You are on page 1of 45

Hoshin Planning

Process

Workshop
Month xx, 20xx
Agenda

- Introduction/Ice Breaker 5 min.

- What is Hoshin Planning? 2 min.

- Why use Hoshin Planning? 24 min.

- How to Use Hoshin 35 min.

- Questions and Answers 15 min.

- Example (tbd) 15 min.

- Wrap Up 5 min.

2 freeleansite.com File Number


What is Hoshin Planning?
Hoshin Planning

Hoshin is a Japanese term = compass needle


- Designates setting strategic direction of the organization

For HOS Hoshin is:


- A closed loop management system for identifying, focusing and linking the
organization to achieve results. Additionally it contains a daily management that
drives constant progress monitoring of these results and reacts to issues as they
arise

Traces roots to:


- Management By Objectives (MBO) Drucker
- Plan-Do-Check-Act (PDCA)- Shewhart/Deming
Sometimes referred to as:
- Policy Deployment
- Management By Policy
- Management By Planning

U.S. Based Companies That Have Embraced It


- Danaher, Hewlett-Packard, Proctor & Gamble, Xerox, Florida Power and Light
(FP&L)

4 freeleansite.com File Number


Why Use Hoshin Planning?
Why do we need Hoshin Planning?

Why?:
- Proper alignment requires more than independent
establishment of strategies
- Hoshin Planning will align those strategies and drive the
execution
- To Achieve Breakthrough RESULTS!

Common Failure Modes:


- No review of actions or accountability
- Plans not visible or not measured or measurable
- Not aligned or linked to the needs of the site

A PROCESS to help drive Results!

6 freeleansite.com File Number


Hoshin is an active relationship between 2 parts

The two parts of Hoshin are


- Hoshin Management
- Daily Management

Hoshin Management (Strategies & Objectives)


- Special actions/plans are required to achieve a desired
result

Daily Management (Routine KPI Management)


- Can achieve targets with usual improvement activity and
resources

Hoshin Has Two Sides

7 freeleansite.com File Number


Why Use Hoshing Planning?

Strategic
Objective
is
Hoshin
Planning Achieved!
Improvement

KAIZEN
Hoshin
Planning
KAIZEN
Hoshin
Base
Planning
KAIZEN Base
Base
Base
Base

Year 0 Year 1 Year 2 Year 3 Year 4

To Build Sustainable Competitive Advantage


8 freeleansite.com File Number
Why Use Hoshin Planning?

VS.

To Align Objectives and Targets


Throughout the Organization

9 freeleansite.com File Number


Daily Management

Daily Management (Routine KPI Management)


- A visual management system to highlight day-to-day issues
that drives rapid implementation of countermeasures.

- A communication tool that drives alignment to the lowest


levels of what is important to the site.

- Strong linkage into the Visual Management and Leadership


Standardized Work systems at the site

Daily, Weekly & Monthly Monitoring of Progress

10 freeleansite.com File Number


Hoshin Planning Summarized
Both Controlled by Rigorous
Process Control Systems and OBJECTIVES
measured frequently to drive Cash
results Growth

QMS
Daily Mgt. Hoshin Management
People
All activities necessary to AOP STRAP
carry out the routine work
for the SBU STRATEGIES
Defined to follow and be governed by
Rapid Problem Solving methods
PDCA
Demonstrated through standardized work
On the shop floor
Controlled and driven through Leadership
Standardized Work in daily gemba walks
11 freeleansite.com File Number
How to Use Hoshin?
What Does Hoshin Planning Mean To You?

Top Mgt
Breakthrough
Middle
Mgt
Kaizen
Supervisor Daily
Management
Front Line
Associate
Adapted From Beyond Strategic Vision, Effective Corporate Action
With Hoshin Planning; Cowley, Domb, 1997 pg. 57

How Should You Spend Your Time?

13 freeleansite.com File Number


Timing of Hoshin Planning

JULY AUGUST SEPT OCT NOV DEC JAN

STRATEGIC PLANNING
HP LEV 1 COMPLETE
ACTION PLAN
DEV COMPLETE
HP LEV 2 & 3
COMPLETE NEW
YEAR
HP
CONCURRENT BUDGETING PROCESS BEGINS

14 freeleansite.com File Number


7 Phase Hoshin Planning Process

Establish
Organizational Vision
PLANNING P Strategic Planning/ Develop 3-5
Year Breakthrough Objectives

Develop Annual Breakthrough


Objectives and Improvement
Priorities
Self-Diagnosis Catchball
Deploy Improvement Priorities
D Lean SS
Implement
IMPLEMENTATION CAP
A Improvement Initiatives

REVIEW Root Cause Monthly Review Critical Step


Countermeasures
C
Annual Review
Annual Review

15 freeleansite.com File Number


The Process of Critical Thinking (PCT)

Step 1 : WHAT
Breakthrough Thinking

Step 2 : HOW FAR


Annual Breakthroughs

Step 3 : HOW
Identify Key Driver Process

Step 4 : HOW MUCH/ WHEN


Determine Measures & Track

Step 5 : WHO
Identify Key Resources &
Deploy

16 freeleansite.com File Number


PCT Step 1 WHAT?

World-Class
Breakthrough
Objective
Best-In-Class

Industry Standard GAP

Current
Current Situation
Situation

Breakthrough Thinking Leads us to World Class


17 freeleansite.com File Number
PCT Step 2 - HOW FAR?

Breakthrough
Objective

Annual BT Objectives Yr 3 Yr 3
Annual BT Objectives Yr 2 Yr 2
Yr 1
Annual BT Objectives Yr 1
Current Situation

Identify First Year Breakthrough Objective

18 freeleansite.com File Number


PCT Step 3 - HOW?

Improvement Annual Breakthrough


Why? Objective
Priority
Why?
GAP
Why?
Why?
Current Situation
Why?

Identify Key Driver Processes

19 freeleansite.com File Number


PCT Step 4 - HOW MUCH/ WHEN?

100

Determine Measures & Track

20 freeleansite.com File Number


PCT Step 5 - WHO?

100% 100%
Resource A
3%
Current Team B 20% Relative
Distribution Impact On
20% Improvement
Of Resources
Resource C Priorities

Resource D 40%

Team E
0% 0%

Identify Key Resources & Deploy

21 freeleansite.com File Number


Daily Management and Hoshin Planning

Once Breakthrough is achieved


process is standardized to
Daily Management! Strategic
Improvement

Objective is
Hoshin Achieved!
Planning
KAIZEN
Hoshin
Planning
KAIZEN
Hoshin Daily
Planning Mgmt
Daily
KAIZEN
Mgmt
Daily
Foundation Mgmt
for Daily Daily
Mgmt Mgmt
HP

Year 0 Year 1 Year 2 Year 3 Year 4


22 freeleansite.com File Number
PCT & the Top Level HP Matrix

HOW

Top Level
All items
Improvement
Priorities
are listed HOW
HOW Annual WHO
in priority order
Breakthrough
Targets
to Improve MUCH
FAR Objectives

starting from
3-5 Year
Breakthrough
Annual Metrics the center
Objectives

RESOURCES

WHAT = Primary Responsibility

= Secondary Responsibility

OWNER

23 freeleansite.com File Number


Complete Top Level HP Matrix

3- HOW Use dots to show


relationship of Targets
and Resources to the
Use dots to show
relationship of
Improvement Priority
5- WHO
Improvement Priorities to
Annual Objectives

Top Level
Improvement
Priorities NOTE: Only Solid dots on
a resource deploy to the
Annual Targets next level
Breakthrough to Improve
2- HOW Objectives

FAR 3-5 Year


Breakthrough
Objectives

4- HOW RESOURCES

MUCH = Primary Responsibility

1- WHAT = Secondary Responsibility

OWNER

The whole picture of your company on one sheet of paper!

24 freeleansite.com File Number


Linkage on the Matrix

Top Level
Improvement
Priorities
Dots show Annual Targets
linkage from Breakthrough To
Target back to Objective Improve
Breakthrough
for that level 3-5 Year
Breakthroughs

25 freeleansite.com File Number


Points to Remember about the Matrix

As soon as a solid dot is placed above a resource, that resource


will get a lower level matrix or an action plan.
Clear circles indicate support resources. They do NOT get a
lower level matrix or action plan unless they get a solid dot on
another matrix.
The dots are TOP LEVEL - Company
Danaher Business System Office - Policy Deployment 1998

to be used as
a sanity check Top Level

The Improvement
Improvement
Priorities

Annual Targets
Breakthrough to
Objectives Improve

3-4 year

Priority is deployed
Breakthrough
Objectives

Resources
l Primary Responsibility
m Secondary Responsibility

to the lower level SECOND LEVEL - Plant


Second Level Policy Deployment

matrix or an action
plan Second Level
Improvement
Priorities

Top Level
Targets to
Improvement
Improve
Priorities

Annual
Breakthrough
Objectives

RESOURCES
l Primary Responsibility
m Secondary Responsibility

26 freeleansite.com File Number


Transferring Improvement Priorities to the 2nd Level

TOP LEVEL The 2nd level 12 oclock and


TOP LEVEL Policy Deployment 2004
3 oclock positions have all
Imp. Priorities new text in them nothing
and Annual is rotated into them from
Objectives are level 1.
Top Level

copied directly
Improvement
Priorities

onto the 2nd


Annual Target to
Breakthrough Improve
Objectives

Level HP. 3-5 Year


Breakthrough
Objectives

Matrices. l
m
Resources
Primary Responsibility
Secondary Responsibility

SECOND LEVEL
Second Level Policy Deployment

Typically, a 2nd
Level Matrix is
created for a Second Level
Improvement

primary resource Priorities

Top Level

for each top-level Improvement


Priorities
Target to
Improve

Improvement Annual
Breakthrough
Objectives

Priority. l
m
RESOURCES
Primary Responsibility
Secondary Responsibility

27 freeleansite.com File Number


Transferring Improvement Priorities To The 3rd Level

SECOND LEVEL Not always suggesting


SECOND LEVEL Policy Deployment 2004
you need 3rd Level.
Top Level and Based on size, complexity,
Second Level breadth, and maturity of
Imp. Priorities organization.
Second Level

are copied
Improvement
Priorities

Top Level

directly onto Improvement


Priorities
Target to
Improve

the 3nd Level Annual


Breakthrough
Objectives

HP Matrices. l
m
Resources
Primary Responsibility
Secondary Responsibility

THIRD LEVEL
THIRD Level Policy Deployment

If necessary, a 3rd
Level Matrix is
created for a Third Level
Improvement

primary resource Priorities

Second Level

for each second- Improvement


Priorities
Target to
Improve

level Improvement Top Level


Improvement
Priorities

Priority. l
m
RESOURCES
Primary Responsibility
Secondary Responsibility

28 freeleansite.com File Number


Completing the Second Level PD Matrix

Use dots to show


3- HOW relationship of Targets and 5- WHO
Use dots to show Resources to the
relationships between Improvement Priorities
Improvement Priorities
and Annual Objectives

2nd Level
Improvement
2- HOW Priorities Use dots as a check to make sure
Top Level
Improvement
Targets
to
the Improvement Priorities & Targets
Priorities Improve
meet the goal and support the
Annual
Breakthrough Annual Breakthrough Objectives
Objectives

RESOURCES

4- HOW
1- HOW FAR MUCH/WHEN
= Primary Responsibility

= Secondary Responsibility
OWNER

29 freeleansite.com File Number


Cascading Priorities to ACTION
TOP LEVEL
Company/Group
Danaher Business System Office - Policy Deployment 1998

Top
Point of Impact - Action Plan
The level where root causes are
Level
Improvement
Priorities

Annual
Breakthrough
Objectives
Target to
Improve
SECOND
LEVEL addressed! Action Plans can be
3-5 Year
Breakthrough
Objectives

Resources

Plant/Business
l Primary Responsibility
m Secondary Responsibility

Second Level Policy Deployment


initiated out of any matrix level.

Second
Level
Improvement
Priorities

Top
Level Target to
Improvement Improve
Priorities

Annual
Breakthrough

ROOT CAUSE
Objectives

POINT OF IMPACT -
RESOURCES
l Primary Responsibility
m Secondary Responsibility

LEVEL- ACTION PLAN


Sub Plant/Dept Engineer/Supv
Cascade as many times as Second Level Policy Deployment

necessary to the Im provem ent Priority Title: *

Review Team : *
Policy Deployment Action Plan
Departm ent/Location: Managem ent Ow ner:
* *
Date: *

Next Review : *

Root Cause Level Environm ental Situation Sum m ary: *

Tim eline
Target Im provem ent
Core Objective: *

POINT
Third
= Original Plan x = Progress at Review
Level Planned 2003 Status
Im pact
Improvement Action Step/ Kaizen Events Ow ner (Lead is bold) Milestone Dates Jan Feb M ar Apr M ay June July Aug Sept Oct Nov Dec ( P a st D u e i n R e d )
Priorities

Second
Level
Improvement
Priorities
Target to
Improve OF
Top
Level
Improvement
Priorities
IMPACT
RESOURCES
l Primary Responsibility
m Secondary Responsibility

30 freeleansite.com File Number


Creating Action Plans
Hoshin Planning Action Plan
Departm ent/Location: Managem ent Ow ner:
Im provem ent Priority Title: * Date: *
* *

Review Team : * Next Review : *

Environm ental Situation Sum m ary: *


Create an Action Plan
Tim eline
Core Objective: *

Planned
= Original Plan x = Progress at Review
2004
Target Im provem ent

Status
For every Improvement
Im pact
Action Step/ Kaizen Events Ow ner (Lead is bold) Milestone Dates Jan Feb M ar Apr M ay June July Aug Sept Oct Nov Dec ( P a st D u e i n R e d )

Priority at the Point of


Impact

Step 4: Identify the


impacts on the
improvement priority and
top level breakthrough
objective

Step 3: What is the


Step 1: current status of the
Determine Step 2: Record action. Color code
actions & write ownership and background as red to
on worksheets timing of the actions show items past due.

31 freeleansite.com File Number


Action Steps Complete the Cause & Effect Chain

Breakthrough Objective:
Attain competitive advantage in Delivery Performance
Effect = Results!
Annual BT Objective #1:
Streamline Engineer-to-Order Processes

Top Level Improvement Priority:


Effect = Cause
Use HOS Tools to improve value stream of
Engineer-to-Order Process

Second Level Improvement Priority:


Implement Improved Order Entry Process Effect = Cause
POINT
Action Step 1: OF
IMPACT
VSM Customer Service Process

POINT
Action Step 2: OF
IMPACT
SW Kaizen to improve productivity
by 35% Actions = Cause
POINT
OF
Action Step 3: IMPACT
VRK to reduce Quote processing time
by 50%

32 freeleansite.com File Number


Where VSM and Fits Into The Process

Breakthrough Objectives

Annual BT Objectives

Top Level Imp Priorities

2nd Level Imp Priorities

Value Stream Mapping

Action Plans

33 freeleansite.com File Number


Action Plans Drive The Rate Of Improvement

Hoshin Planning Action Plan


Departm ent/Location: Managem ent Ow ner:
Im provem ent Priority Title: * Date: *
* *

Review Team : * Next Review : *

Environm ental Situation Sum m ary: *

Tim eline
Target Im provem ent
Core Objective: *
= Original Plan x = Progress at Review
Planned 2004 Status
Im pact
Action Step/ Kaizen Events Ow ner (Lead is bold) Milestone Dates Jan Feb M ar Apr M ay June July Aug Sept Oct Nov Dec ( P a st D u e i n R e d )

DASHBOARD/SCORECARD

34 freeleansite.com File Number


Scorecards

Targets To
Improve JOP Jumping Off Point from
are entered in which you started tracking the target
priority order
YTD ACT Each month this field gets
updated (is YTD from the monthly
fields located to the right)

Planned targets are established for each month based


on the overall Target to Improve.
An actual that is a miss from the plan, is color coded red

35 freeleansite.com File Number


Each Target is Copied to the Top Level Scorecard

Reduce New Prod. Dev. Cycle

TOP LEVEL
IMPROVEMENT Dev. Cycle to 120 Days by 12/95
Increase Market Share to 60%

PRIORITIES

Human Resources Dept.


Engineering Department
Production Department

Marketing Department
Materials Department

Finance Department
TARGET

Sales Department
ANNUAL
BT TO
OBJECTIVES
IMPROVE

3-5 YEAR
BREAKTHROUGH
OBJECTIVE

RESOURCES

= Primary Responsibility

= Secondary Responsibility

TOP LEVEL MATRIX TOP LEVEL SCORECARD CHART

36 freeleansite.com File Number


Scorecards are Created for All HP Matrices

TOP LEVEL
Danaher Business System Office - Policy Deployment 1998
Title
SCORECARD

Top Level
Improvement
Priorities

Annual Target s to
Breakthrough Improve
Objectives

3-5 year
Breakthrough
Objective

Resources
l Primary Responsibility
m Secondary Responsibility

SECOND LEVEL
Second Level Policy Deployment

SCORECARD

2nd Level
Improvement
Priorities

Targets to
Top Level Improve
Improvement
Priorities

Annual Breakthrough
Objectives

RESOURCES
l Primary Responsibility
m Secondary Responsibility

37 freeleansite.com File Number


The Review Process Ensure Plan and Learn
Execute To Conduct Regular
The Plan P Reviews

A D

C
Execute to the plan and perform daily, weekly and monthly reviews of
each action plan (Daily Mgt.)

Reviews are designed to keep the Hoshin Plan on track


- Improvement Action owners dont come to be evaluated
- The intent is to present the results of self assessment
The review team provides focused assistance primarily around the
owners analytical process and preparation.
- What did you plan to do? (Plan)
- What did you actually achieve? (Do)
- How does actual vs. target compare (CHECK)
- Standardize whats working, implement countermeasures and/or plan again as
required. (ACT)

38 freeleansite.com File Number


Manage Daily Management Through Leadership Standard Work

Embed the Hoshin Plans into Leadership Standard


Work

Make the Hoshin review process part of the daily,


weekly and monthly audit process

The key is to constantly monitor progress and drive


accountability to the lowest level

39 freeleansite.com File Number


Third Level HP Countermeasure Sheet
Improvement Priority: Process and organization to grow Printos sales in textiles and ceramics
Targets to Improve: Increase Printos valve/module sales in textiles & ceramics from $100k to $2,500k in 2003

Run Chart Pareto (the


(the "Why"
"Why"you
youmissed)
missed)
2003 Plan
$500 50%50%
2003
2003 Actual
Plan
$450
$400 2003 Actual 40%40%
$350
30%30%
$300
$250
20%20%
$200
$150
10%10%
$100
$50 0% 0%
Delayed
Delayed Evaluation Insufficient
Kit DelayedSales
Insufficient Print Delayed Print Engine
$0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Evaluation Kit
Development Sales Engine
Prospects Delivery
2003 Plan $0 $20 $3 $65 $65 $123 $345 $397 $286 $333 $400 $453 Development Prospects Delivery
2003 Actual $0 $21 $22 $61 $136 $164 $330 $350 $150 %
Percent 45%
45% 35% 35%
20% 20%

Problem Statement:
$136k monthly miss is due to Delayed Evaluation Kit Development, Insufficient Sales Prospects and Delayed Print Engine
Delivery.

Countermeasures
What Who When How Much (Impact)
Addressed Root Cause: Delayed Evaluation Kit Development
Short-Term:
Short-Term: Assign additional Engineer to complete evaluation
Short-Term: MJF 10/28/03
kit development (delayed one month) in time for ITMA show. $61
Long-Term: JBR Long-Term:
Long-Term: Update Tollgate process to include Engineering
12/15/03
development for necessary targeted-vertical launch kits.
Addressed Root Cause: Insufficient Sales Prospects
Execute Sales Funnel Targets for UK 'T' Shirt outlettwice per DW/HW 10/15/03 $48
week follow-up on Sales Funnel Targets with Sales Engineer.
Addressed Root Cause: Delayed Print Engine Delivery
Execute kanban re-sizing process for Printos at once per quarter
RZ/ MJF 10/22/03 $27
frequency (currently twice-per-yearwhich is not frequent
enough for ramping production).
5 Why Analysis

Systematic method to drive to the true root cause(s) of a


problem

Simply ask why in a step ladder approach until fundamental


root cause is discovered. Root cause is not simply listing the
symptoms of a problem

Normally, after up to 5 steps, the true root cause(s) will be


exposed

41 freeleansite.com File Number


Action Plans vs. Countermeasures?

Countermeasures are
reactive they address how
60 to get back to plan when a
goal is missed for a period
50

40
HP miss Jump Off Point (JOP)
to stretch target

30

Action Plans are proactive


20 they address how to achieve
a particular goal from the
10 Plan Actual
jump off point (JOP) to the
stretch target
0
J F M A M J J A S O N D

Inventory Reduction Plan

42 freeleansite.com File Number


Monthly HP/ISC Review Agenda Format

Establish the Growth Agenda for


Monthly PD is typically an 8 hour meeting

Todays HP Review 5%
Financial Review 15%
Hoshin Planning 60%
- Road Blocks to Growth, Major
Predetermined Topics Follow a typical
- Established HP Growth Initiatives MOR session
- New Product Development
- Remaining HP Elements (Q, D,C)
KPIs
People/Org. Issues 20%
Other Business

43 freeleansite.com File Number


Hoshin Planning Summary
Aligns Strategy and Execution

Systematically develops and links plans from


organizational vision to operational tactics

Ensures deep and common understanding and


maximizes ownership and buy-in to plan

Requires thoughtful, detailed planning for each and


every improvement action

Consistently assesses actual performance vs. plan


and addresses issues and learns from the process

All Employees are Engaged in the Process

44 freeleansite.com File Number


Questions?