VISHWAKARMA INSTITUTE OF TECHNOLOGY,PUNE.

MAJOR PROJECT

Manufacturing of Die

DEPARTMENT OF PRODUCTION ENGINEERING


Contents
Problem Statement
Work Done
Pending work
Difficulties
Learnt till now
Learning Process
Problem Statement
Manufacturing of a die, for a Washer (A128) and
to carry out trails.

Post trails we would also conduct time studies


and find the best and most resourceful solutions.
Work Done
Learning the design concepts and process.
Read and studied various materials of die.
Procured materials accordingly.
Parts of a die
Top back plate
Top Punch holder
Stripper
Spacer
Die
Bottom back plate
Punch
Pillars
Collars
Springs
Work Left
Precision cuttings
Assembly
Trails
Work study
Learnt till now
Performed different operations
Drilling
Grinding
Milling etc.
Tried assembly on pre existing dies
Understood basic concepts of die making
Learnt how to make Bill of materials