asia, Europe and North America
Hong Kong
Completed January 2005
Contractor CPR
Duration 2 week
Length and Diameter 600m of 600 mm diameter, in 3 sections
Service Pressure 15 bar
Test Pressure 22 bar
For this job site, the cleaning was made by water high pressure jet (1000 bar), the
impregnation of epoxy resin on site, the liner eversion by air and the curing by steam.
The pipe end finishing where made in this case with rubber gasket bounded with
Stainless steel strips. The reason of this type of finishing is to protect the edges of the
installed liner in case of mounting or dismounting, and prevent water flow between pipe
and liner after curing.
Vienna (Austria)
Completed 2005
Contractor Rabmer
Length and Diameter 3000m of 250mm diameter, in -160m sections
3300m of 200mm diameter, in -160m sections
Service Pressure 16 bar
Test Pressure 24 bar
This presentation shows the main step over:
On site epoxy resin impregnation
Air eversion and crossing through 45 bend
Pipe end finishing with steel bend without rubber Pressure test up to 24 bar
House connection directly fit on the cured liner
Case Studies (continue)
Gatinau (Quebec)
Completed October 2005
Contractor Aqua Rehab
Length and Diameter 300m of 250mm diameter (140m and 160m
sections)
Service Pressure 15 bar
Test Pressure 22 bar
This presentation shows:
On site epoxy resin impregnation
Air eversion
Liner introduction, eversion and curing condition
Conclusions