Key Point
Check Antenna Installation
Check ODU Installation
Check IF Cable Installation
Check IDU Installation
2 Do not reseat IF cables The ODU and IF board are damaged This point must be imparted
when the power is on. by the reseating of IF cables when to every field engineer,
the power is on. especially the personnel of
the partners.
3 Do not tear up the ODU seal If the seal of the ODU is torn up or This point must be imparted
or remove the ODU cover. the cover of the ODU is removed, the to every field engineer,
vendor will refuse to provide warranty especially the personnel of
services. the partners.
4 Do not damage equipment If the damage is caused by artificial This point must be imparted
with improper operations. factors, the vendor will refuse to to every field engineer,
provide warranty services. especially the personnel of
the partners.
Key Point
Check Antenna Installation
Check ODU Installation
Check IF Cable Installation
Check IDU Installation
Key Point
Check Antenna Installation
Check ODU Installation
Check IF Cable Installation
Check IDU Installation
4 screws should be
fastened.
Key Point
Check Antenna Installation
Check ODU Installation
Check IF Cable Installation
Check IDU Installation
No spare long.
<1.5m.
IF cable temporal
Standby 1 Main 1 Label
Key Point
Check Antenna Installation
Check ODU Installation
Check IF Cable Installation
Check IDU Installation
Height > 1U
IDU Label