You are on page 1of 10

SEMINAR

KERJA PRAKTEK
PT. PLN (Persero) PLTU 2 Jateng Adipala Cilacap
PENGASUTAN DIRECT ON LINE PADA MOTOR FUEL
OIL SYSTEM
PLTU 2 JATENG ADIPALA CILACAP 660 MW
Editor : Dwiki Firman Nugroho
Ferdian Prasetyo
PT PLN (PERSERO)
UIP JBTB II
UPP KIT JBTB 4
PLTU 2 JATENG ADIPALA CILACAP 1
x 660 MW
TUGAS DAN
TANGGUNGJAWAB
PLTU 2 JATENG ADIPALA CILACAP
SISTEM PEMBANGKITAN
PADA PLTU 2 JATENG ADIPALA
CILACAP
1 x 660 MW
SIKLUS KERJA
PLTU
SUPERCRITICAL ???
PERALATAN UTAMA
DAN PERALATAN
PENUNJANG
PLTU 2 Jateng Adipala Cilacap
Spesifikasi Teknik PLTU 2 Jateng Adipala Cilacap
No Item Type Kapasitas
Supercritical Babcock Wilcox Beijing B&WB-
1 Boiler 2069 t/h ; 25.4 MPa
2069/25.4-M
660 MW ; 3000 rpm ; 24.2
2 Turbin Shanghai Turbine type N660-24.2/566
MPa
776.500 kVa, 22 kV,
3 Generator Shanghai Electric Power Generation type QFSN
20.377 kA
4 Main Transformer Baoding Tianwei type SFPZ-800000 800 MVA ; 500/22 kV
5 GIS Xian XD 550 kV/5000 A
Tongkang : 12.000 metric ton ; Vessel : 35.000 Ship unloader : 2 x 1600
6 Kapasitas Jetty
metric ton; ton/jam

7 Kapasitas Coal Yard 30.000 metric ton (30 hari operasi full load)

8 Kebutuhan Batubara 8.800 ton/hari (supply dari arutmin)


APA ITU
FUEL OIL SYSTEM ???