You are on page 1of 50

SAHARANPUR SUBSTATION

COMPREHENSIVE TRAINING MODULE CUM SS DIARY


SINGLE LINE DIAGRAM SAHARANPUR SUBSTATION
SAHARANPUR SUBSTATION EQUIPMENTS
DETAIL
Substation Equipments Population
Equipment Make 400 KV RATING

3000 A
CT AREVA 45
3000/1 TURNS RATIO
400 KV
CVT AREVA 24
400KV/110 V 3-PHASE
Isolators SIEMENS 43 420KV, 3150A
Surge Arrestors OBLUM 30 336KV SINGLE PHASE
3150A, 400KV, .5mh ,
Wave Trap AREVA 12
BW-90-150,150-500
315 MVA , 50HZ,
400/220/33 KV, 315 MVA Auto VIJAI YNa0D11 VECTOR
Transformer ELECTRICAL 2 GROUP
50 MVAR, 420KV, 68.73A,
50 MVAR Bus Reactor BHEL 2 50HZ
Substation Equipments Population

Equipment Make 220 KV RATING

1600A
CT AREVA 30 1600/1 TURNS
RATIO
220KV
CVT AREVA 24 220KV/110V 3-
PHASE
1600 A
Isolators SIEMENS 37
245KV
216 KV SINGLE
Surge Arrestors OBLUM 24
PHASE
220KV 1600A
Wave Trap AREVA 12 .5mh
PROTECTION SCHEME AND CRITICAL ALARM
SPRING
C
PLCC COMMUNICATION
OPERATIONAL PROCEDURE FOR TAKING
SHUTDOWN
SHUT DOWN PROCESS OF ANY LINE

[1]. SEQUENCE OF MANDATORY OPERATION:


(A). Avail permission codes from CPCC for Shut-down of the line & pass
on the same code to remote end or other end.
(B). Note down the system parameter of all the line such as voltage,
current,
load, frequency, PLCC status, etc.
(C). Open the main Circuit Breaker.
SHUT DOWN PROCESS OF ANY LINE
(D). Open the Tie Circuit Breaker. (If the remote end opens the
line from
their end, Main Circuit Breaker & Tie Circuit Breaker will open
automatically through PLCC direct trip).
(E). Put Auto Reclose (A/R) switch of Main & Tie circuit Breaker
in Non-
Auto position.
(F). Open the Line- Isolator.
(G). Open the Isolators of Tie- Circuit Breaker both side & Open
Isolator of
Main Circuit Breaker.
SHUT DOWN PROCESS OF ANY LINE
(H). Open the Bus- Isolator.
(I). Open Reactor- Isolator (NA for Saharanpur)
(J). Check physically for proper opening of all the Isolator done in F,G,H,I.
(K). Ensure that Line-Isolator of other end is open.
(L). Get permission from other end to Earth the Line.
(M). Close the Earth switch of the Line-Isolator and inform the other end.
(N). Ensure that the Line Is Earthed at the other end.
(O). Attach DO NOT OPERATE tag at the Main & Tie Bay CB of the
isolated bay in MicroSCADA.
(P). Inform CPCC about isolation been completed with time details.
SHUT DOWN PROCESS OF ANY LINE
[2]. ISSUE OF PTW ON INDIVIDUAL EQUIPMENT:
(A). PTW on Line: After ensuring steps [1]. (A to O) PTW can be issued to
the Line
maintenance staff.
(B). PTW on Line Shunt Reactor: Close the earth switch of Reactor
Isolator, PTW
can be issued to the maintenance staff. NA for Saharanpur S/S.
(C). PTW on Line CVT/LA/WT: After ensuring that the Line is earthed from
this end
as well as remote end, PTW can be issued to the maintenance staff.
(D). PTW on Main Circuit Breaker/ Current Transformer (CT): Close the
Earth
SHUT DOWN PROCESS OF ANY LINE
switch of both side of Isolator of CB as well as CT, PTW can be issued to the
maintenance staff.
(E). PTW on Tie Circuit Breaker/ Current Transformer (CT): Close the Earth
switch
of both side of Isolator of CB as well as CT, PTW can be issued to the
maintenance staff.
(F). PTW on Transformer (ICT)/Bus reactor: After opening of CB of both
400KV
side and 220KVSide. Open transformer isolators on both sides (400KV side
and
220KVSide) of Transformer. Close the Earth switch on both side of
Transformer, PTW
SHUT DOWN PROCESS OF ANY LINE
can now be issued to the maintenance staff.
CAUTION: It must be Borne in mind that two cores of CT are used for
BUS BAR
Protection.
..
ISOLATION IN CB LOCKOUT CONDITION
ISOLATION PROCEDURE -
Open Main & Tie CB

Ensure opening of Remote end CB on Receipt of Direct Trip from


remote end operator.

Confirm No Line Current & Voltage in isolated feeder.

Open Line Isolator & confirm Remote-end Line Isolator open from
remote end operator.

Close line Earth Switch only in case of PTW for Line Maintenance
work.

Sikar end CB opened from RTAMC/NTAMC but neither


RTAMC/NTAMC nor Agra Control Room ensured the
Current/voltage of the isolated Line.
MANUAL ISOLATION FOR STUCK MAIN CB - BUS
ISOLATION
Bus -2
Bus -1

Open Bus Main CB Main CB Bus Dead


Isolator

Open all CBs


Main CB Stuck connected to
Bus-1
Tie CB Tie CB

Feeder 1 Feeder 2 Feeder 3 Feeder 4

ISOLATE THE BUS BY TRIPPING ALL MAIN CB CONNECED TO THAT


BUS

THEN AFTER OPEN BUS ISOLATOR OF FAULTY CB


MANUAL ISOLATION FOR STUCK MAIN
CB - PARALLEL PATH
Bus -2
Bus -1

Open Bus Main CB Main CB


Isolator

Main CB Stuck

Tie CB Tie CB

Close Tie CB
Feeder 1 Feeder 2 Feeder 3 Feeder 4

IF BUS TRIPPING IS NOT FEASIBLE, CLOSE TIE CB TO PROVIDE


PARALLEL PATH. ENSURE BUS-COUPLING.

OPEN BUS ISOLATOR


DIFFERENT FEDERS AND THEIR DOC
Details of charging of elements at 400/ 220 KV SS Saharanpur
Date of Date of Power- Time of Power-
Type of element Voltage Level Name of element Time of Charging
Charging flow flow

Under NRTSS (Saharanpur New Sub-station)

ICT with Bay


400/220/
(Main Bay no-401, 315 MVA ICT-1 04.05.16 21:41 Hrs 07.05.16 17:14 Hrs
33 KV
Tie Bay no-402)

ICT with Bay


400/220/
(Main Bay no-404, 315 MVA ICT-2 04.05.16 22:33 Hrs 07.05.16 17:14 Hrs
33 KV
Tie Bay no-405)

50 MVAR Bus Reactor 1 05.05.16 18:46 Hrs 05.05.16 18:46 Hrs


Bus Reactor with Bay (Main Bay
no-410, 400 KV
Tie Bay no-411)
50 MVAR Bus Reactor 2 05.05.16 19:42 Hrs 05.05.16 19:42 Hrs

400 KV Bus-I 04.05.16 19:12 Hrs 05.05.16 18:46 Hrs


Bus 400 KV
400 KV Bus-II 04.05.16 19:11 Hrs 05.05.16 18:46 Hrs

Saharanpur-Saharanpur
Line Bay (Bay no-209) 220KV 04.05.16 22:29 Hrs 07.05.16 17:14 Hrs
(UPPTCL) Line Bay
Saharanpur-Nanauta
Line Bay (Bay no-208) 220KV 04.05.16 22:28 Hrs 07.05.16 18:10 Hrs
(UPPTCL) Line Bay
Line Bay (Bay no-206) 220KV Future Line Bay 04.05.16 22:27 Hrs
Line Bay (Bay no-207) 220KV Future Line Bay 04.05.16 22:28 Hrs UP State lines are awaited for
Line Bay (Bay no-210) 220KV Future Line Bay 04.05.16 22:30 Hrs power-flow.
Line Bay (Bay no-211) 220KV Future Line Bay 04.05.16 22:30 Hrs
220KV Bus-I 04.05.16 21:59 Hrs 07.05.16 17:14 Hrs
Main Bus 220KV
220KV Bus-II 04.05.16 21:58 Hrs 07.05.16 17:14 Hrs
Transfer Bus
220KV 220KV Transfer Bus 04.05.16 22:35 Hrs 07.05.16 17:14 Hrs
(Bay no-201)
Bus Coupler
220KV 220KV Bus Coupler 04.05.16 21:59 Hrs 07.05.16 17:14 Hrs
(Bay no-202)
33/0.4 KV Transformer
Tertiary 33/0.4 KV (Tertiary Transformer) with 06.05.16 22:44 Hrs 09.05.16 16:44 Hrs
bay
Under NRSS-XXI (Extn. Package)
Transmission Line with Bay-
Roorkee End 14:04 hrs (From
03.05.16 07.05.16 17:14 Hrs
(Main Bay no-416, Roorkee End)
Roorkee-Saharanpur Line
Tie Bay no-417) 400 KV
36.535 KM S/C (quad)
Saharanpur End 19:11 Hrs (From
(Main Bay no-403, 04.05.16 07.05.16 17:14 Hrs
Saharanpur End)
Tie Bay no-402)
Bagpat to Saharanpur line(Main Saharanpur-Bagpat Line
400 KV 29.01.17 14:03 Hrs 29.01.17 14:18 Hrs
bay no-406 & Tie bay no-405) 122.4 KM S/C (quad)
BATTERY SYSTEM AND ACLT CHANGEOVER SCHEME
OPERATIONAL INTERLOCKS
1. Earth switch-isolator interlock.
2. Isolator-breaker interlock .
3. Earths switch-breaker interlock.
4. Transfer bus interlock.
SUBSTATION AUTOMATION SYSTEM
ABB SCADA SYSTEM IS USED AT SAHARANPUR SUBSTATION. OPERATION CAN
BE DONE AS BELOW:
PROCEDURE FOR REVIVAL OF SAS TERMINAL IN SAS-2 HMI
Computer ON password welcome123#
Double click on sys 600 control Panel.
Press start button
Double click sys 600 monitor Pro
Application :WD
User name :WD
Password :..( leave it blank)
Press login
SUBSTATION AUTOMATION SYSTEM
A window for monitor pro login will pop up
Application : SAHARANPUR
User name :..( leave it blank)
Password :..( leave it blank)
Press login
Minimize all windows screen & got to Desktop
Double click on OPC DA Client control Panel on desktop
A screen of list of OPC DA client instances will pop up
Now click on new instance
A screen of micro scada OPC DA client configuration will pop up
Click on Browse
SUBSTATION AUTOMATION SYSTEM
Double click on instance 1. ini
Pres OK
Wait for 10-15 sec
Again click on new instance
A screen of micro scada OPC DA client configuration will again pop up
Click on Browse
Double click on instance 2. ini
Pres OK
A screen of micro scada OPC DA client configuration will pop up
Click on Browse
Double click on instance 3. ini
Pres OK
Now open OVERVIEW_1v-MONITOR Pro/SAHARANPUR 1

You might also like