3000 A
CT AREVA 45
3000/1 TURNS RATIO
400 KV
CVT AREVA 24
400KV/110 V 3-PHASE
Isolators SIEMENS 43 420KV, 3150A
Surge Arrestors OBLUM 30 336KV SINGLE PHASE
3150A, 400KV, .5mh ,
Wave Trap AREVA 12
BW-90-150,150-500
315 MVA , 50HZ,
400/220/33 KV, 315 MVA Auto VIJAI YNa0D11 VECTOR
Transformer ELECTRICAL 2 GROUP
50 MVAR, 420KV, 68.73A,
50 MVAR Bus Reactor BHEL 2 50HZ
Substation Equipments Population
1600A
CT AREVA 30 1600/1 TURNS
RATIO
220KV
CVT AREVA 24 220KV/110V 3-
PHASE
1600 A
Isolators SIEMENS 37
245KV
216 KV SINGLE
Surge Arrestors OBLUM 24
PHASE
220KV 1600A
Wave Trap AREVA 12 .5mh
PROTECTION SCHEME AND CRITICAL ALARM
SPRING
C
PLCC COMMUNICATION
OPERATIONAL PROCEDURE FOR TAKING
SHUTDOWN
SHUT DOWN PROCESS OF ANY LINE
Open Line Isolator & confirm Remote-end Line Isolator open from
remote end operator.
Close line Earth Switch only in case of PTW for Line Maintenance
work.
Main CB Stuck
Tie CB Tie CB
Close Tie CB
Feeder 1 Feeder 2 Feeder 3 Feeder 4
Saharanpur-Saharanpur
Line Bay (Bay no-209) 220KV 04.05.16 22:29 Hrs 07.05.16 17:14 Hrs
(UPPTCL) Line Bay
Saharanpur-Nanauta
Line Bay (Bay no-208) 220KV 04.05.16 22:28 Hrs 07.05.16 18:10 Hrs
(UPPTCL) Line Bay
Line Bay (Bay no-206) 220KV Future Line Bay 04.05.16 22:27 Hrs
Line Bay (Bay no-207) 220KV Future Line Bay 04.05.16 22:28 Hrs UP State lines are awaited for
Line Bay (Bay no-210) 220KV Future Line Bay 04.05.16 22:30 Hrs power-flow.
Line Bay (Bay no-211) 220KV Future Line Bay 04.05.16 22:30 Hrs
220KV Bus-I 04.05.16 21:59 Hrs 07.05.16 17:14 Hrs
Main Bus 220KV
220KV Bus-II 04.05.16 21:58 Hrs 07.05.16 17:14 Hrs
Transfer Bus
220KV 220KV Transfer Bus 04.05.16 22:35 Hrs 07.05.16 17:14 Hrs
(Bay no-201)
Bus Coupler
220KV 220KV Bus Coupler 04.05.16 21:59 Hrs 07.05.16 17:14 Hrs
(Bay no-202)
33/0.4 KV Transformer
Tertiary 33/0.4 KV (Tertiary Transformer) with 06.05.16 22:44 Hrs 09.05.16 16:44 Hrs
bay
Under NRSS-XXI (Extn. Package)
Transmission Line with Bay-
Roorkee End 14:04 hrs (From
03.05.16 07.05.16 17:14 Hrs
(Main Bay no-416, Roorkee End)
Roorkee-Saharanpur Line
Tie Bay no-417) 400 KV
36.535 KM S/C (quad)
Saharanpur End 19:11 Hrs (From
(Main Bay no-403, 04.05.16 07.05.16 17:14 Hrs
Saharanpur End)
Tie Bay no-402)
Bagpat to Saharanpur line(Main Saharanpur-Bagpat Line
400 KV 29.01.17 14:03 Hrs 29.01.17 14:18 Hrs
bay no-406 & Tie bay no-405) 122.4 KM S/C (quad)
BATTERY SYSTEM AND ACLT CHANGEOVER SCHEME
OPERATIONAL INTERLOCKS
1. Earth switch-isolator interlock.
2. Isolator-breaker interlock .
3. Earths switch-breaker interlock.
4. Transfer bus interlock.
SUBSTATION AUTOMATION SYSTEM
ABB SCADA SYSTEM IS USED AT SAHARANPUR SUBSTATION. OPERATION CAN
BE DONE AS BELOW:
PROCEDURE FOR REVIVAL OF SAS TERMINAL IN SAS-2 HMI
Computer ON password welcome123#
Double click on sys 600 control Panel.
Press start button
Double click sys 600 monitor Pro
Application :WD
User name :WD
Password :..( leave it blank)
Press login
SUBSTATION AUTOMATION SYSTEM
A window for monitor pro login will pop up
Application : SAHARANPUR
User name :..( leave it blank)
Password :..( leave it blank)
Press login
Minimize all windows screen & got to Desktop
Double click on OPC DA Client control Panel on desktop
A screen of list of OPC DA client instances will pop up
Now click on new instance
A screen of micro scada OPC DA client configuration will pop up
Click on Browse
SUBSTATION AUTOMATION SYSTEM
Double click on instance 1. ini
Pres OK
Wait for 10-15 sec
Again click on new instance
A screen of micro scada OPC DA client configuration will again pop up
Click on Browse
Double click on instance 2. ini
Pres OK
A screen of micro scada OPC DA client configuration will pop up
Click on Browse
Double click on instance 3. ini
Pres OK
Now open OVERVIEW_1v-MONITOR Pro/SAHARANPUR 1