Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
10
WILLBROS
Hydrostatic Testing Practices
11
WILLBROS
Hydrostatic Testing Practices
Maintain and Include Raw Data Gathered into Final Test Report Book
12
WILLBROS
Hydrostatic Testing Practices
WILLBROS
Hydrostatic Testing Practices
14
WILLBROS
Hydrostatic Testing Practices
15
WILLBROS
Hydrostatic Testing Practices
16
WILLBROS
Hydrostatic Testing Practices
Hydrostatic Test Data Collection Test Start Date: Month Day, Year Test End Date: Month Day, Year Readings should be taken every 15 minutes for test
R E M A R KS : (No te any additio ns/withdrawals o f test medium, start
TIME
O B S . P R E S S UR E T EM P . T EM P . T EM P . T EM P .
17
WILLBROS
Hydrostatic Testing Practices
Final Verification
Verify that final book is complete and contains all information in one
location
Hydro Test Plan and Calcs
Test specifications
Survey data
Calibration certificates
Hydro test reports
Original test charts
18
WILLBROS
Hydrostatic Testing Practices
Final Verification
If all required data is in one place, then it is easier to gather, maintain,
and deliver to auditors
Ensure that the following people have signed off on the Test Report and
Data Collected
Field Person Responsible for Gathering Data
Field Supervisor Over Hydro Test
Construction Manager
Project Engineer
Project Manager
Client Project Manager
19
WILLBROS
Hydrostatic Testing Practices
PHMSA
Audits
Checks during construction to verify proper records being kept
Documentation is the first thing to be checked during a field audit
First impression set the tone for the audit
Record Keeping
Records should have proper approvals and signatures on them
Should be same throughout duration of project
Fabrication testing (HDDs) and Mainline testing (main pipeline)
Documentation Approvals/Signatures
Checks for field personnel, engineering personnel, and Company personnel
signatures and approvals of test records and reports
20